SWM DEQ PLAN REVIEWER EXAM QUESTIONS AND ANSWERS VERIFIED 100% CORRECT In situations where an initial exemption was applicable because LDAs were related to emergency work, VSMP authority shall be advised of the disturbance within - ANSWER -7 days of commencing the LDA and shall submit a permit application within 30 days of starting the land-disturbing activity Localities with MS4 - ANSWER -must adopt and administer a stormwater program Localities without MS4 - ANSWER -may choose to administer a VSMP or have DEQ administer the program DEQ is responsible for enforcing the ____ while locality ____ are responsible for enforcing local ordinances - ANSWER -Construction GP, VSMP A locality VSMP authority must include enforcement authority and a schedule of civil penalties for enforcement actions in its local ordinance. The maximum penalty the authority may issue is - ANSWER -$32,500 per violation per day Any civil penalty assessed by a court as a result of a summons issued by a locality VSMP authority must be paid - ANSWER -into the locality's treasury Any person who violates..... shall be subject to a civil penalty not to exceed - ANSWER -$32, 500 Chesapeake Bay Preservation Areas that result in a land disturbance greater than or equal to ____ and less than ____ - ANSWER -2,500 ft^2, 1 acre CBPA LDAs must have - ANSWER -approved E&SC plan, approved SWM plan, local approval to start land disturbance, long-term maintenance agreement, construction record drawings CBPA LDAs do not require - ANSWER -Construction GP, Pollution prevention Plan, Additional control measures to address TMDL State entities and linear projects ___ submit a single set of standards and specifications to DEQ for approval, federal entities ____ - ANSWER -must, may Name the 5 steps in order of the permitting process - ANSWER -submittal of ESC plans and SWM plans, SWM plan review and approval, registration statement entry into Construction GP, Construction GP approved by DEQ, Locality VSMP authority approval to start land disturbance The locality VSMP authority has ___ days to determine the completeness of a stormwater management plan and to notify the applicant of its determination - ANSWER -15 If the plan is complete and the applicant has been notified within 15 days of submission, the locality VSMP authority (plan reviewer) has ___ days from the time of notification to review the plan - ANSWER -60 Operators of a single-family detached residential structures that disturb equal to or greater than one acre of land are - ANSWER -not required to submit a registration statement VSMP authority must keep project records, including approved SWM plans and registration statements, for ___ years after state permit termination or project completion - ANSWER -3 years VSMP authority must keep post construction stormwater management facility inspection records for __ years from the date of inspection - ANSWER -5 DEQ is required to conduct a program review once every - ANSWER -5 years A locality VSMP must be at least as stringent as what state permit? - ANSWER Construction GP What plans must a locality's ordinance require to be submitted and approved? - ANSWER -ESC plan, SWM plan The Construction GP includes ___ different inspection frequencies - ANSWER -2 SWPPP inspection schedule if discharging to impaired waters - ANSWER -at least once every 4 business days or at least once every 5 business days and no later than 24 hours following a measurable storm event SWPPP inspection schedule for standard inspections - ANSWER -at least once every 5 business days, at least once every 10 business days and no later than 24 hours following a measurable storm event For all sites where areas have been temporarily stabilized or LDA have been suspended due to frozen conditions, inspections can be done - ANSWER -once a month Representative inspections may not be used when - ANSWER -utility line installation, pipeline construction, or other similar linear construction activities SWPPP inspection schedule discharge into impaired waters, surface waters with an applicable TMDL or exceptional waters The qualified personnel's SWPPP inspection report must included with the SWPPP no later than - ANSWER -4 days following inspection Corrective actions made based on inspections must be done - ANSWER -as soon as practicable but no later than seven days, or a longer period of time as approved by the VSMP Changes in the SWPPP must be made in a __ day period - ANSWER -7 For reports of unauthorized discharges, must notify DEQ upon discovery within a ___ window and a written report should be submitted within ___ of discovery of discharge - ANSWER -24 hours, 5 days

Content preview

SWM DEQ PLAN REVIEWER EXAM QUESTIONS
AND ANSWERS VERIFIED 100% CORRECT
In situations where an initial exemption was applicable because LDAs were
related to emergency work, VSMP authority shall be advised of the disturbance
within - ANSWER -7 days of commencing the LDA and shall submit a permit
application within 30 days of starting the land-disturbing activity

Localities with MS4 - ANSWER -must adopt and administer a stormwater
program

Localities without MS4 - ANSWER -may choose to administer a VSMP or have
DEQ administer the program

DEQ is responsible for enforcing the ____ while locality ____ are responsible for
enforcing local ordinances - ANSWER -Construction GP, VSMP

A locality VSMP authority must include enforcement authority and a schedule of
civil penalties for enforcement actions in its local ordinance. The maximum
penalty the authority may issue is - ANSWER -$32,500 per violation per day

Any civil penalty assessed by a court as a result of a summons issued by a locality
VSMP authority must be paid - ANSWER -into the locality's treasury

Any person who violates..... shall be subject to a civil penalty not to exceed -
ANSWER -$32, 500

Chesapeake Bay Preservation Areas that result in a land disturbance greater than
or equal to ____ and less than ____ - ANSWER -2,500 ft^2, 1 acre

CBPA LDAs must have - ANSWER -approved E&SC plan, approved SWM plan,
local approval to start land disturbance, long-term maintenance agreement,
construction record drawings

, CBPA LDAs do not require - ANSWER -Construction GP, Pollution prevention
Plan, Additional control measures to address TMDL

State entities and linear projects ___ submit a single set of standards and
specifications to DEQ for approval, federal entities ____ - ANSWER -must, may

Name the 5 steps in order of the permitting process - ANSWER -submittal of ESC
plans and SWM plans, SWM plan review and approval, registration statement
entry into Construction GP, Construction GP approved by DEQ, Locality VSMP
authority approval to start land disturbance

The locality VSMP authority has ___ days to determine the completeness of a
stormwater management plan and to notify the applicant of its determination -
ANSWER -15

If the plan is complete and the applicant has been notified within 15 days of
submission, the locality VSMP authority (plan reviewer) has ___ days from the
time of notification to review the plan - ANSWER -60

Operators of a single-family detached residential structures that disturb equal to or
greater than one acre of land are - ANSWER -not required to submit a registration
statement

VSMP authority must keep project records, including approved SWM plans and
registration statements, for ___ years after state permit termination or project
completion - ANSWER -3 years

VSMP authority must keep post construction stormwater management facility
inspection records for __ years from the date of inspection - ANSWER -5

DEQ is required to conduct a program review once every - ANSWER -5 years

A locality VSMP must be at least as stringent as what state permit? - ANSWER -
Construction GP

Document information

Uploaded on
December 11, 2025
Number of pages
11
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$11.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TheExamMaestro
3.6
(18)
Sold
155
Followers
5
Items
3771
Last sold
6 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions