SWM DEQ QUESTIONS AND
CORRECT ANSWERS

The Virginia Stormwater Management Program is authorized by the ______ and ad
ws ws ws ws ws ws ws ws ws ws ws


ministered through the ______ - ans- ws ws ws ws ws


Virginia Stormwater Management Act, Virginia Stormwater Management Program Re
ws ws ws ws ws ws ws ws


gulation

VPDES Permit/ ws


Construction GP authorizes discharge of stormwater from construction activities that
ws ws ws ws ws ws ws ws ws ws


are - ans-greater than or equal to an acre
ws ws ws ws ws ws ws ws




The Stormwater Management Act requires the State Water Control Board to - ans-
ws ws ws ws ws ws ws ws ws ws ws ws


permit, regulate, and control stormwater runoff
ws ws ws ws ws




DEQ has ___ days to complete review of real or potential inter-
ws ws ws ws ws ws ws ws ws ws ws


jurisdictional impacts upon request - ans-90 ws ws ws ws ws




The Stormwater Management Act requires the following individuals to obtain and ma
ws ws ws ws ws ws ws ws ws ws ws


intain a certificate of competency - ans-
ws ws ws ws ws ws


staff of a stormwater program, anyone contracted by a VSMP authority, standard an
ws ws ws ws ws ws ws ws ws ws ws ws


d specification holders
ws ws




The dual certificate will expire three years from - ans-
ws ws ws ws ws ws ws ws ws


the latest date of the certificates
ws ws ws ws ws




SWM plan must be approved by ___ before land disturbance - ans-
ws ws ws ws ws ws ws ws ws ws ws


VSMP program authority
ws ws




The water quality criteria sets a site-
ws ws ws ws ws ws


based load limit of ____ of total phosphorus for new development - ans-0.41 lbs/
ws ws ws ws ws ws ws ws ws ws ws ws ws


acre/year

The phosphorus load limit uses the - ans-10% impervious cover
ws ws ws ws ws ws ws ws ws




Part II B and II C water quantity criteria addresses - ans-
ws ws ws ws ws ws ws ws ws ws ws


channel protection and flood protection
ws ws ws ws




Which two plans in the SWPPP must be approved? - ans-SWM plan, ESC plan
ws ws ws ws ws ws ws ws ws ws ws ws ws

,Does the SWM plan address runoff during or after construction? - ans-post-
ws ws ws ws ws ws ws ws ws ws ws


construction

What is the lower limit of the range of imperviousness that can result in stream degr
ws ws ws ws ws ws ws ws ws ws ws ws ws ws ws


adation? - ans-10% ws ws




What do land disturbing activities consist of? - ans-excavating, clearing, grading
ws ws ws ws ws ws ws ws ws ws




LDA threshold for the SWM Act and Regulation - ans-
ws ws ws ws ws ws ws ws ws


1 acre or 2500 square feet for Chesapeake Bay Preservation Act
ws ws ws ws ws ws ws ws ws ws




In situations where an initial exemption was applicable because LDAs were related t
ws ws ws ws ws ws ws ws ws ws ws ws


o emergency work, VSMP authority shall be advised of the disturbance within - ans-
ws ws ws ws ws ws ws ws ws ws ws ws ws


7 days of commencing the LDA and shall submit a permit application within 30 days
ws ws ws ws ws ws ws ws ws ws ws ws ws ws


of starting the land-disturbing activity
ws ws ws ws ws




Localities with MS4 - ans-must adopt and administer a stormwater program
ws ws ws ws ws ws ws ws ws ws




Localities without MS4 - ans- ws ws ws ws


may choose to administer a VSMP or have DEQ administer the program
ws ws ws ws ws ws ws ws ws ws ws




DEQ is responsible for enforcing the ____ while locality ____ are responsible for enf
ws ws ws ws ws ws ws ws ws ws ws ws ws


orcing local ordinances - ans-Construction GP, VSMP
ws ws ws ws ws ws




A locality VSMP authority must include enforcement authority and a schedule of civil
ws ws ws ws ws ws ws ws ws ws ws ws


penalties for enforcement actions in its local ordinance. The maximum penalty the a
ws ws ws ws ws ws ws ws ws ws ws ws ws


uthority may issue is - ans-$32,500 per violation per day
ws ws ws ws ws ws ws ws ws




Any civil penalty assessed by a court as a result of a summons issued by a locality
ws ws ws ws ws ws ws ws ws ws ws ws ws ws ws ws ws


VSMP authority must be paid - ans-into the locality's treasury
ws ws ws ws ws ws ws ws ws




Any person who violates..... shall be subject to a civil penalty not to exceed - ans-
ws ws ws ws ws ws ws ws ws ws ws ws ws ws ws


$32, 500 ws




Chesapeake Bay Preservation Areas that result in a land disturbance greater than or
ws ws ws ws ws ws ws ws ws ws ws ws


equal to ____ and less than ____ - ans-2,500 ft^2, 1 acre
ws ws ws ws ws ws ws ws ws ws ws ws




CBPA LDAs must have - ans-ws ws ws ws ws


approved E&SC plan, approved SWM plan, local approval to start land disturbance, l
ws ws ws ws ws ws ws ws ws ws ws ws


ong-term maintenance agreement, construction record drawings
ws ws ws ws ws




CBPA LDAs do not require - ans-
ws ws ws ws ws ws


Construction GP, Pollution prevention Plan, Additional control measures to address T
ws ws ws ws ws ws ws ws ws ws


MDL

, State entities and linear projects ___ submit a single set of standards and specificati
ws ws ws ws ws ws ws ws ws ws ws ws ws


ons to DEQ for approval, federal entities ____ - ans-must, may
ws ws ws ws ws ws ws ws ws ws




Name the 5 steps in order of the permitting process - ans-
ws ws ws ws ws ws ws ws ws ws ws


submittal of ESC plans and SWM plans, SWM plan review and approval, registration
ws ws ws ws ws ws ws ws ws ws ws ws


statement entry into Construction GP, Construction GP approved by DEQ, Locality
ws ws ws ws ws ws ws ws ws ws ws ws


VSMP authority approval to start land disturbance
ws ws ws ws ws ws




The locality VSMP authority has ___ days to determine the completeness of a storm
ws ws ws ws ws ws ws ws ws ws ws ws ws


water management plan and to notify the applicant of its determination - ans-15
ws ws ws ws ws ws ws ws ws ws ws ws




If the plan is complete and the applicant has been notified within 15 days of submis
ws ws ws ws ws ws ws ws ws ws ws ws ws ws ws


sion, the locality VSMP authority (plan reviewer) has ___ days from the time of notifi
ws ws ws ws ws ws ws ws ws ws ws ws ws ws


cation to review the plan - ans-60
ws ws ws ws ws ws




Operators of a single- ws ws ws


family detached residential structures that disturb equal to or greater than one acre
ws ws ws ws ws ws ws ws ws ws ws ws ws


of land are - ans-not required to submit a registration statement
ws ws ws ws ws ws ws ws ws ws




VSMP authority must keep project records, including approved SWM plans and regis
ws ws ws ws ws ws ws ws ws ws ws


tration statements, for ___ years after state permit termination or project completion
ws ws ws ws ws ws ws ws ws ws ws ws


- ans-3 years
ws ws




VSMP authority must keep post construction stormwater management facility inspecti
ws ws ws ws ws ws ws ws ws


on records for __ years from the date of inspection - ans-5
ws ws ws ws ws ws ws ws ws ws ws




DEQ is required to conduct a program review once every - ans-5 years
ws ws ws ws ws ws ws ws ws ws ws ws




A locality VSMP must be at least as stringent as what state permit? - ans-
ws ws ws ws ws ws ws ws ws ws ws ws ws ws


Construction GP ws




What plans must a locality's ordinance require to be submitted and approved? - ans-
ws ws ws ws ws ws ws ws ws ws ws ws ws


ESC plan, SWM plan ws ws ws




The Construction GP includes ___ different inspection frequencies - ans-2
ws ws ws ws ws ws ws ws ws




SWPPP inspection schedule if discharging to impaired waters - ans-
ws ws ws ws ws ws ws ws ws


at least once every 4 business days or at least once every 5 business days and no
ws ws ws ws ws ws ws ws ws ws ws ws ws ws ws ws ws


later than 24 hours following a measurable storm event
ws ws ws ws ws ws ws ws




SWPPP inspection schedule for standard inspections - ans-
ws ws ws ws ws ws ws


at least once every 5 business days, at least once every 10 business days and no l
ws ws ws ws ws ws ws ws ws ws ws ws ws ws ws ws


ater than 24 hours following a measurable storm event
ws ws ws ws ws ws ws ws




For all sites where areas have been temporarily stabilized or LDA have been suspe
ws ws ws ws ws ws ws ws ws ws ws ws ws


nded due to frozen conditions, inspections can be done - ans-once a month
ws ws ws ws ws ws ws ws ws ws ws ws

Document information

Uploaded on
November 15, 2025
Number of pages
24
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$16.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
VICTORYSUCCESS
3.0
(2)
Sold
20
Followers
0
Items
2311
Last sold
1 month ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions