A1 - ANSWER-check and test ( not at activity)
C1 - ANSWER-capable of repair
C1 will be assigned for all items for which the SM&R code indicates? - ANSWER-repair
should be performed by the activity unless there is a deficiency in equipment (X2), skill
(X3), or technical data (X6) that prevents repair
C3 - ANSWER-limited repair ( I level can repair limited)
D1 - ANSWER-Full D-Level Capability. Code signifies an activity as being DRP
D1 - ANSWER-full level capability. item with full range of failure be completed, repaired,
reworked, or overhauled (DRP code)
D3 - ANSWER-Partial D-Level Capability
D3 - ANSWER-Partial D-Level Capability
M1 - ANSWER-assemblies and manufacturers ( I level activity)
R1 - ANSWER-Repair and return to originating activity ( only used with 05A)
What are the TCC and TCC DT codes - ANSWER--X2 test equipment and special tools
required to perform maintenance on the component is not available
-X3- use when specific MOS is required
-X6- when W/C ICRL must place the required publication on order through CTPL
-TCC DT- must not exceed 180 days and will be reviewed and updated semi annual.
What BCM correlates with A1 - ANSWER-BCM 5
What BCM correlates with C3 - ANSWER-BCM 7
What BCM correlates with X1? - ANSWER-BCM 1
What BCM correlates with X2 - ANSWER-BCM 2
What BCM correlates with X3 - ANSWER-BCM 3
What BCM correlates with X6 - ANSWER-BCM 6
What BCM correlates with X8 - ANSWER-BCM 8