MGMT 404 (MGMT404)

Devry University

Here are the best resources to pass MGMT 404 (MGMT404). Find MGMT 404 (MGMT404) study guides, notes, assignments, and much more.

All 186 results

Sort by

Week8_MGMT404 Final Course Project Plan MGMT 404: Project Management
  • Week8_MGMT404 Final Course Project Plan MGMT 404: Project Management

  • Other • 42 pages • 2023
  • Executive Summary Coffee has turned into a prevalent refreshment where it isn't simply required in the mornings however for the day, regardless of whether they are en route to work or just to sit and unwind. Anarki Coffee Shop will be a spot that serves standard and strength espresso, and little baked good things that are situated in a conspicuous neighborhood close to a train station or a high pedestrian activity zone. It is unprecedented to discover an espresso place that has a warm, ho...
    (0)
  • $15.49
  • + learn more
 MGMT 404 MGMT 404 Getta Byte Software Project Charter
  • MGMT 404 MGMT 404 Getta Byte Software Project Charter

  • Other • 4 pages • 2023
  • Getta Byte Software Project Charter Getta Byte stated few basic information required for a good project charter. They identified the reason for needing a new billing system and who they wanted to consult in order to get the job done, we swell as a budget for doing so. They also mentioned the risks of transmitting data into the new system and working with such a tight budget. However, the team failed to discuss high level project approval requirements, and selecting a project manager. As t...
    (0)
  • $11.99
  • + learn more
Getta_Byte_Software_project Week 4 Week 4: Course Project Part 2
  • Getta_Byte_Software_project Week 4 Week 4: Course Project Part 2

  • Other • 14 pages • 2023
  • Getta Byte Software project 1.1 Project goals and objectives The Getta Byte Software project is a mission that is formed with the main goal in mind of substituting the on-going manual online-based billing system that will enable a concise, easy, and fast data entry system. It is worth noting that the existing system has the capability of helping the company to carry out the duties in daily operations. This is quite fine, but there are a few challenges that call for an online system. The fi...
    (0)
  • $14.49
  • + learn more
 MGMT 404 Felix_Lopez_Getta_Byte Software_projectFinal Week 8: Course Project Part 4
  • MGMT 404 Felix_Lopez_Getta_Byte Software_projectFinal Week 8: Course Project Part 4

  • Other • 18 pages • 2023
  • 1. Introduction 1.1 Project goals and objectives The Getta Byte Software project is a mission that is formed with the main goal in mind of substituting the on-going manual online-based billing system that will enable a concise, easy, and fast data entry system. It is worth noting that the existing system has the capability of helping the company to carry out the duties in daily operations. This is quite fine, but there are a few challenges that call for an online system. The first concern ...
    (0)
  • $13.99
  • + learn more
MGMT 404: Project Management/Week8_MGMT404 Final Course Project Plan
  • MGMT 404: Project Management/Week8_MGMT404 Final Course Project Plan

  • Exam (elaborations) • 42 pages • 2023
  • Available in package deal
  • 1. EXECUTIVE SUMMARY...................................................................................................3 2. PROJECT CHARTER.......................................................................................................6 3. PROJECT SCOPE STATEMENT....................................................................................11 4. WORK BREAKDOWN STRUCTURE / PROJECT SCHEDULE....................................25 5. RISK MANAGEMENT PLAN..................................
    (0)
  • $16.49
  • + learn more
MGMT 404 Getta Byte Software Project Charter/Getta Byte Software Project Charter MGMT 404
  • MGMT 404 Getta Byte Software Project Charter/Getta Byte Software Project Charter MGMT 404

  • Other • 4 pages • 2023
  • Available in package deal
  • Getta Byte Software Project Charter Getta Byte stated few basic information required for a good project charter. They identified the reason for needing a new billing system and who they wanted to consult in order to get the job done, we swell as a budget for doing so. They also mentioned the risks of transmitting data into the new system and working with such a tight budge
    (0)
  • $9.49
  • + learn more
Getta_Byte_Software_project Week 4/MGMT404 Week 4: Course Project Part 2
  • Getta_Byte_Software_project Week 4/MGMT404 Week 4: Course Project Part 2

  • Other • 14 pages • 2023
  • Available in package deal
  • Contents 1. Introduction 3 1.1 Project goals and objectives 3 1.2 Management of the project 4 1.3 Internal and external factors that may affect processes and procedure of the project 4 2 Stakeholder Engagement Plan 10 3 Communication management plan 11 4 Project Scope Statement 13 1. Introduction Getta Byte Software project 1.1 Project goals and objectives The Getta Byte Software project is a mission that is formed with the main goal in mind of substituting the on-going manual online...
    (0)
  • $11.49
  • + learn more
 MGMT 404 Felix_Lopez_Getta_Byte_Software_project_Final/MGMT404 Week 8: Course Project Part 4 (GRADED A) | UPDATED 2023
  • MGMT 404 Felix_Lopez_Getta_Byte_Software_project_Final/MGMT404 Week 8: Course Project Part 4 (GRADED A) | UPDATED 2023

  • Exam (elaborations) • 18 pages • 2023
  • Available in package deal
  • Contents 1. Introduction 3 1.1 Project goals and objectives 3 1.2 Management of the project 4 1.3 Internal and external factors that may affect the processes and procedure of the project 5 1.4 Project Charter 6-9 2 Stakeholder Engagement Plan 10-11 3 Communication management plan 11-12 4 Project Scope Statement 13-16 5 WBS And the Project Schedule 17 5.1 WBS 18 5.2 Project scheduling 19 Getta Byte Software project 5.3 Gantt Chart 20 6 Resource Allocation and Budget Reports 21 7 E...
    (0)
  • $12.49
  • + learn more
MGMT 404 Week 6 Course Project Part 3 (Includes Sections E and F); The Getta Byte – New Billing System Project (GRADED A) | UPDATED 2023
  • MGMT 404 Week 6 Course Project Part 3 (Includes Sections E and F); The Getta Byte – New Billing System Project (GRADED A) | UPDATED 2023

  • Other • 21 pages • 2023
  • Available in package deal
  • GETTA BILL SOFTWARE – BILLING SYSTEM PROJECT Introduction Getta Bill Software will be replacing the current billing system with a cloud-based system that is accurate and easy to use that reduces billing errors by 15%. The goal is to have ease of use software and to improve the transaction speed by 30%, while also implementing dynamic reporting. The goal is to complete the development of the project by August 15, migrate customer data to cloud by August 25, have the first pilot completed ...
    (0)
  • $14.49
  • + learn more