1. What is the primary purpose of a project management plan?
A. To provide detailed architectural drawings
B. To define project objectives, processes, and responsibilities
C. To secure funding from stakeholders
D. To outline team member salaries
B
The project management plan provides the overall framework for
project execution, including objectives, processes, and roles.
2. During which project phase is the project schedule usually
created?
A. Conceptual design
B. Construction
C. Planning
D. Closeout
The planning phase involves developing schedules, budgets, and
risk plans before execution.
3. Which of the following is an example of a project constraint?
A. Team enthusiasm
B. Budget
, C. Software used
D. Stakeholder preferences
Constraints limit the options available and typically include time,
cost, and scope.
4. Who is responsible for managing project risk in a construction
project?
A. Architect
B. Owner
C. Construction Manager
D. Subcontractor
The construction manager identifies, assesses, and mitigates risks
throughout the project.
5. What is the primary purpose of a pre-construction meeting?
A. To finalize construction drawings
B. To hire subcontractors
C. To align all project participants on roles, schedule, and
expectations
D. To obtain building permits
Pre-construction meetings ensure everyone understands
responsibilities and project timelines.
6. Which contract type places the greatest financial risk on the
contractor?
A. Cost-plus-fixed-fee
B. Lump-sum (fixed price)
C. Time and materials
D. Unit price
In a lump-sum contract, the contractor bears the risk of cost
overruns.
, 7. What is a key characteristic of a design-bid-build project delivery
method?
A. Design and construction are separate phases with separate
contracts
B. Design and construction are managed by the same entity
C. The owner only provides conceptual input
D. Construction begins before design is complete
Design-bid-build separates design and construction responsibilities
and often involves competitive bidding.
8. In construction management, the critical path represents:
A. The longest sequence of dependent tasks determining project
duration
B. The sequence of tasks with the highest cost
C. The longest sequence of activities that dictates the earliest
project completion
D. Tasks with no float
Critical path identifies the activities that directly impact project
completion time.
9. What is the primary benefit of using a Gantt chart?
A. Cost tracking
B. Visual schedule tracking
C. Risk analysis
D. Contract negotiation
Gantt charts provide a visual representation of project tasks and
timelines.
10. Which of the following is a common method of controlling
changes in a construction project?
A. Verbal approval
B. Ignoring minor modifications
(CCM) EXAM PRACTICE QUESTIONS
AND CORRECT ANSWERS (VERIFIED
ANSWERS) PLUS RATIONALES 2026
Q&A | INSTANT DOWNLOAD PDF
1. What is the primary purpose of a project management plan?
A. To provide detailed architectural drawings
B. To define project objectives, processes, and responsibilities
C. To secure funding from stakeholders
D. To outline team member salaries
B
The project management plan provides the overall framework for
project execution, including objectives, processes, and roles.
2. During which project phase is the project schedule usually
created?
A. Conceptual design
B. Construction
C. Planning
D. Closeout
The planning phase involves developing schedules, budgets, and
risk plans before execution.
3. Which of the following is an example of a project constraint?
A. Team enthusiasm
B. Budget
, C. Software used
D. Stakeholder preferences
Constraints limit the options available and typically include time,
cost, and scope.
4. Who is responsible for managing project risk in a construction
project?
A. Architect
B. Owner
C. Construction Manager
D. Subcontractor
The construction manager identifies, assesses, and mitigates risks
throughout the project.
5. What is the primary purpose of a pre-construction meeting?
A. To finalize construction drawings
B. To hire subcontractors
C. To align all project participants on roles, schedule, and
expectations
D. To obtain building permits
Pre-construction meetings ensure everyone understands
responsibilities and project timelines.
6. Which contract type places the greatest financial risk on the
contractor?
A. Cost-plus-fixed-fee
B. Lump-sum (fixed price)
C. Time and materials
D. Unit price
In a lump-sum contract, the contractor bears the risk of cost
overruns.
, 7. What is a key characteristic of a design-bid-build project delivery
method?
A. Design and construction are separate phases with separate
contracts
B. Design and construction are managed by the same entity
C. The owner only provides conceptual input
D. Construction begins before design is complete
Design-bid-build separates design and construction responsibilities
and often involves competitive bidding.
8. In construction management, the critical path represents:
A. The longest sequence of dependent tasks determining project
duration
B. The sequence of tasks with the highest cost
C. The longest sequence of activities that dictates the earliest
project completion
D. Tasks with no float
Critical path identifies the activities that directly impact project
completion time.
9. What is the primary benefit of using a Gantt chart?
A. Cost tracking
B. Visual schedule tracking
C. Risk analysis
D. Contract negotiation
Gantt charts provide a visual representation of project tasks and
timelines.
10. Which of the following is a common method of controlling
changes in a construction project?
A. Verbal approval
B. Ignoring minor modifications