Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 27 pages
Exam (elaborations)

SWM DEQ PLAN REVIEWER EXAM UPDATED 150+ QUESTIONS 2026/2027 || ENVIRONMENTAL COMPLIANCE REVIEW || VERIFIED QUESTIONS & ANSWERS || HIGH-YIELD STUDY GUIDE || COMPLETE TEST BANK || GRADED A+ How long should project records, including approved stormwater mana

Document preview thumbnail
Preview 3 out of 27 pages

SWM DEQ PLAN REVIEWER EXAM UPDATED 150+ QUESTIONS 2026/2027 || ENVIRONMENTAL COMPLIANCE REVIEW || VERIFIED QUESTIONS & ANSWERS || HIGH-YIELD STUDY GUIDE || COMPLETE TEST BANK || GRADED A+ How long should project records, including approved stormwater management plans, be retained for? For three years after permit termination or project completion Rooftop (Impervious Area) Disconnection strategy to manage runoff close to it's source by infiltrating, filtering, or reusing it as it moves from the impervious surface to the drainage system. simple disconnection or disconnection leading Sheet Flow to a Vegetated Filter Strip or Conserved Open Space Filter strips are vegetates areas that treat sheet flow from adjacent impervious and managed turf areas by slowing the flow and allowing sediment and attached pollutants to settle and runoff be filtered by the vegetation Grass Channels reduce SW runoff and pollutants by slowing the flow and allowing sediment and attached pollutants to settle and runoff be filtered by vegetation can be used on managed turf areas including sports fields, and golf courses, and drainage areas with combined impervious turf cover (roads and yards) Soil Compost Amendments applied to compacted soil after construction to improve infiltration and reduce runoff can be used on compacted urban lawns, downspout disconnections, grass

Content preview

SWM DEQ PLAN REVIEWER EXAM UPDATED 150+
QUESTIONS 2026/2027 || ENVIRONMENTAL COMPLIANCE
REVIEW || VERIFIED QUESTIONS & ANSWERS || HIGH-
YIELD STUDY GUIDE || COMPLETE TEST BANK || GRADED
A+

How long should project records, including approved stormwater management
plans, be retained for?
For three years after permit termination or project completion
Rooftop (Impervious Area) Disconnection
strategy to manage runoff close to it's source by infiltrating, filtering, or reusing
it as it moves from the impervious surface to the drainage system.

simple disconnection or disconnection leading
Sheet Flow to a Vegetated Filter Strip or Conserved Open Space
Filter strips are vegetates areas that treat sheet flow from adjacent impervious
and managed turf areas by slowing the flow and allowing sediment and attached
pollutants to settle and runoff be filtered by the vegetation
Grass Channels
reduce SW runoff and pollutants by slowing the flow and allowing sediment
and attached pollutants to settle and runoff be filtered by vegetation

can be used on managed turf areas including sports fields, and golf courses, and
drainage areas with combined impervious turf cover (roads and yards)
Soil Compost Amendments
applied to compacted soil after construction to improve infiltration and reduce
runoff

can be used on compacted urban lawns, downspout disconnections, grass
channels, and filter strips
Vegetated Roofs
alternative roof that has waterproofing and drainage materials and an engineered
growing media designed to support plant growth

,temporarily catch and store rainwater before going into storm drainage system -
vegetative uptake
Vegetative Roof - Intensive
deep growing media layer that ranges from 6 in to 4 ft deep - wide variety of of
plants including trees
Vegetative Roof - Extensive
shallow growing media of 2 in to 6 in and planted with carefully selected,
drought tolerant, plants
Rooftop Disconnection - Simple
whereby rooftops and/or on-lot residential impervious surfaces are directed to a
pervious path
Rooftop Disconnection - Disconnection Leading
one of the following alternative runoff reduction practices: 1. soil compost
amended filter path 2. infiltration by micro-infiltration practice 3. filtration by
rain gardens or micro-bioretention 4. storage and release into stormwater planter
5. storage and reuse into a cistern
Rainwater Harvesting
systems intercept, divert, store, and release rainfall for future reuse - also known
as a cistern

harvested by collecting and storing rainwater in above/under ground storage
tank to be used for non-potable water sources (flushing toliets/car
washes/landscape irrigation etc)

additional BMPS are needed to handle overflow
Permeable Pavement
alternative to asphalt or concrete that allows stormwater to filter through
openings in surface into an underlying stone reservoir for storage or infiltration
to soil
Infiltration
temporary surface or underground storage that allows incoming stormwater
runoff to move through the soil

, chemical and physical adsorption processes remove pollutants
Bioretention Basins
a depressed area that uses a custom of soil mix and plants to reduce stormwater
runoff and filter pollutants - rain water ponds about 6 inches before rapidly
infiltrating

primary component: filter bed - mix of sand, soil, and organic material as
filtering media

uses: parking lot islands, parking lot edges, curb extensions, courtyards,
residential lots
Dry Swales
shallow, linear bioretention cells with a turf/material cover

filters desired treatment volume or runoff will infiltrate to soil - does not retain
water
Wet Swales
intercept groundwater to retain water - allows for settling, vegetative uptake,
and microbial activity

typically less than 6 in deep
Filtering Practices
filters temporarily store and treat stormwater runoff by passing it through am
engineered filter media, collecting the filtered water in an underdrain, then
returning it back to the storm drainage system

filter consists of two chambers: first chamber is for settling, second chamber
serves as filter
Constructed Wetlands
shallow depressions that receive stormwater inputs for water quality treatments
- typicall less than 1' dep

allows settling, vegetative uptake, and microbial activity
Wet Pond

Document information

Uploaded on
December 11, 2025
Number of pages
27
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$23.59

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
dukejosh116
5.0
(2)
Sold
18
Followers
1
Items
1176
Last sold
3 months ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions