11/13/25, 2:28 PM SWM DEQ EXAM fully solved & updated 2025-2026(latest version verified for accuracy) (Questions + Answers) Solved 100% Corr…
SWM DEQ EXAM fully solved & updated 2025-
2026(latest version verified for accuracy)
(Questions + Answers) Solved 100% Correct!!
Save
Practice questions for this set
Learn 1 /7 Study with Learn
Terms in this set (114)
The Virginia Stormwater Virginia Stormwater Management Act, Virginia
Management Program is Stormwater Management Program Regulation
authorized by the ______
and administered through
the ______
https://quizlet.com/1107718696/swm-deq-exam-fully-solved-updated-2025-2026latest-version-verified-for-accuracy-questions-answers-solved-100-co… 1/13
, 11/13/25, 2:28 PM SWM DEQ EXAM fully solved & updated 2025-2026(latest version verified for accuracy) (Questions + Answers) Solved 100% Corr…
VPDES greater than or equal to an acre
Permit/Construction GP
authorizes discharge of
stormwater from
construction activities that
are
The Stormwater permit, regulate, and control stormwater runoff
Management Act requires
the State Water Control
Board to
DEQ has ___ days to 90
complete review of real or
potential inter-
jurisdictional impacts upon
request
The Stormwater staff of a stormwater program, anyone contracted by
Management Act requires a VSMP authority, standard and specification holders
the following individuals
to obtain and maintain a
certificate of competency
The dual certificate will the latest date of the certificates
expire three years from
SWM plan must be VSMP program authority
approved by ___ before
land disturbance
The water quality criteria 0.41 lbs/acre/year
sets a site-based load limit
of ____ of total phosphorus
for new development
The phosphorus load limit 10% impervious cover
uses the
Part II B and II C water channel protection and flood protection
quantity criteria addresses
https://quizlet.com/1107718696/swm-deq-exam-fully-solved-updated-2025-2026latest-version-verified-for-accuracy-questions-answers-solved-100-co… 2/13
SWM DEQ EXAM fully solved & updated 2025-
2026(latest version verified for accuracy)
(Questions + Answers) Solved 100% Correct!!
Save
Practice questions for this set
Learn 1 /7 Study with Learn
Terms in this set (114)
The Virginia Stormwater Virginia Stormwater Management Act, Virginia
Management Program is Stormwater Management Program Regulation
authorized by the ______
and administered through
the ______
https://quizlet.com/1107718696/swm-deq-exam-fully-solved-updated-2025-2026latest-version-verified-for-accuracy-questions-answers-solved-100-co… 1/13
, 11/13/25, 2:28 PM SWM DEQ EXAM fully solved & updated 2025-2026(latest version verified for accuracy) (Questions + Answers) Solved 100% Corr…
VPDES greater than or equal to an acre
Permit/Construction GP
authorizes discharge of
stormwater from
construction activities that
are
The Stormwater permit, regulate, and control stormwater runoff
Management Act requires
the State Water Control
Board to
DEQ has ___ days to 90
complete review of real or
potential inter-
jurisdictional impacts upon
request
The Stormwater staff of a stormwater program, anyone contracted by
Management Act requires a VSMP authority, standard and specification holders
the following individuals
to obtain and maintain a
certificate of competency
The dual certificate will the latest date of the certificates
expire three years from
SWM plan must be VSMP program authority
approved by ___ before
land disturbance
The water quality criteria 0.41 lbs/acre/year
sets a site-based load limit
of ____ of total phosphorus
for new development
The phosphorus load limit 10% impervious cover
uses the
Part II B and II C water channel protection and flood protection
quantity criteria addresses
https://quizlet.com/1107718696/swm-deq-exam-fully-solved-updated-2025-2026latest-version-verified-for-accuracy-questions-answers-solved-100-co… 2/13