Nccco core 2024 test Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Nccco core 2024 test? On this page you'll find 22 study documents about Nccco core 2024 test.

Page 2 out of 22 results

Sort by

NCCCO CORE SAMPLE TEST QUESTION WITH 100% CORRECT ANSWERS 2024
  • NCCCO CORE SAMPLE TEST QUESTION WITH 100% CORRECT ANSWERS 2024

  • Exam (elaborations) • 8 pages • 2024
  • NCCCO CORE SAMPLE TEST QUESTION WITH 100% CORRECT ANSWERS 2024
    (0)
  • $14.29
  • + learn more
NCCCO Core Practice Exam (2023/ 2024 Update) Questions and 100% Correct Verified Answers| Grade A
  • NCCCO Core Practice Exam (2023/ 2024 Update) Questions and 100% Correct Verified Answers| Grade A

  • Exam (elaborations) • 16 pages • 2023
  • Available in package deal
  • NCCCO Core Practice Exam (2023/ 2024 Update) Questions and 100% Correct Verified Answers| Grade A Q: From which two points should the boom be measured? Answer: From the boom hinge pins to the center of the boom tip sheave Q: What is the preferred method of installing wire rope from a reel onto a hoist drum? Answer: The rope runs from the top of the reel to the top of the drum Q: Over which quadrant are truck crane capacities usually greater? Answer: Over the rear. ...
    (2)
  • $10.49
  • + learn more
NCCCO Core sample test Questions and answers latest update 2024
  • NCCCO Core sample test Questions and answers latest update 2024

  • Exam (elaborations) • 9 pages • 2024
  • NCCCO Core sample test Questions and answers latest update 2024
    (0)
  • $14.49
  • + learn more
NCCCO Core Exam Prep (2024 / 2025 Update) Questions and 100% Correct Verified Answers | Grade A
  • NCCCO Core Exam Prep (2024 / 2025 Update) Questions and 100% Correct Verified Answers | Grade A

  • Exam (elaborations) • 47 pages • 2024
  • Available in package deal
  • NCCCO Core Exam Prep (2024 / 2025 Update) Questions and 100% Correct Verified Answers | Grade A Q: What three functions will not work after two-blocking a crane that has a prevention system? Answer: Boom down, extend the boom and hoist Q: Boom angle on a telescoping boom is measured from above or below horizontal to the ? Answer: Longitudinal axis of the boom base section Q: The line pull of the innermost layer on the hoist drum is than the outermost layer. Answer: Greater Q: Side loading of a c...
    (0)
  • $7.99
  • + learn more
NCCCO Core sample test Question and Answers 2024 Graded A
  • NCCCO Core sample test Question and Answers 2024 Graded A

  • Exam (elaborations) • 14 pages • 2024
  • Available in package deal
  • A frequent inspection is: Daily to monthly 1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? Boom Up (Appendix A to Subpart CC of Part 1926--Standard Hand Signals) 2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? 1% (1926.1431(c)(1) The equipment must be...
    (0)
  • $12.49
  • + learn more
 NCCCO Core + Specialty Test Prep With 100% Correct Answers 2024
  • NCCCO Core + Specialty Test Prep With 100% Correct Answers 2024

  • Exam (elaborations) • 9 pages • 2024
  • Available in package deal
  • NCCCO Core + Specialty Test Prep With 100% Correct Answers 2024
    (0)
  • $13.99
  • + learn more
NCCCO CORE 2024 TEST QUESTIONS ALL ANSWERED
  • NCCCO CORE 2024 TEST QUESTIONS ALL ANSWERED

  • Exam (elaborations) • 9 pages • 2024
  • NCCCO CORE 2024 TEST QUESTIONS ALL ANSWERED Before leveling a mobile crane on outriggers, an operator should ensure: - ANSWERthere is no weight of the crane bearing on any tires Operating a mobile crane with a long boom, on uneven ground, what support condition should be considered? - ANSWER- Keeping 90 degree angle between cylinder rod and pad What is the primary purpose fir a rooster sheave or auxiliary boom point sheave? - ANSWER- Separate the boom hoist lines How many randomly brok...
    (0)
  • $9.89
  • + learn more
NCCCO CORE 2024 TEST QUESTIONS ALL ANSWERED
  • NCCCO CORE 2024 TEST QUESTIONS ALL ANSWERED

  • Exam (elaborations) • 9 pages • 2024
  • NCCCO CORE 2024 TEST QUESTIONS ALL ANSWERED Before leveling a mobile crane on outriggers, an operator should ensure: - ANSWERthere is no weight of the crane bearing on any tires Operating a mobile crane with a long boom, on uneven ground, what support condition should be considered? - ANSWER- Keeping 90 degree angle between cylinder rod and pad What is the primary purpose fir a rooster sheave or auxiliary boom point sheave? - ANSWER- Separate the boom hoist lines How many randomly brok...
    (0)
  • $9.29
  • + learn more
NCCCO CORE SAMPLE TEST QUESTION WITH 100% CORRECT ANSWERS 2024
  • NCCCO CORE SAMPLE TEST QUESTION WITH 100% CORRECT ANSWERS 2024

  • Exam (elaborations) • 8 pages • 2024
  • Available in package deal
  • NCCCO CORE SAMPLE TEST QUESTION WITH 100% CORRECT ANSWERS 2024
    (0)
  • $14.19
  • + learn more
Nccco Core + Specialty Test Prep 2024
  • Nccco Core + Specialty Test Prep 2024

  • Exam (elaborations) • 9 pages • 2024
  • Available in package deal
  • ASME B30.5 - Mobile and Locomotive cranes, all types ASME B30.3 - Tower Cranes ASME B30.23 - Personel Lifting Regs OSHA 29 CFR 1926.1400 Series - Cranes & Derrick's used in Construction regs. Rotation Resistant Wire Rope - 2 randomly broken wires in 6 diameters. 4 randomly broken wires in 30 diameters. Safety factor 5.0 Safety factor personel lifts 10-1 ASME B30.9 - Slings Personel Platforms ASME B30.23 - Maximum Wind 15mph Cranes capacity not exceed 50% Riggi...
    (0)
  • $11.49
  • + learn more