• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 10 pages
Exam (elaborations)

CONT 1300 EXAM REVIEW QUESTIONS WITH CORRECT ANSWERS 2025

Document preview thumbnail
Preview 2 out of 10 pages

CONT 1300 EXAM REVIEW QUESTIONS WITH CORRECT ANSWERS 2025

Content preview

CONT 1300 EXAM REVIEW QUESTIONS
WITH CORRECT ANSWERS 2025
Offer - CORRECT ANSWER -
A response to a solicitation that, if accepted, would bind the offeror to perform the resultant contract.



Two Types of Offers - CORRECT ANSWER -1. Bid -
An offer to perform the work described in a contract at a specified cost. Government bids are generally
cost-specific, based on the cost of labor, materials, profit, and overhead

2. Proposal -
A government proposal, sometimes called a government contract proposal, is a response written by a
private company to a public government agency for the purchasing of goods or services



Quote - CORRECT ANSWER -Used to obtain pricing for a specific number of well-
defined items (This is a quotation, not an Offer)



Solicitations - CORRECT ANSWER -
Used in negotiated acquisitions to communicate your requirements to prospective contractors and to so
licit proposals



The Lowest Price Technically Acceptable (LPTA) includes - CORRECT ANSWER -
1. Evaluation factors and sub factors shall be in the solicitation

2. Based on Lowest Price and Technically Acceptable Offer

3. Solicitations shall specify that award will be made on basis of LPTA



Risk - CORRECT ANSWER -
A measure of future uncertainties in achieving program goals and objectives within defined cost, sched
ule, and performance constraints



Key Risk elements of a Contract - CORRECT ANSWER -Cost, Schedule, and Performance



Cost risk - CORRECT ANSWER -
An escalation of project costs. It is the risk that the project will cost more than the budget allocated for

, it. Perhaps the most common project risk, cost risk is due to poor budget planning, inaccurate cost esti
mating, and scope creep



Schedule risk - CORRECT ANSWER -
Activities will take longer than expected and is typically the result of poor planning or unforeseen circu
mstances.



Performance risk - CORRECT ANSWER -
The riskVthat the project will fail to produce results consistent with project specifications.



Proposal analysis is done by a contracting officer to determine proposed prices to be and in
all contract actions - CORRECT ANSWER -Fair and Reasonable



Proposal Analysis Techniques - CORRECT ANSWER -1. Price

2. Cost

3. Cost Realism

4. Technical Analysis

5. Unit Pricing and Unbalanced Pricing



Cost Realism Analysis - CORRECT ANSWER -
The process of independently reviewing and evaluating specific elements of each offeror's proposed cos
t estimate to determine whether the estimated proposed cost elements



Direct Cost - CORRECT ANSWER -Any cost directly identified with a single, final cost objective



Indirect Cost - CORRECT ANSWER -
Any cost not directly identified with a single, final cost objective, but identified with two or more final c
ost objectives or with at least one intermediate cost objective



Cost realism may be used for fixed price contracts when - CORRECT ANSWER -
1. New requirements may not be fully understood by competing offerors

2. There are quality concerns

Document information

Uploaded on
November 18, 2025
Number of pages
10
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$13.89

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Sold
22
Followers
2
Items
4283
Last sold
2 weeks ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions