SEPTIC LICENSE EXAM UPDATED QUESTIONS AND ANSWERS Septic tanks are required to have all seams and drain holes sealed to make water tight. - CORRECT ANSWERtrue

Content preview

SEPTIC LICENSE EXAM UPDATED QUESTIONS AND ANSWERS
Septic tanks are required to have all seams and drain holes sealed to make water tight. - CORRECT
ANSWER✅✅true



all pretreatment units + distribution boxes are required to have KY approval numbers on them -
CORRECT ANSWER✅✅true



equal-flow type distribution boxes may be installed on tamped sand or gravel - CORRECT
ANSWER✅✅true



highest hole in hill side box does not have to be connected to inlet pipe - CORRECT ANSWER✅✅false



all distribution boxes shall be installed level - CORRECT ANSWER✅✅true



certified installer must lay out a septic system prior to evacuation to assure that adequate fall between
components is possible - CORRECT ANSWER✅✅true



equipment used in constructing aseptic system should be:

a. as heavy as possible to maximize soil compaction

b. as light as possible to minimize soil compaction

c. equipment weight does not matter - CORRECT ANSWER✅✅b. as light as possible to minimize soil
compaction



the minimum lateral trench depth is 24 inches - CORRECT ANSWER✅✅false



soil + site conditions limit which type of on site sewage disposal system will work on a site - CORRECT
ANSWER✅✅true



primary purpose of septic tank is to remove solids thru sewage thru settling - CORRECT
ANSWER✅✅true

,soil structure indicates amount of large pore spaces in soil, which are important to absorb sewage
effluent from the lateral lines - CORRECT ANSWER✅✅true



gray water systems contain discharge from these fixtures - CORRECT ANSWER✅✅laundry, hand wash
sink, shower, bathtubs, laundry tubs



what is not considered gray water?

laundry, hand wash sink, shower, bathtubs, laundry tubs, food prep sink, kitchen sink - CORRECT
ANSWER✅✅food prep sink + kitchen sink



slopes greater than 15% may be unstable when on-site sewage disposable systems installed on them
unless special designs modifications made - CORRECT ANSWER✅✅true



what natural process removes most of sewage effluent from lateral trench?

a. evaporation

b. gravity flow

c. bacterial action

d. uptake by trees + grass - CORRECT ANSWER✅✅b. gravity flow



seasonal water tables can be identified in dry months by

a. orange + red colors in soil

b. direct presence of water in soil when sampled

c. gray, green, blue or black colors in soil

d. presence of large flag stones

e. all above - CORRECT ANSWER✅✅c. gray, green, blue or black colors in soil



certified installer must submit proposed system drawing prior to obtaining instillation permit - CORRECT
ANSWER✅✅true

, certified installer must lay out on site sewage system to determine if adequate fall is possible between
components - CORRECT ANSWER✅✅true



you obtain permit to install system with lateral trenches no deeper than 10 inches. if home builder tells
you that they do not want septic tank leaving hump in yard. what do you do?

a. bury tank deep enough in ground so no hump

b. install low profile septic tank

c. install regular septic tank + add fill soil dirt around tank so no hump left when yard is graded

d. either b or c - CORRECT ANSWER✅✅d. both b + c = install low profile septic tank or

install regular septic tank + add fill soil dirt around tank so no hump left when yard is graded



wire test is

a. test to determine if electrical wiring properly installed

b. test to determine whether lateral lines installed level

c. field test to determine if soil moisture will cause damage during lateral line excavation

d. all above - CORRECT ANSWER✅✅c. field test to determine if soil moisture will cause damage during
lateral line excavation



maximum length for individual conventional lateral trench is

a. 100 feet

b. 200 feet

c. no maximum limit

d. 70 feet - CORRECT ANSWER✅✅b. 200 feet



the appropriate minimum spacing of conventional rock trench is

a. 5 feet on centers

b. 8 feet side wall to side wall

c. 8 feet on centers - CORRECT ANSWER✅✅c. 8 feet on centers

Document information

Uploaded on
November 14, 2025
Number of pages
18
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$13.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
STANGRADES
3.3
(15)
Sold
102
Followers
2
Items
11990
Last sold
1 week ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions