Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 24 pages
Exam (elaborations)

CM 3111 exam 3-Questions and Answers | New 2025/2026 Update | With Complete Solutions

Document preview thumbnail
Preview 3 out of 24 pages

CM 3111 exam 3-Questions and Answers | New 2025/2026 Update | With Complete Solutions

Content preview

CM 3111 exam 3-Questions and Answers | New
2025/2026 Update | With Complete Solutions
Building Construction Estimating

The determination of probable construction costs of any given project.

Design-Build Delivery (DB)

In this delivery system, the contractor acts as both the designer and the general contractor.

Construction Manager Delivery (CM)

In this delivery system, the contractor and some of the key subcontractors are involved in the

design process, providing expertise in construction methods and costs, as well as managing the

construction process.

Integrated Project Delivery (IPD)

In this delivery system, a relatively new delivery system, involving the owners, designers,

contractor and some of the key subcontractors in the design process. Owners, Designers,

Contractor and Key Subcontractors all share governance, risk, contingency, and the profit on the

project.

Conceptual Estimate

An estimate prepared by a contractor based on the project's early plan. Usually drawings are

limited or not available for this type of estimate. The contractor makes assumptions about

virtually every aspect of the project. This estimate is used early in the design process to check if

the owner can actually afford the project.

,Preliminary Estimate

An estimate that is prepared and maintained by the contractor during the design process based on

the current, but incomplete design.

Detailed Estimate

An estimate that includes determination of quantities and costs of everything that is required to

complete the project. (labor, materials, equipment, insurance, bonds, overhead, and an estimate

of the profit) The contractor must have a complete set of contract documents for this type of

estimate.

Assembly Estimating

In this type of estimating the estimator bids the components in groups. This type of estimate can

be prepared in hours instead of days, but this estimate has many broad assumptions and is less

accurate.

Square-Foot Estimates

Estimates that are prepared by multiplying the square footage of a building by a cost per square

foot and then adjusting the price to compensate for differences in the building heights, length of

the building perimeter, and other building components. This type of estimate is helpful to check

whether the project, as designed, is within the owner's budget.

Design Drawings

A single-line floor plan and key elevations.

Parametric Estimates

, These estimates use equations that express the statistical relationship between building

parameters and the cost of the building. The equations used in these estimates are very complex

and may use log functions, ratios of parameter, and multiplication of parameters.

Model Estimating

This type of estimating uses computer models to prepare an estimate based on a number of

questions answered by the estimator. The model makes many assumptions about the design of

the project that it is working on and avoids the site and excavation cost.

Project Comparison Estimates

These estimates are prepared by comparing the cost of a proposed project to a completed project.

The estimator starts with the costs of a comparable project and then makes adjustments for

differences in the project.

Estimator

Often involved solely with the estimating of quantities of materials and the pricing of the project.

Design-Bid-Build (DBB)

For these kinds of projects, the General Contractor makes detailed estimates that are used to

determine what the company will charge to do the work.

Design-Build (DB) or Construction-Manager (CM)

Delivery Systems

For these kinds of projects, the General Contractor's scope of work involves providing assistance

to the owners, beginning with the planning stage, and continuing through the actual construction

of the project.

Document information

Uploaded on
December 6, 2025
Number of pages
24
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
QUINTER
3.6
(73)
Sold
413
Followers
105
Items
40085
Last sold
5 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions