BCS Comprehensive Questions and
Correct Answers
1. Which one of these is not a normal Zoning Regulation?
- Building set backs
- Parking requirements
- Building durability and cost
- Type of allowed building use or activity - <CORRECT ANSWER >>-Building durability and cost


2. What is the minimum number of points needed to gain a LEED certified rating?
- 60
- 50
- 40
- 80 - <CORRECT ANSWER >>- 40


3. The total amount of energy consumed throughout all phases of the material life cycle is
____________?
- Embodied Material
- Embodied Energy
- Embodied Carbon
- Embodied Water - <CORRECT ANSWER >>-Embodied Energy


4. A single-purpose entity combines who under one legal contract ?
- The Owner and Contractor
- The Owner, the Architect, the Engineers
- The Architect and the Contractor

,- The Owner, entire Design Team, and entire Construction Team - <CORRECT ANSWER >>- The
Owner, entire Design Team, and entire Construction Team


5. Who created the Master Format ?
- AISC
- Construction Specification Institute
- American Institute of Architects
- International Code Council - <CORRECT ANSWER >>-Construction Specification Institute


6. What occupancy classification would be used for a church sanctuary ?
- Assembly
- Institutional
- Educational
- Industrial - <CORRECT ANSWER >>- Assembly


7.As a contractor, you will not have influence about design decisions.
-True
-False - <CORRECT ANSWER >>-False


8. What is left out in the "cradle-to-gate analysis" ?
-Energy used to extract the natural resources
-Energy used to install and maintain the material
-Energy used to manufacture the material
-Energy used to ship the raw material to the manufacturer - <CORRECT ANSWER >>-Energy
used to install and maintain the material


9. LEED is governed and enforced by a government agency.
-True

,-False - <CORRECT ANSWER >>-False


10. Fire resistance is listed and categorised by the # of __________.
-buildings
-floors
-minutes
-hours - <CORRECT ANSWER >>-hours


12. Considering safety or legality are not issues, who should always get final say of any decision
being made during a construction process ?
-Contractor
-Owner
-Architect
-Engineer - <CORRECT ANSWER >>-Owner


13. Who is responsible for handling all aspects of the building design ?
-Contractor
-Engineer
-Architect
-Manufacturer - <CORRECT ANSWER >>-Architect


14. What division of the Master Format will concrete be found ?
-05
-03
-06
-02 - <CORRECT ANSWER >>-03

, 15. What type of project delivery method is best suited for a project where a turn key price is
guaranteed to an owner in a bid ?
-None
-Design-Bid-Build
-Design-Build
-Integrated Project Delivery - <CORRECT ANSWER >>-Design-Bid-Build


16. Which definition most accurately describes the Living Building Challenge ?
-A building will generate 50% of its own energy from on-site renewable resources, consume
little fresh water, and have little net carbon greenhouse gas emissions.
-Create a building that consumes little resources and is very comfortable to live in.
-Annually, a building will generate all its own energy from on-site renewable resources,
consume no fresh water, and have no net carbon greenhouse gas emissions.
-Create a building out of natural, living materials. - <CORRECT ANSWER >>-Annually, a building
will generate all its own energy from on-site renewable resources, consume no fresh water, and
have no net carbon greenhouse gas emissions.


17. The IBC designates different occupancy classifications. Which one of these is not a
classification ?
-Industrial
-Assembly
-Business
-Educational - <CORRECT ANSWER >>-Industrial


18. What answer below best describes a "Cost Plus" payment schedule.
-The owner agrees to pay a contractor a lump sum fee for all costs and services provided.
-A contractor is paid a set price for all costs and work performed.
-The owner agrees to pay a contractor for all costs of a project and a fee for his services. -
<CORRECT ANSWER >>-The owner agrees to pay a contractor for all costs of a project and a fee
for his services.

Document information

Uploaded on
November 17, 2025
Number of pages
48
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
EliteStudyHub
2.0
(11)
Sold
94
Followers
6
Items
9668
Last sold
3 days ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions