Which FDNY document governs temporary construction site fire safety
requirements?
A. OSHA 1910
B. NYC Fire Code & Fire Rules
C. NFPA 25
D. NYC Building Energy Code
Answer: B
Rationale: The S-56 exam is based primarily on the NYC Fire Code and
Fire Rules applicable to construction sites.
2.
Who is responsible for maintaining the site-specific Fire Safety Plan on a
construction site?
A. Site contractor
B. DOB inspector
C. Fire Safety Manager
D. Fire guard only
,Answer: C
Rationale: The Fire Safety Manager ensures the Fire Safety Plan is
current, posted, and followed.
3.
How often must a Fire Safety Manager conduct site fire safety
inspections?
A. Once a week
B. Once per shift
C. Daily
D. Every other day
Answer: C
Rationale: Daily inspections are required to ensure fire safety
conditions are maintained.
4.
Combustible rubbish must be removed from the site at least:
A. Once a month
B. Every two weeks
C. At the end of each work shift
D. When containers are full
Answer: C
Rationale: Construction debris must be cleared daily to reduce fire
load.
5.
Which type of extinguisher must be provided near hot work
operations?
A. Class K
B. Class D
C. Water pump can only
,D. At least one portable extinguisher with a minimum 2-A:20-B:C rating
Answer: D
Rationale: Hot work requires extinguishers capable of addressing both
ordinary combustibles and flammable liquids.
6.
A fire alarm pull station on a construction site must be:
A. Optional
B. Installed at every stairwell entrance
C. Centrally located on each floor
D. Directly connected to the FDNY
Answer: B
Rationale: Fire alarm initiating devices must be placed at required
egress points.
7.
Smoking on a construction site is:
A. Allowed in designated shacks
B. Allowed outdoors
C. Strictly prohibited
D. Allowed after work hours
Answer: C
Rationale: Smoking is prohibited to reduce fire ignition risk.
8.
Which person may authorize hot work on a construction site?
A. Any welder
B. Fire Safety Manager or Responsible Person with FDNY Certificate
C. General laborer
D. Site superintendent only
Answer: B
, Rationale: Hot work must be supervised by a Certificate of Fitness
holder.
9.
A hot work permit is valid for:
A. 24 hours
B. One work week
C. One month
D. Until revoked
Answer: A
Rationale: Hot work permits must be issued daily.
10.
Standpipes in buildings under construction must be kept:
A. Completely dry
B. Operational with at least one hose outlet every two floors
C. Pressurized and extended to within one floor of active construction
D. Checked only annually
Answer: C
Rationale: Firefighters require water supply adjacent to active work
levels.
11.
A fire watch during hot work must remain on site for at least:
A. 15 minutes after work
B. 30 minutes
C. 1 hour
D. 2 hours
Answer: C
Rationale: A one-hour post-work fire watch is required to detect
smoldering fires.
Manager ExamWith Actual Questions &
Verified Answers, Plus Explained
Rationales/Expert Verified For
Guaranteed Pass 2026/Latest
Updated/Instant Download Pdf
1.
Which FDNY document governs temporary construction site fire safety
requirements?
A. OSHA 1910
B. NYC Fire Code & Fire Rules
C. NFPA 25
D. NYC Building Energy Code
Answer: B
Rationale: The S-56 exam is based primarily on the NYC Fire Code and
Fire Rules applicable to construction sites.
2.
Who is responsible for maintaining the site-specific Fire Safety Plan on a
construction site?
A. Site contractor
B. DOB inspector
C. Fire Safety Manager
D. Fire guard only
,Answer: C
Rationale: The Fire Safety Manager ensures the Fire Safety Plan is
current, posted, and followed.
3.
How often must a Fire Safety Manager conduct site fire safety
inspections?
A. Once a week
B. Once per shift
C. Daily
D. Every other day
Answer: C
Rationale: Daily inspections are required to ensure fire safety
conditions are maintained.
4.
Combustible rubbish must be removed from the site at least:
A. Once a month
B. Every two weeks
C. At the end of each work shift
D. When containers are full
Answer: C
Rationale: Construction debris must be cleared daily to reduce fire
load.
5.
Which type of extinguisher must be provided near hot work
operations?
A. Class K
B. Class D
C. Water pump can only
,D. At least one portable extinguisher with a minimum 2-A:20-B:C rating
Answer: D
Rationale: Hot work requires extinguishers capable of addressing both
ordinary combustibles and flammable liquids.
6.
A fire alarm pull station on a construction site must be:
A. Optional
B. Installed at every stairwell entrance
C. Centrally located on each floor
D. Directly connected to the FDNY
Answer: B
Rationale: Fire alarm initiating devices must be placed at required
egress points.
7.
Smoking on a construction site is:
A. Allowed in designated shacks
B. Allowed outdoors
C. Strictly prohibited
D. Allowed after work hours
Answer: C
Rationale: Smoking is prohibited to reduce fire ignition risk.
8.
Which person may authorize hot work on a construction site?
A. Any welder
B. Fire Safety Manager or Responsible Person with FDNY Certificate
C. General laborer
D. Site superintendent only
Answer: B
, Rationale: Hot work must be supervised by a Certificate of Fitness
holder.
9.
A hot work permit is valid for:
A. 24 hours
B. One work week
C. One month
D. Until revoked
Answer: A
Rationale: Hot work permits must be issued daily.
10.
Standpipes in buildings under construction must be kept:
A. Completely dry
B. Operational with at least one hose outlet every two floors
C. Pressurized and extended to within one floor of active construction
D. Checked only annually
Answer: C
Rationale: Firefighters require water supply adjacent to active work
levels.
11.
A fire watch during hot work must remain on site for at least:
A. 15 minutes after work
B. 30 minutes
C. 1 hour
D. 2 hours
Answer: C
Rationale: A one-hour post-work fire watch is required to detect
smoldering fires.