100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

WGU C215 Final Study Guide Operations Management (Latest update ) Questions and Answers 100% Correct {GRADE A} -WGU

Rating
-
Sold
-
Pages
39
Grade
A+
Uploaded on
08-12-2025
Written in
2025/2026

WGU C215 Final Study Guide Operations Management (Latest update ) Questions and Answers 100% Correct {GRADE A} -WGU Total Quality Management (TQM) Philosophy - correct answer 1. customer focus 2. continuous improvement 3. employee empowerment 4. use of quality tools 5. product design 6. process management 7. managing supplier quality Process Capability Index (Cpk) - correct answer Basic function of Six Sigma. Measures the process potential and performance of processes. The higher the range of Cpk, the improved is the ability of the process to complete its necessities. Six Sigma - correct answer A disciplined, data-driven approach and methodology for eliminating defects (driving toward six standard deviations between the mean and the nearest specification limit) in any process - from manufacturing to transactional and from product to service. Design Capacity - correct answer The theoretical maximum output of a system in a given period under ideal conditions. Location Analysis - correct answer proximity to customers, transportation, source of labor, community attitude, proximity to suppliers, and many other factors. The technique for determining location decisions. Line Processes - correct answer A type of process used to produce a large volume of a standardized product. ■ Limited customization and high volume Batch Processes - correct answer A type of process used to produce a small number of products in groups or batches based on customer orders or specifications. ■ High customization moderate volume Project Processes - correct answer A type of process used to make a one-at-a-time product exactly to customer specifications. ■ Most custom and lowest volume Continuous Processes - correct answer A type of process that operates continually to produce a high volume of a fully standardized product. - No customization and as high a volume as possible Bottleneck - correct answer Longest task in the process. Flexible Manufacturing System (FMS) - correct answer A type of automated system that combines the flexibility of intermittent operations with the efficiency of continuous operations. Output/Input Control - correct answer A technique for monitoring the flow of jobs between work centers. Value-Added - correct answer The net increase created during the transformation of inputs into final outputs. Hybrid Layouts - correct answer Layouts that combine characteristics of process and product layouts. - Group technology layouts.

Show more Read less











Whoops! We can’t load your doc right now. Try again or contact support.

Document information

Uploaded on
December 8, 2025
Number of pages
39
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Content preview

WGU C215 Final Study Guide Operations
Management (Latest update 2026- 2027)
Questions and Answers 100% Correct
{GRADE A} -WGU


Total Quality Management (TQM) Philosophy - correct answer 1. customer focus
2. continuous improvement
3. employee empowerment
4. use of quality tools

5. product design
6. process management

7. managing supplier quality


Process Capability Index (Cpk) - correct answer Basic function of Six Sigma. Measures
the process potential and performance of processes. The higher the range of Cpk, the

improved is the ability of the process to complete its necessities.


Six Sigma - correct answer A disciplined, data-driven approach and methodology for
eliminating defects (driving toward six standard deviations between the mean and

the nearest specification limit) in any process - from manufacturing to transactional
and from product to service.


Design Capacity - correct answer The theoretical maximum output of a system in a

given period under ideal conditions.

, WGU C215 Final Study Guide Operations
Management (Latest update 2026- 2027)
Questions and Answers 100% Correct
{GRADE A} -WGU


Location Analysis - correct answer proximity to customers, transportation, source of
labor, community attitude, proximity to suppliers, and many other factors.


The technique for determining location decisions.


Line Processes - correct answer A type of process used to produce a large volume of

a standardized product.


■ Limited customization and high volume


Batch Processes - correct answer A type of process used to produce a small number
of products in groups or batches based on customer orders or specifications.


■ High customization moderate volume


Project Processes - correct answer A type of process used to make a one-at-a-time

product exactly to customer specifications.


■ Most custom and lowest volume

, WGU C215 Final Study Guide Operations
Management (Latest update 2026- 2027)
Questions and Answers 100% Correct
{GRADE A} -WGU


Continuous Processes - correct answer A type of process that operates continually to
produce a high volume of a fully standardized product.


- No customization and as high a volume as possible


Bottleneck - correct answer Longest task in the process.


Flexible Manufacturing System (FMS) - correct answer A type of automated system

that combines the flexibility of intermittent operations with the efficiency of
continuous operations.


Output/Input Control - correct answer A technique for monitoring the flow of jobs

between work centers.


Value-Added - correct answer The net increase created during the transformation of
inputs into final outputs.


Hybrid Layouts - correct answer Layouts that combine characteristics of process and

product layouts.


- Group technology layouts.

, WGU C215 Final Study Guide Operations
Management (Latest update 2026- 2027)
Questions and Answers 100% Correct
{GRADE A} -WGU


- Cell technology layouts.
- Grocery stores use hybrid layouts


Relationship Chart (REL) - correct answer Table that reflects opinions of managers

with regard to the importance of having any two departments close together.


Rectilinear Distance - correct answer The shortest distance between two locations
using north-south and east-west movements.


From-To Matrix - correct answer Table that gives the number of trips or units of

product moved between any pair of departments.


Block Plan - correct answer Schematic showing the placement of resources in a
facility.


Mean Observed Times - correct answer The average of the observation times for each

of the work elements.


Normal Time - correct answer The mean observed time multiplied by the
performance rating factor by the frequency of occurrence.
$12.49
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
Exambit

Get to know the seller

Seller avatar
Exambit Chamberlain College Of Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
2
Member since
5 months
Number of followers
0
Documents
334
Last sold
2 weeks ago
Exam_bit

As a trusted professional working as a study material sourcing agent, I offer authentic exam papers directly sourced from reputable institutions, (with genuine copyright) my papers serve as invaluable tools to aid aspiring nurses and many other professions in their exam preparations. Backed by my experience and expertise, I ensure that each paper is meticulously crafted. NOTE!! Supper Discounted, Comprehensive Bundle Packages with Seamless Content, Tailored to Summarize & Perfect each Subject. STUDY LESS STUDY SMART

Read more Read less
0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions