• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 4 out of 37 pages
Exam (elaborations)

General Crane Safety Exam Study Guide 2026 Complete Questions With Correct Detailed Answers || 100% Guaranteed Pass Recent Version

Document preview thumbnail
Preview 4 out of 37 pages

General Crane Safety EXAM STUDY GUIDE 2026 COMPLETE QUESTIONS WITH CORRECT DETAILED ANSWERS || 100% GUARANTEED PASS RECENT VERSION

Content preview

General Crane Safety EXAM STUDY GUIDE 2026
COMPLETE QUESTIONS WITH CORRECT DETAILED
ANSWERS || 100% GUARANTEED PASS <RECENT
VERSION>
General Crane Safety Certification Exam (2026)

Instructions: Choose the best answer for each question.

1. Who is primarily responsible for the safety of the crane operation on the worksite?
A. The Crane Operator
B. The Signal Person
C. The Rigger
D. The Competent Person
✓ A. The Crane Operator

2. According to OSHA, a formal, documented inspection of the crane performed by a
Competent Person must be completed:
A. Daily
B. Monthly
C. Annually
D. Before each shift
✓ D. Before each shift

3. The term "two-blocking" refers to:
A. Using two cranes for a single lift.
B. When the load block contacts the upper block, putting extreme stress on the hoist line.
C. Lifting two separate loads simultaneously.
D. A method for securing a load with two slings.
✓ B. When the load block contacts the upper block, putting extreme stress on the hoist line.

4. What is the primary purpose of an anti-two-block device?
A. To prevent the hoist from overheating.
B. To automatically stop the hoist function before two-blocking occurs.
C. To measure the weight of the load.
D. To stabilize the crane's boom.
✓ B. To automatically stop the hoist function before two-blocking occurs.

,5. A Load Moment Indicator (LMI) system provides the operator with a warning when:
A. The wind speed exceeds 20 mph.
B. The crane is approaching its rated capacity.
C. The outriggers are not fully extended.
D. The load is not properly rigged.
✓ B. The crane is approaching its rated capacity.

6. The minimum safe distance a crane must maintain from energized power lines of 50kV to
200kV is:
A. 10 feet
B. 15 feet
C. 20 feet
D. 25 feet
✓ C. 20 feet

7. Before a crane is moved to a new location on a site, the route should be inspected by:
A. The project manager.
B. the crane operator and a competent person.
C. The truck driver.
D. The signal person.
✓ B. the crane operator and a competent person.

8. The primary role of the rigger is to:
A. Operate the crane controls.
B. Ensure the load is properly secured and balanced for the lift.
C. Signal the crane operator.
D. Inspect the crane's engine.
✓ B. Ensure the load is properly secured and balanced for the lift.

9. A "swing hazard zone" is the area:
A. Directly under the suspended load.
B. Where the crane's counterweight rotates.
C. Around the crane where the load could swing or fall.
D. Inside the operator's cab.
✓ B. Where the crane's counterweight rotates.

10. When a load must be lifted and travel over workers on the site, what is the required
protocol?
A. It is permissible if the workers are wearing hard hats.
B. It is strictly prohibited.

,C. It is allowed if the load is less than 50% of the crane's capacity.
D. It is allowed only with written permission from the site supervisor.
✓ B. It is strictly prohibited.

11. Which of the following is a critical factor in determining a crane's rated capacity?
A. The color of the crane
B. The boom length and angle
C. The operator's experience level
D. The time of day
✓ B. The boom length and angle

12. Outriggers must be:
A. Set on wooden blocks only.
B. Fully extended and on firm, stable ground or cribbing as per the manufacturer's
specifications.
C. Slightly retracted to allow for mobility.
D. Used only on rubber-tired cranes.
✓ B. Fully extended and on firm, stable ground or cribbing as per the manufacturer's
specifications.

13. Hand signals must be:
A. Agreed upon and understood by the operator and signal person before the lift.
B. Yelled loudly.
C. Different on every job site.
D. Used only when radio communication fails.
✓ A. Agreed upon and understood by the operator and signal person before the lift.

14. A "Competent Person" is defined as someone who:
A. Has a college degree in engineering.
B. Is capable of identifying existing and predictable hazards and has the authority to take
corrective measures.
C. Has been operating a crane for more than 5 years.
D. Is the site safety manager.
✓ B. Is capable of identifying existing and predictable hazards and has the authority to take
corrective measures.

15. The practice of using a crane to hoist personnel is:
A. A common and efficient practice.
B. Only permitted when using a designated personnel platform that meets specific OSHA
standards.

, C. Never allowed under any circumstances.
D. Allowed if the personnel are tied off to the load line.
✓ B. Only permitted when using a designated personnel platform that meets specific OSHA
standards.

16. A pre-lift meeting should include:
A. Only the crane operator.
B. The operator, rigger, signal person, and lift director.
C. All workers on the site.
D. Only the site supervisor and the crane operator.
✓ B. The operator, rigger, signal person, and lift director.

17. What does the term "boom angle" refer to?
A. The direction the boom is pointing.
B. The horizontal distance from the center of rotation to the load.
C. The angle between the horizontal and the longitudinal centerline of the boom.
D. The speed at which the boom is raised or lowered.
✓ C. The angle between the horizontal and the longitudinal centerline of the boom.

18. If a crane operator loses sight of the signal person, they should:
A. Continue the lift slowly.
B. Guess the next signal based on the situation.
C. Immediately stop all crane movement until communication is re-established.
D. Use the horn to get the signal person's attention.
✓ C. Immediately stop all crane movement until communication is re-established.

19. Cribbing is used to:
A. Increase the lifting speed of the crane.
B. Decorate the crane.
C. Increase the stability of the crane by distributing its weight over a larger area.
D. Measure the load's weight.
✓ C. Increase the stability of the crane by distributing its weight over a larger area.

20. A "lift director" is responsible for:
A. Only the rigging of the load.
B. Only the signaling.
C. Overall planning and execution of the lift operation.
D. Driving the crane to the site.
✓ C. Overall planning and execution of the lift operation.

Document information

Uploaded on
December 1, 2025
Number of pages
37
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$12.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TrustedExaminer
4.0
(9)
Sold
91
Followers
4
Items
3837
Last sold
2 weeks ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions