Generation operation Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Generation operation? On this page you'll find 1255 study documents about Generation operation.

Page 2 out of 1.255 results

Sort by

PJM Generation Operation Exam 2024 Questions with 100% Correct Answers | Verified | Latest Update 2024 | 100% pass
  • PJM Generation Operation Exam 2024 Questions with 100% Correct Answers | Verified | Latest Update 2024 | 100% pass

  • Exam (elaborations) • 15 pages • 2024
  • Available in package deal
  • PJM Generation Operation Exam 2024 Questions with 100% Correct Answers | Verified | Latest Update 2024 | 100% pass
    (0)
  • $13.48
  • + learn more
PJM Generation Operation Exam - Questions and Answers
  • PJM Generation Operation Exam - Questions and Answers

  • Exam (elaborations) • 6 pages • 2024
  • Available in package deal
  • PJM Generation Operation Exam - Questions and Answers Control center facilities must have a minimum of how many days of fuel for the backup generator? 5 days If PJM ACE shows overgeneration, actual imports are: Less than scheduled Who should a generator contact at PJM to clear an outage ticket? Master Coordinator To correct for a slow or fast clock, system frequency schedules are offset by: +/-.02 Hz What frequency would PJM set to correct for fast-time error? 59.98Hz What frequency would PJM ...
    (0)
  • $13.49
  • + learn more
PJM Generation Operation Exam 2024 Questions and Answers
  • PJM Generation Operation Exam 2024 Questions and Answers

  • Exam (elaborations) • 8 pages • 2024
    (0)
  • $12.49
  • + learn more
Stationary Engineer Questions And Answers
  • Stationary Engineer Questions And Answers

  • Exam (elaborations) • 38 pages • 2023
  • How much clearance from the top of the boiler is needed for a HP boiler that produces 70000 lbs of steam? - Answer- 7 feet On a gas fired boiler what is the proper gas to air mixture - Answer- 30%-70% and in special arrangements it can be as high as 100% . ANSWER CHAPTER 11 remember% What is the total hardness in a system that was found to have calcium hardness of 60ppm and magnesium hardness of 18ppm and carbon hardness of 12 ppm? - Answer- TH=(Ca x 2.5) + (Mg x 4.1)nTH=(60 x 2.5) + (18...
    (1)
  • $14.99
  • 2x sold
  • + learn more
NERC Prep - Bal, Int, & Trans Exam Questions and Answers 2023-2024 Graded A+
  • NERC Prep - Bal, Int, & Trans Exam Questions and Answers 2023-2024 Graded A+

  • Exam (elaborations) • 22 pages • 2023
  • Available in package deal
  • NERC Prep - Bal, Int, & Trans Exam Questions and Answers Graded A+. What group can approve a change in the Disturbance Recovery Period for an Interconnection? a. NERC Interconnection Working Group b. NERC Operating Committee c. NERC Regional Council d. NERC Disturbance Analysis Working Group c. Check targets and equipment - What is the first thing an operator should do after a relay operation? a. Check power system stabilizers b. Notify adjacent Transmission and Balancing areas c. Che...
    (0)
  • $15.49
  • 1x sold
  • + learn more
PJM Generation Operation Exam 2024 Questions and Answers
  • PJM Generation Operation Exam 2024 Questions and Answers

  • Exam (elaborations) • 8 pages • 2024
    (0)
  • $12.49
  • + learn more
PJM Generator Exam - Questions and Answers
  • PJM Generator Exam - Questions and Answers

  • Exam (elaborations) • 5 pages • 2024
  • Available in package deal
  • PJM Generator Exam - Questions and Answers PJM issues a heavy load voltage schedule. Member companies who own generation facilities should ensure voltage regulators on generating units are in service on automatic. A unit being dispatched economically by PJM should set its MW output based on the unit's dispatch rate or desired MW level. A fossil steam unit is considered fuel limited when it is not capable of running at its maximum capacity for the next 72 hours During system restoration prior ...
    (0)
  • $13.49
  • 1x sold
  • + learn more
PJM Generation Operation Exam 2024 Questions with Correct Answers
  • PJM Generation Operation Exam 2024 Questions with Correct Answers

  • Exam (elaborations) • 7 pages • 2024
  • Available in package deal
  • PJM Generation Operation Exam 2024 Questions with Correct Answers Control center facilities must have a minimum of how many days of fuel for the backup generator? - Correct Answer 5 days If PJM ACE shows overgeneration, actual imports are: - Correct Answer Less than scheduled Who should a generator contact at PJM to clear an outage ticket? - Correct Answer Master Coordinator To correct for a slow or fast clock, system frequency schedules are offset by: - Correct Answer +/-.02 Hz Wha...
    (0)
  • $9.99
  • + learn more
Real Estate Brokerage SAE - Champion's School of Real Estate| 291 questions and answers
  • Real Estate Brokerage SAE - Champion's School of Real Estate| 291 questions and answers

  • Exam (elaborations) • 40 pages • 2023
  • Search Engine Optimization (SEO) The process of maximizing the number of visitors to a particular website by ensuring the website appears high on the list of results returned by a search engine. Fcebook Live Video streaming through facebook. CoStar Database Functions much like a residential MLS, connecting commercial agents with brokerages, owners, lenders, property managers, appraisers, and investors. Virtual Reality (VR) A computer-generated image or environment that c...
    (0)
  • $14.49
  • 2x sold
  • + learn more
Principle of Operation of D.C. generators, E.M.F Equation, O.C.C. of a D.C. Generator.
  • Principle of Operation of D.C. generators, E.M.F Equation, O.C.C. of a D.C. Generator.

  • Summary • 60 pages • 2023
  • Principle of Operation of D.C. generators, E.M.F Equation, O.C.C. of a D.C. Generator.
    (0)
  • $10.99
  • + learn more