Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 16 pages
Exam (elaborations)

BCS Studio A final questions and correct answers

Document preview thumbnail
Preview 3 out of 16 pages

BCS Studio A final questions and correct answers

Content preview

BCS Studio A final questions and
correct answers
What is the purpose of a concrete key between a concrete footing and the base of a concrete
wall? - <CORRECT ANSWER >>It ties the wall to the footing and prevents it from slipping or
sliding on the slab.


GMP - <CORRECT ANSWER >>A guaranteed maximum price (also known as GMP, not-to-exceed
price, NTE, or NTX) contract is a cost-type contract (also known as an open-book contract)
where the contractor is compensated for actual costs incurred plus a fixed fee subject to a
ceiling price.


The International Building Code - <CORRECT ANSWER >>a model building code developed by
the International Code Council (ICC). It has been adopted for use as a base code standard by
most jurisdictions in the United States.


First published in 1997


Life-Cycle Analysis - <CORRECT ANSWER >>is a technique to assess environmental impacts
associated with all the stages of a product's life from raw material extraction through materials
processing, manufacture, distribution, use, repair and maintenance


Sustainable Construction Techniques - <CORRECT ANSWER >>Prefabricating Materials in
Controlled Environments


Construction Waste Management


Managing the Site for Improved Environment


Lean Manufacturing to Reduce Energy

,Material Selection


Leadership in Energy and Environmental Design (LEED) - <CORRECT ANSWER >>one of the most
popular green building certification programs used worldwide.[7] Developed by the non-profit
U.S. Green Building Council (USGBC) it includes a set of rating systems for the design,


Building codes purpose - <CORRECT ANSWER >>to protect public health, safety and general
welfare as they relate to the construction and occupancy of buildings and structures.


Zoning regulations - <CORRECT ANSWER >>Written regulations and laws that define how
property in specific geographic zones can be used. Zoning ordinances specify whether zones
can be used for residential or commercial purposes, and may also regulate lot size, placement,
bulk (or density) and the height of structures.


Occupancy classifications - <CORRECT ANSWER >>categorizing structures based on their usage
and are primarily used for building and fire code enforcement. They are usually defined by
model building codes, and vary, somewhat, among them.


Master Format - <CORRECT ANSWER >>a standard for organizing specifications and other
written information for commercial and institutional building projects in the U.S. and
Canada.[1] Sometimes referred to as the "Dewey Decimal System" of building construction,
masterformat is a product of the Construction Specifications Institute (CSI) and Construction
Specifications Canada (CSC). It provides a master list of Divisions, and Section numbers with
associated titles within each Division, to organize information about a facility's construction
requirements and associated activities.


Architect/Contractor relations - <CORRECT ANSWER >>A positive relationship between the
architect and contractor is important because it helps the construction project flow smoothly
from start to finish. When contractors and architects develop a positive relationship and
communicate effectively, disagreements can be minimized (if not avoided altogether) and the
project can move efficiently from one phase to the next.

, Project delivery methods - <CORRECT ANSWER >>Construction Management at Risk (CMR)
Design-Bid-Build (DBB)
Design-Build (DB)
Multi-Prime (MP)
Owner Control.
Owner Relationships.
Project Budget.
Project Schedule.


The IBC classifies certain building types to describe their fire resistance. Which type(s) have
combustible materials?


Type I
Type V
Type III
Types III, IV, & V - <CORRECT ANSWER >>z


What system is normally used to dewater a site?


Answers:
Well point system
French drain system
Weep diches
Open it up and let the sun dry it out - <CORRECT ANSWER >>Well point System


Clays and silts can be classified as what type of soil?

Document information

Uploaded on
November 17, 2025
Number of pages
16
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$14.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
EliteStudyHub
2.0
(11)
Sold
94
Followers
6
Items
9668
Last sold
3 days ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions