Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 32 pages
Exam (elaborations)

WGU D469 Exam 2 – Questions With Right Solutions

Document preview thumbnail
Preview 4 out of 32 pages

WGU D469 Exam 2 – Questions With Right Solutions

Content preview

WGU D469 Exam 2 – Questions With Correct
Solutions

Save




Terms in this set (100)


As part of the contract Specifications
documents, what are the
written documents called
that describe the required
materials, requirements for
the execution of the work,
and workmanship
expected?
a. Construction drawings
b. Contracts
c. Punch lists
d. Specifications
e. Shop drawings

2. Title blocks on False
construction-drawing
sheets are generally placed
along the left side of the
sheet for ease of reading
left to right.
T/F

3. In construction drawings, Readability
the most important aspect
of lettering is its ______________.
a. capitalization
b. stylization
c. readability
d. height
e. calligraphy

,4. The use of modular a. 48-inch (121.9-cm)
components in building
construction is a common
practice, as many of the
components are
manufactured in standard
sizes, such as 16-, 24-, and
___________ (40.6-, 60.9-, and
_______cm).
a. 48-inch (121.9-cm)
b. 30-inch (76.2-cm)
c. 18-inch (45.7-cm)
d. 15-inch (38.1-cm)
e. 9-inch (22.8-cm)

5. Construction drawing g. all of the above
legends combine graphic
symbols with notes and are
used on what type of
drawings?
a. floor plans
b. furniture plans
c. electrical plans
d. lighting plans
e. a and b only
f. c and d only
g. all of the above

6. In a building project, a. True
various contractual
agreements are needed
between the parties
involved in order to detail
each party's
responsibilities.
a. True
b. False

,7. For bidding purposes, e. no
specifications are referred
to as "closed" or "open".
"Closed" means _____
product can be used on
the project other than what
is specified.
a. a replacement
b. a and d only
c. any
d. a substituted
e. no

8. Sometimes a designer c. 10
will require the client to pay
them a "retainer" (a sum of
money) at the beginning of
a project. The usual retainer
is what percent of the total
fees?
a. 2
b. 5
c. 10
d. 15
e. 20

9. What is the most b. framing
common method of
dimensioning, which is
advantageous because it
most closely follows the
construction sequence in
the field and informs the
particular trades of
dimensions that are the
most important to their area
of construction?
a. abbreviated
b. framing
c. additive
d. finished face
e. centerline

, 10. A good practice, to give d. mock-up
an overview of the
sequence of sheets and
their individual contents
before the construction
drawings are drafted up, is
to first create a ______________
set of construction
drawings.
a. bound
b. shop drawings
c. PowerPoint
d. mock-up
e. specification

1. When drafting a b. the same scale
demolition plan(s), in order
to allow the viewer to
ascertain the scale of
objects and features, it is
generally drawn
________________ as the floor
plans.
a. at half the scale
b. the same scale
c. at twice the scaled as a
reversed image
d. three times the scale

2. When no former plans c. field measuring
exist of a building or
interior space to be
renovated, new drawings
must be made through a
process commonly called
_______.
a. replacement
measurements
b. preliminary
measurements
c. field measuring
d. schematic measurements

Document information

Uploaded on
November 28, 2025
Number of pages
32
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$25.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
StudyHall
3.8
(231)
Sold
1347
Followers
825
Items
17187
Last sold
2 days ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions