Bicsi Technician EXAM WITH COMPLETE 200
QUESTIONS AND SOLUTIONS LATEST UPDATE JUST
RELEASED THIS YEAR
A graphical representation of the electrical components of a construction project (e.g., power
distribution, lighting).
E Drawing
Abbreviation for fire protection drawings
FP Drawing
Abbreviation for mechanical drawings.
M Drawing
Abbreviation for plumbing drawings
P Drawing
Abbreviation for structural drawings
S Drawing
This document covers the requirements for the ICT systems team and lists all of the elements
of the installation.
Scope of Work (SOW)
Abbreviation for telecommunications, security, and audiovisual drawings
T Drawing
, Page 2 of 33
Layer of a telecommunication drawing that contains campus or site information such as
exterior pathways and interbuilding systems
T0 Layer
Project schedules should be updated at least ______________ once the project has started,
Weekly
The size and route of sanitary sewer lines are indicated in the
________ drawings.
P Drawing
Which of the following documents is used to track daily activities at the work site?
Project Log
Which of the following is submitted to request clarification, supplemental information, or
approval of material substitutions?
RFI Form
M drawings indicate the size and route of:
Air Handler Units, Chilled Water Piping, Refrigerant Piping, HVAC System Ducts
Which of the following testers should be used for optical fiber identification?
Visual Fault Locator (VFL)
What is the first step that you should take to verify the existing infrastructure before you
begin a retrofit?
Review the existing documentation with the customer.
, Page 3 of 33
A graphical representation of a building space, or object prepared with adequate detail to
convey design information in a manner to serve as a guide for construction.
A Drawing
Layer of a telecommunication drawing that contains building information.
T1 Layer
Layer of a telecommunication drawing that contains serving zone information
T2 Layer
Layer of a telecommunication drawing that contains information about telecommunications
rooms.
T3 Layer
Layer of a telecommunication drawing that contains the detail drawings.
T4 Layer
Layer of a telecommunication drawing that contains schedules and spreadsheets.
T5 Layer
A list of the quantity and specific types of materials to be used on a project. This list also
should consider miscellaneous hardware.
BOM
Abbreviation for operations and maintenance
O&M
Any number of safety apparatuses worn or used by an individual (e.g., hard hat, protective
eyewear, gloves, clothing) that shield against possible injury while performing tasks.
, Page 4 of 33
PPE
A document that provides detailed statements and descriptions of the work content for the
project requirements.
SOW
What are the three basic locations for storing materials?
Company-controlled location, At the work site, With the distributor
True or False: After completing the site survey and formulating a project implementation plan,
the designated ICT systems installation PM should hold an initial meeting with the entire ICT
systems installation team.
True
Which meeting should be held after the initial meeting and should include the cabling
installation team and appropriate contractors?
Pre-Installation Meeting
The progress meeting should only occur once a month
False
What describes the manpower and mobilization in terms of responsibility, skill level,
certification level and head count?
Project Plan
The building official, electrical inspector, fire marshal, or other individuals or entities
responsible for interpretation and enforcement of local building and electrical codes.
Authority Having Jurisdiction (AHJ)
Bicsi Technician EXAM WITH COMPLETE 200
QUESTIONS AND SOLUTIONS LATEST UPDATE JUST
RELEASED THIS YEAR
A graphical representation of the electrical components of a construction project (e.g., power
distribution, lighting).
E Drawing
Abbreviation for fire protection drawings
FP Drawing
Abbreviation for mechanical drawings.
M Drawing
Abbreviation for plumbing drawings
P Drawing
Abbreviation for structural drawings
S Drawing
This document covers the requirements for the ICT systems team and lists all of the elements
of the installation.
Scope of Work (SOW)
Abbreviation for telecommunications, security, and audiovisual drawings
T Drawing
, Page 2 of 33
Layer of a telecommunication drawing that contains campus or site information such as
exterior pathways and interbuilding systems
T0 Layer
Project schedules should be updated at least ______________ once the project has started,
Weekly
The size and route of sanitary sewer lines are indicated in the
________ drawings.
P Drawing
Which of the following documents is used to track daily activities at the work site?
Project Log
Which of the following is submitted to request clarification, supplemental information, or
approval of material substitutions?
RFI Form
M drawings indicate the size and route of:
Air Handler Units, Chilled Water Piping, Refrigerant Piping, HVAC System Ducts
Which of the following testers should be used for optical fiber identification?
Visual Fault Locator (VFL)
What is the first step that you should take to verify the existing infrastructure before you
begin a retrofit?
Review the existing documentation with the customer.
, Page 3 of 33
A graphical representation of a building space, or object prepared with adequate detail to
convey design information in a manner to serve as a guide for construction.
A Drawing
Layer of a telecommunication drawing that contains building information.
T1 Layer
Layer of a telecommunication drawing that contains serving zone information
T2 Layer
Layer of a telecommunication drawing that contains information about telecommunications
rooms.
T3 Layer
Layer of a telecommunication drawing that contains the detail drawings.
T4 Layer
Layer of a telecommunication drawing that contains schedules and spreadsheets.
T5 Layer
A list of the quantity and specific types of materials to be used on a project. This list also
should consider miscellaneous hardware.
BOM
Abbreviation for operations and maintenance
O&M
Any number of safety apparatuses worn or used by an individual (e.g., hard hat, protective
eyewear, gloves, clothing) that shield against possible injury while performing tasks.
, Page 4 of 33
PPE
A document that provides detailed statements and descriptions of the work content for the
project requirements.
SOW
What are the three basic locations for storing materials?
Company-controlled location, At the work site, With the distributor
True or False: After completing the site survey and formulating a project implementation plan,
the designated ICT systems installation PM should hold an initial meeting with the entire ICT
systems installation team.
True
Which meeting should be held after the initial meeting and should include the cabling
installation team and appropriate contractors?
Pre-Installation Meeting
The progress meeting should only occur once a month
False
What describes the manpower and mobilization in terms of responsibility, skill level,
certification level and head count?
Project Plan
The building official, electrical inspector, fire marshal, or other individuals or entities
responsible for interpretation and enforcement of local building and electrical codes.
Authority Having Jurisdiction (AHJ)