PJM
PJM
Page 3 out of 73 results
Sort by
-
PJM Test Questions & Correct Answers | Latest Update |Already Graded A+
- Exam (elaborations) • 52 pages • 2024
-
- $13.49
- + learn more
Which of the following balancing control modes is used by PJM under normal 
operations? 
: Tie-Line Bias 
Which of the following influences does PJM consider when performing their system load 
forecast? 
: Weather Conditions & Day of the Week 
All of the following are limits that must be submitted to PJM for generating units 
EXCEPT: 
1. Eco Min 
2. Eco Max 
3. Emergency Max 
4. Dynamic Instability 
: Dynamic Instability 
If PJM experienced an event that caused the loss of a 1,000 MW generato...
-
PJM Generation Cert Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+
- Exam (elaborations) • 46 pages • 2024
- Available in package deal
-
- $14.39
- + learn more
Actions in low voltage alert? 
: Review transmission & generation outages 
Request reactive reserve check 
Heavy load voltage schedule warning purpose is to have members prepare far max 
support of voltages on the? 
: Bulk Power System 
Manual load dump warning & reduction of Non-critical plant load issued when? 
: Primary reserve is less the the largest generating unit. 
Loss of transmission facility jeopardize reliability after all possible measures have been 
taken to increase reserves 
Hot...
-
PJM Questions & Correct Answers | Latest Update |Already Graded A+
- Exam (elaborations) • 47 pages • 2024
-
- $13.49
- + learn more
During System Restoration, what is the optimal Frequency Range? 
: 59.75 - 61 Hz 
The 500 kV system has normal bus voltages between? 
: 500 to 550 kV 
When Connecting 2 islands, the operator must match? 
: Voltage, Phase Angle and Frequency 
What are the Minimum Source Requirements-(500kV+) for a 500 kV? 
: 30 MW Gen/mile of energized 500 kV and 20 MW Load/mile of energized 500 kV 
When will PJM issue a Minimum Generation Alert? 
: When expected generation levels fall within 2500 MW of normal op...
-
PJM Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+
- Exam (elaborations) • 24 pages • 2024
- Available in package deal
-
- $12.99
- + learn more
What is the threshold for having a satellite phone? 
: 500 MW 
How often is reactive testing completed? 
: 5 years 
Which of the following would NOT be a cause for a sudden deviation in the balancing 
area ACE? 
1) Incorrect interchange number 
2) Loss of a tie-line RTU 
3) Loss of internal load 
4) Loss of adjacent control area generation 
: Loss of adjacent control area generation 
PJM should be made aware of any fuel shortage that a generator may experience. This 
information assists in ana...
-
PJM Transmission Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+
- Exam (elaborations) • 49 pages • 2024
- Available in package deal
-
- $13.49
- + learn more
During System Restoration, what is the optimal Frequency Range? 
: 59.75 - 61 Hz 
The 500 kV system has normal bus voltages between? 
: 500 to 550 kV 
When Connecting 2 islands, the operator must match? 
: Voltage, Phase Angle and Frequency 
What are the Minimum Source Requirements for a 500kV line? (Gen/mile and load/mile) 
: 30 MW Gen/mile of energized 500 kV and 20 MW Load/mile of energized 500 
kV 
When will PJM issue a Minimum Generation Alert? (how many MW under normal 
operating limits)...
Make study stress less painful
-
PJM Practice Exam 2024 with 100% correct answers
- Exam (elaborations) • 6 pages • 2024
- Available in package deal
-
- $14.49
- + learn more
Real time transmission constraints or contingencies may be alleviated with generators operating________. A. below 60 Hz. B. on a new price curve. C. on a new cost curve. D. off cost (out of merit). - correct answer off cost (out of merit) 
 
What is the minimum size for a solar park to be required to have real and reactive power 
telemetry? A. 1 MW. B. 3 MW C. 5 MW D. 7 MW - correct answer 3 MW 
 
PJM calls for which of the following to recover the ACE so that tie line schedules are maintain...
-
PJM Generation Dispatch Exam 2024 with 100% correct answers
- Exam (elaborations) • 6 pages • 2024
-
- $16.49
- + learn more
Which of the following statements is correct concerning PJM assuming frequency control of the restoration process? 
 
A) PJM assumes control once an external transmission tie has been established. 
B) Once an Area Control Error can be calculated, PJM will assume control. 
C) Whenever it becomes too much of a burden for any one Transmission Owner within the RTO 
D) Whenever the Transmission Owners within the RTO agree to let PJM control the process. - correct answer C) Whenever it becomes too m...
-
PJM Transmission Exam Study Questions with Complete Solutions
- Exam (elaborations) • 32 pages • 2024
-
- $12.89
- + learn more
During System Restoration, what is the optimal Frequency Range? - 59.75 - 61 Hz 
The 500 kV system has normal bus voltages between? - 500 to 550 kV 
When Connecting 2 islands, the operator must match? - Voltage, Phase Angle and 
Frequency 
What are the Minimum Source Requirements for a 500kV line? (Gen/mile and load/mile) - 
30 MW Gen/mile of energized 500 kV and 20 MW Load/mile of energized 500 kV 
When will PJM issue a Minimum Generation Alert? (how many MW under normal operating 
limits) - Wh...
-
PJM Generation Dispatcher Sample Exam 2024 with 100% correct answers
- Exam (elaborations) • 7 pages • 2024
- Available in package deal
-
- $16.49
- + learn more
Real time transmission constraints or contingencies may be alleviated with generators operating : 
 
A. below 60 hertz 
B. on a new price curve 
C. on a new cost curve 
D. off cost ( out of merit) - correct answer D. off cost ( out of merit ) 
 
Monitoring LMP may give insights into : 
 
A. system constraints 
B. system voltage 
C. system frefuency 
D. time error - correct answer A. system constraints 
 
PJM calls for which of the following to recover the ACE so that tie line schedules are m...
-
PJM Markets Certification Exam
- Exam (elaborations) • 18 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
PJM Markets Certification Exam
Study stress? For sellers on Stuvia, these are actually golden times. KA-CHING! Earn from your study resources too and start uploading now. Discover all about earning on Stuvia