100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

BCS – Basic Contractor Skills REAL EXAM

Rating
-
Sold
-
Pages
45
Grade
A+
Uploaded on
19-11-2025
Written in
2025/2026

Master the Basic Contractor Skills (BCS) exam with this comprehensive study guide. Includes high-yield practice questions, detailed explanations, and essential concepts to help aspiring contractors reinforce skills, boost confidence, and pass the BCS exam.

Show more Read less











Whoops! We can’t load your doc right now. Try again or contact support.

Document information

Uploaded on
November 19, 2025
Number of pages
45
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Content preview

BCS – Basic Contractor Skills real exam!!




1. Which one of these is not a normal Zoning Regulation?

- Building set backs

- Parking requirements

- Building durability and cost

- Type of allowed building use or activity - ANSWER ✔----Building durability and cost



2. What is the minimum number of points needed to gain a LEED certified rating?

- 60

- 50

- 40

- 80 - ANSWER ✔---- 40



3. The total amount of energy consumed throughout all phases of the material life cycle is
____________?

- Embodied Material

- Embodied Energy

- Embodied Carbon

- Embodied Water - ANSWER ✔----Embodied Energy

,4. A single-purpose entity combines who under one legal contract ?

- The Owner and Contractor

- The Owner, the Architect, the Engineers

- The Architect and the Contractor

- The Owner, entire Design Team, and entire Construction Team - ANSWER ✔---- The Owner, entire
Design Team, and entire Construction Team



5. Who created the Master Format ?

- AISC

- Construction Specification Institute

- American Institute of Architects

- International Code Council - ANSWER ✔----Construction Specification Institute



6. What occupancy classification would be used for a church sanctuary ?

- Assembly

- Institutional

- Educational

- Industrial - ANSWER ✔---- Assembly



7.As a contractor, you will not have influence about design decisions.

-True

-False - ANSWER ✔----False



8. What is left out in the "cradle-to-gate analysis" ?

-Energy used to extract the natural resources

-Energy used to install and maintain the material

-Energy used to manufacture the material

,-Energy used to ship the raw material to the manufacturer - ANSWER ✔----Energy used to install and
maintain the material



9. LEED is governed and enforced by a government agency.

-True

-False - ANSWER ✔----False



10. Fire resistance is listed and categorised by the # of __________.

-buildings

-floors

-minutes

-hours - ANSWER ✔----hours



12. Considering safety or legality are not issues, who should always get final say of any decision being
made during a construction process ?

-Contractor

-Owner

-Architect

-Engineer - ANSWER ✔----Owner



13. Who is responsible for handling all aspects of the building design ?

-Contractor

-Engineer

-Architect

-Manufacturer - ANSWER ✔----Architect



14. What division of the Master Format will concrete be found ?

-05

-03

, -06

-02 - ANSWER ✔----03



15. What type of project delivery method is best suited for a project where a turn key price is
guaranteed to an owner in a bid ?

-None

-Design-Bid-Build

-Design-Build

-Integrated Project Delivery - ANSWER ✔----Design-Bid-Build



16. Which definition most accurately describes the Living Building Challenge ?

-A building will generate 50% of its own energy from on-site renewable resources, consume little fresh
water, and have little net carbon greenhouse gas emissions.

-Create a building that consumes little resources and is very comfortable to live in.

-Annually, a building will generate all its own energy from on-site renewable resources, consume no
fresh water, and have no net carbon greenhouse gas emissions.

-Create a building out of natural, living materials. - ANSWER ✔----Annually, a building will generate
all its own energy from on-site renewable resources, consume no fresh water, and have no net carbon
greenhouse gas emissions.



17. The IBC designates different occupancy classifications. Which one of these is not a classification ?

-Industrial

-Assembly

-Business

-Educational - ANSWER ✔----Industrial



18. What answerwer below best describes a "Cost Plus" payment schedule.

-The owner agrees to pay a contractor a lump sum fee for all costs and services provided.

-A contractor is paid a set price for all costs and work performed.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TUTORWILLIAM NURSING
View profile
Follow You need to be logged in order to follow users or courses
Sold
138
Member since
2 year
Number of followers
55
Documents
3366
Last sold
3 days ago
TUTOR WILLIAM

4.8

75 reviews

5
67
4
4
3
1
2
1
1
2

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions