100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

Bailey Bridge Exam Questions And Answers Verified 100% Correct

Rating
-
Sold
-
Pages
3
Grade
A+
Uploaded on
12-12-2025
Written in
2025/2026

Bailey Bridge Exam Questions And Answers Verified 100% Correct Where are all of the measurements taken from for the rollers during site layout? - ANSWER -The center of the roller to the center of the next roller How many total personnel are needed to construct a TD Bailey bridge? (Manpower only) - ANSWER -98 (6 NCO, 92 enlisted) How many transoms per bay are required to support vehicles over class 70? - ANSWER -4 What is the assembly time for an 80-foot SS bridge during daylight with trained personnel? - ANSWER -2 hrs What is the longitudinal spacing between plain rollers? - ANSWER -25ft What is the maximum lift obtainable using launching-nose links? - ANSWER -94 1/2 inches At the outset of World War II, the US Army sought a versatile bridge that could span a variety of gaps and be quickly assembled by __________________. - ANSWER -manpower alone How long is a steel truss section? - ANSWER -10ft Where would you insert the transoms as the panels of the third bay are being placed? - ANSWER -in the second bay What is the short panel pin used for? - ANSWER -pin the end posts of the outer middle trusses in a triple truss bridge What is the vertical lift when the launching-nose link is positioned at 10 feet and 40 feet? - ANSWER -67 (1/2) inches True or False: When jacking down the Single-Single bridge, the jacks must be operated on only one end of the bridge at a time. - ANSWER -true What is the assembly time for a 120-foot DD during mission-oriented protection posture (MOPP) conditions? - ANSWER -... How is the class of the bridge determined? - ANSWER -By the type of vehicles it must carry How many rocking rollers are needed for a 150-foot TS bridge on the near and far banks? - ANSWER -4 near, 2 far What is the safety setback on an unprepared abutment with a bank height 7 feet? - ANSWER -7 (1.5) = 10.5ft What component(s) is / are added to get the greatest strength in a Bailey bridge? - ANSWER -third story Which two points are used to measure the gap between two unprepared abutments? - ANSWER -toe of slope Given a 210-foot TT bridge. What is the position of launching-nose links? - ANSWER -30x40ft How many personnel does the routine repair detail consists of? - ANSWER -6 How many personnel does the maintenance party usually consist of for important bridges subject to enemy action? - ANSWER -entire assembly crew What is the required safety setback on an unprepared abutment if the bank height is 6 feet? - ANSWER -(1.5) 6ft = 9ft

Show more Read less
Institution
Bailey Bridge
Course
Bailey Bridge








Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Bailey Bridge
Course
Bailey Bridge

Document information

Uploaded on
December 12, 2025
Number of pages
3
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

Bailey Bridge Exam Questions And
Answers Verified 100% Correct
Where are all of the measurements taken from for the rollers during site layout? -
ANSWER -The center of the roller to the center of the next roller

How many total personnel are needed to construct a TD Bailey bridge?
(Manpower only) - ANSWER -98 (6 NCO, 92 enlisted)

How many transoms per bay are required to support vehicles over class 70? -
ANSWER -4

What is the assembly time for an 80-foot SS bridge during daylight with trained
personnel? - ANSWER -2 hrs

What is the longitudinal spacing between plain rollers? - ANSWER -25ft

What is the maximum lift obtainable using launching-nose links? - ANSWER -94
1/2 inches

At the outset of World War II, the US Army sought a versatile bridge that could
span a variety of gaps and be quickly assembled by __________________. -
ANSWER -manpower alone

How long is a steel truss section? - ANSWER -10ft

Where would you insert the transoms as the panels of the third bay are being
placed? - ANSWER -in the second bay

What is the short panel pin used for? - ANSWER -pin the end posts of the outer
middle trusses in a triple truss bridge

What is the vertical lift when the launching-nose link is positioned at 10 feet and
40 feet? - ANSWER -67 (1/2) inches
$9.99
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
TopGradeGuru
1.5
(2)

Get to know the seller

Seller avatar
TopGradeGuru Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
10
Member since
1 year
Number of followers
0
Documents
2429
Last sold
1 month ago
GRADEHUB

We provide access to a wide range of professionally curated exams for students and educators. It offers high-quality, up-to-date assessment materials tailored to various subjects and academic levels. With instant downloads and affordable pricing, it's the go-to resource for exam preparation and academic success.

1.5

2 reviews

5
0
4
0
3
0
2
1
1
1

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions