1. What is the primary scope of a Class A General Contractor license in
Colorado?
A. Residential structures only
B. Commercial structures under 3 stories
C. All residential and commercial structures without height or area
limitations
D. Electrical systems only
Rationale: Class A license holders are authorized to build, repair, and
remodel any structure without height/area limits.
2. Who is responsible for obtaining required building permits?
A. The material supplier
B. The city inspector
C. The general contractor
D. The project owner
Rationale: Contractors must ensure all required permits are secured before
work begins.
3. Which document outlines the project timeline, milestones, and
dependencies?
,A. Punch list
B. CPM schedule
C. RFI form
D. Bond rider
Rationale: Critical Path Method (CPM) scheduling identifies the essential
timeline and sequencing.
4. A contractor’s “implied warranty of workmanship” ensures:
A. Work will be free forever
B. Work never needs maintenance
C. Work meets industry standards and is performed properly
D. Work exceeds all codes
Rationale: Contractors must perform work to a competent professional
standard.
5. Which bond guarantees project completion if the contractor defaults?
A. Payment bond
B. Performance bond
C. License bond
D. Bid bond
Rationale: Performance bonds ensure completion or compensation if the
contractor cannot finish.
6. What is the typical retention percentage withheld until project
completion?
A. 1%
B. 3%
C. 5–10%
D. 20%
Rationale: Retainage typically ranges from 5% to 10% to ensure proper
completion.
7. Which party typically prepares the punch list?
A. Material vendor
B. Architect or owner’s representative
, C. OSHA inspector
D. Surety
Rationale: Architects or owners identify incomplete or deficient items
during close-out.
8. What does an RFI stand for?
A. Ready for Inspection
B. Request for Information
C. Required Field Inspection
D. Required Final Inspection
Rationale: RFIs clarify contract documents during construction.
9. Which type of contract sets a fixed price for the entire project?
A. Cost-plus contract
B. Time and materials
C. Lump-sum contract
D. Unit price contract
Rationale: Lump-sum contracts use a predetermined price for the entire
scope.
10. A change order must include:
A. A new bond
B. New permit fees
C. Scope, cost, and time adjustments
D. Insurance renewals
Rationale: Change orders modify contract cost, time, and scope.
11. Which document protects the contractor from liability for completed
work causing future damage?
A. Payment bond
B. Permit
C. Completed operations insurance
D. RFI
Rationale: Completed operations coverage protects after the project is
finished.
Questions And Correct Answers
(Verified Answers) Plus Rationale2026
Q&A| Instant Download Pdf
1. What is the primary scope of a Class A General Contractor license in
Colorado?
A. Residential structures only
B. Commercial structures under 3 stories
C. All residential and commercial structures without height or area
limitations
D. Electrical systems only
Rationale: Class A license holders are authorized to build, repair, and
remodel any structure without height/area limits.
2. Who is responsible for obtaining required building permits?
A. The material supplier
B. The city inspector
C. The general contractor
D. The project owner
Rationale: Contractors must ensure all required permits are secured before
work begins.
3. Which document outlines the project timeline, milestones, and
dependencies?
,A. Punch list
B. CPM schedule
C. RFI form
D. Bond rider
Rationale: Critical Path Method (CPM) scheduling identifies the essential
timeline and sequencing.
4. A contractor’s “implied warranty of workmanship” ensures:
A. Work will be free forever
B. Work never needs maintenance
C. Work meets industry standards and is performed properly
D. Work exceeds all codes
Rationale: Contractors must perform work to a competent professional
standard.
5. Which bond guarantees project completion if the contractor defaults?
A. Payment bond
B. Performance bond
C. License bond
D. Bid bond
Rationale: Performance bonds ensure completion or compensation if the
contractor cannot finish.
6. What is the typical retention percentage withheld until project
completion?
A. 1%
B. 3%
C. 5–10%
D. 20%
Rationale: Retainage typically ranges from 5% to 10% to ensure proper
completion.
7. Which party typically prepares the punch list?
A. Material vendor
B. Architect or owner’s representative
, C. OSHA inspector
D. Surety
Rationale: Architects or owners identify incomplete or deficient items
during close-out.
8. What does an RFI stand for?
A. Ready for Inspection
B. Request for Information
C. Required Field Inspection
D. Required Final Inspection
Rationale: RFIs clarify contract documents during construction.
9. Which type of contract sets a fixed price for the entire project?
A. Cost-plus contract
B. Time and materials
C. Lump-sum contract
D. Unit price contract
Rationale: Lump-sum contracts use a predetermined price for the entire
scope.
10. A change order must include:
A. A new bond
B. New permit fees
C. Scope, cost, and time adjustments
D. Insurance renewals
Rationale: Change orders modify contract cost, time, and scope.
11. Which document protects the contractor from liability for completed
work causing future damage?
A. Payment bond
B. Permit
C. Completed operations insurance
D. RFI
Rationale: Completed operations coverage protects after the project is
finished.