- Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about ? On this page you'll find 262 study documents about .
All 262 results
Sort by:
-
Exam (elaborations)
OSCM Exam 2 Questions with Correct Answers Latest Update 2025/2026
-
---4December 20252025/2026A+
- OSCM Exam 2 Questions with Correct Answers Latest Update 2025/2026 
Project - Answers A series of related jobs usually directed toward some major output and requiring a significant period of time to perform. 
Project Management - Answers Planning, directing, and controlling resources (people, equipment, material) to meet the technical, cost, and time constraints of a project. 
Pure project - Answers A structure for organizing a project where a selfcontained team works full time on the project. 
...
-
$11.89 More Info
joshuawesonga22
-
Exam (elaborations)
OSCM Exam 3 Questions with Correct Answers Latest Update 2025/2026
-
---4December 20252025/2026A+
- OSCM Exam 3 Questions with Correct Answers Latest Update 2025/2026 
Demand Management - Answers Recognizing, influencing, and prioritizing demand so it aligns with company capabilities. 
Demand Sensing - Answers Detecting changes in customer demand in real time. 
Demand Shaping - Answers Influencing demand through promotions, pricing, or communication. 
Demand Shifting - Answers Moving demand to different time periods to balance load. 
CPFR - Answers Collaborative planning between supply chain p...
-
$11.39 More Info
joshuawesonga22
-
Exam (elaborations)
OSCM CH23 Exam Questions and Answers Already Passed Latest Update 2025-2026
-
---3September 20252025/2026A+
- OSCM CH23 Exam Questions and Answers Already Passed Latest Update 
Goldratt's Rules of Production Scheduling - Answers *Do not balance capacity, balance the flow. 
 
*The level utilization of a nonbottleneck resource is not determined by its own potential but by some other constraint in the system. 
 
*Utilization and activation of a resource are not the same. 
 
*An hour lost at a bottleneck is an hour lost for the entire system. 
 
*An hour saved at a nonbottleneck is a mirage. 
 
*Bottlen...
-
$10.99 More Info
joshuawesonga22
-
Exam (elaborations)
OSCM-CH. 4 Exam Questions and Answers Already Passed Latest Update 2025-2026
-
--2September 20252025/2026A+Available in bundle
- OSCM-CH. 4 Exam Questions and Answers Already Passed Latest Update 
________transform product specifications and new process technology into a new or revised production system. - Answers New process design and development projects 
Acton Corporation has identified a way to combine several existing technologies into a new product. This is most likely to have occurred in a: - Answers Next-generation development project. 
The stage of a product/process innovation in which managers determine the ta...
-
$10.89 More Info
joshuawesonga22