CERTIFICATION PRACTICE TEST
● •contract
•specifications
•contract drawings. Answer: Bid documents include?
● General Conditions. Answer: Codes, standards, Authority Having
Jurisdiction (AHJ), clean-up, safety requirements, barricades, fencing,
insurance and bond requirements, ect.
● Supplementary Conditions. Answer: Addendums, time schedules,
working days allowed, delay agreements, payment schedules
● Construction Specifications Institute (CSI). Answer: Specifications
typically use what format?
● Contractors. Answer: Construction manager concept is when the
owner contracts with the construction manager who oversees
____________ working on the project
,● Design-Build Concept. Answer: Sometimes referred to as a turn-key
type agreement or contract?
● general contractor. Answer: Multiple Prime Contractor Method has the
intent is eliminate the middleman __________ __________.
● •architectural/structural contractor
•mechanical contractor
•electrical contractor. Answer: Multiple prime contractor method involve
more than one prime contractor which consist of?
● •federal government
•general services administration (GSA)
•large companies. Answer: Who commonly uses the multiple prime
contractor method?
● Owner, architect, general contractor, subcontractor. Answer:
Traditional method contract uses the typical chain of command which
is?
● •open bid method
•bid-by invitation procedure
•direct contractor selection. Answer: General contractors can be chosen
in a number of different ways which is?
, ● General category and supplementary conditions. Answer: Contract
conditions is divided into two categories which is?
● Addendum. Answer: Changes to the contract or other modifications.
● •up-front payments
•progress payments
•lump sum. Answer: Types of payment schedules are?
● Bidding requirements, sample forms, conditions of the contract and
specifications, including general conditions and supplementary
conditions. Answer: What comprises the project manual?
● •contract itself
•contract conditions
•specifications
•drawings. Answer: Contract documents include:
● Preliminary, bid, approval, construction, as-built. Answer: Drawings
have different stages which are?