Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 10 pages
Exam (elaborations)

CM 3111 Spring Exam Quizzes and Answers | New 2025/2026 Update | With Complete Solutions

Document preview thumbnail
Preview 2 out of 10 pages

CM 3111 Spring Exam Quizzes and Answers | New 2025/2026 Update | With Complete Solutions

Content preview

CM 3111 Spring Exam Quizzes and Answers | New
2025/2026 Update | With Complete Solutions
estimate

The probable total cost of a future activity. They occur in all industries and government agencies.

Identify work items to be completed, Measure work items size, Assess likely cost of work

Basic approach to forming an estimate (3 steps):

conceptual, design

_____ estimates are produced from the owner's notion of the construction and lacks _____

details.

value, cost of development

Two primary factors for project feasibility:

cost profile

The _____ _____ of estimates embraces many constituents and some costs are easy to establish.

Preliminary, cost

_____ estimates and _____ planning are prepared as the design develops. They inform whether

the design meets the budget and provides alternative design cost information.

value analysis

_____ _____ involves justifying improvements to the design.

Preliminary

, _____ estimates can be subdivided into groupings of building components by prices.

Preliminary estimating techniques, Detailed estimating techniques

Two main categories of preparing construction estimates:

Project type, Delivery system, Nature of delivery system contracts

Three influential factors in preparing construction estimates:

traditional (design-bid-build)

Project delivery system where the project is fully designed before work begins.

construction management

Project delivery system that facilitates overlap between project stages and allows earlier

completion.

design-build

Project delivery system where a single organization assumes all responsibility.

lump sum

Type of contract that defines the scope of work for a stipulated sum.

cost plus (time and materials)

Type of contract with an uncertain total cost of construction that is used if work must get

underway or is difficult to define. The contract is followed by costing of operations.

unit price

Document information

Uploaded on
December 6, 2025
Number of pages
10
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
QUINTER
3.6
(73)
Sold
413
Followers
105
Items
40085
Last sold
5 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions