- Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about ? On this page you'll find 262 study documents about .

All 262 results

Sort by:

OSCM-CH. 4 Exam Questions and Answers 100% PASS
  • Exam (elaborations)

    OSCM-CH. 4 Exam Questions and Answers 100% PASS

  • OSCM-CH. 4 Exam Questions and Answers 100% PASS
  • SophiaBennett
    $13.99 More Info
OSCM test 1 Questions and Answers 100% PASS
  • Exam (elaborations)

    OSCM test 1 Questions and Answers 100% PASS

  • OSCM test 1 Questions and Answers 100% PASS
  • SophiaBennett
    $13.99 More Info
OSCM Exam 2 Questions and Answers 100% PASS
  • Exam (elaborations)

    OSCM Exam 2 Questions and Answers 100% PASS

  • OSCM Exam 2 Questions and Answers 100% PASS
  • SophiaBennett
    $14.99 More Info
OSCM CH23 Exam Questions and Answers 100% PASS
  • Exam (elaborations)

    OSCM CH23 Exam Questions and Answers 100% PASS

  • OSCM CH23 Exam Questions and Answers 100% PASS
  • SophiaBennett
    $13.99 More Info
OSCM Ch. 2 Exam Questions and Answers 100% PASS
  • Exam (elaborations)

    OSCM Ch. 2 Exam Questions and Answers 100% PASS

  • OSCM Ch. 2 Exam Questions and Answers 100% PASS
  • SophiaBennett
    $13.99 More Info
OSCM Ch 1 Exam Questions and Answers 100% PASS
  • Exam (elaborations)

    OSCM Ch 1 Exam Questions and Answers 100% PASS

  • OSCM Ch 1 Exam Questions and Answers 100% PASS
  • SophiaBennett
    $13.99 More Info
OSCM Exam 2 Questions with Correct Answers Latest Update 2025/2026
  • Exam (elaborations)

    OSCM Exam 2 Questions with Correct Answers Latest Update 2025/2026

  • OSCM Exam 2 Questions with Correct Answers Latest Update 2025/2026 Project - Answers A series of related jobs usually directed toward some major output and requiring a significant period of time to perform. Project Management - Answers Planning, directing, and controlling resources (people, equipment, material) to meet the technical, cost, and time constraints of a project. Pure project - Answers A structure for organizing a project where a selfcontained team works full time on the project. ...
  • joshuawesonga22
    $11.89 More Info
OSCM Exam 3 Questions with Correct Answers Latest Update 2025/2026
  • Exam (elaborations)

    OSCM Exam 3 Questions with Correct Answers Latest Update 2025/2026

  • OSCM Exam 3 Questions with Correct Answers Latest Update 2025/2026 Demand Management - Answers Recognizing, influencing, and prioritizing demand so it aligns with company capabilities. Demand Sensing - Answers Detecting changes in customer demand in real time. Demand Shaping - Answers Influencing demand through promotions, pricing, or communication. Demand Shifting - Answers Moving demand to different time periods to balance load. CPFR - Answers Collaborative planning between supply chain p...
  • joshuawesonga22
    $11.39 More Info
OSCM CH23 Exam Questions and Answers Already Passed Latest Update 2025-2026
  • Exam (elaborations)

    OSCM CH23 Exam Questions and Answers Already Passed Latest Update 2025-2026

  • OSCM CH23 Exam Questions and Answers Already Passed Latest Update Goldratt's Rules of Production Scheduling - Answers *Do not balance capacity, balance the flow. *The level utilization of a nonbottleneck resource is not determined by its own potential but by some other constraint in the system. *Utilization and activation of a resource are not the same. *An hour lost at a bottleneck is an hour lost for the entire system. *An hour saved at a nonbottleneck is a mirage. *Bottlen...
  • joshuawesonga22
    $10.99 More Info
OSCM-CH. 4 Exam Questions and Answers Already Passed Latest Update 2025-2026
  • Exam (elaborations)

    OSCM-CH. 4 Exam Questions and Answers Already Passed Latest Update 2025-2026

  • OSCM-CH. 4 Exam Questions and Answers Already Passed Latest Update ________transform product specifications and new process technology into a new or revised production system. - Answers New process design and development projects Acton Corporation has identified a way to combine several existing technologies into a new product. This is most likely to have occurred in a: - Answers Next-generation development project. The stage of a product/process innovation in which managers determine the ta...
  • joshuawesonga22
    $10.89 More Info
As you read this, a fellow student has made another $4.70
How did he do that? By selling his study resources on Stuvia. Try it yourself!