TCM 226 FINAL QUESTIONS & ANSWERS

"All project related functions between parties to a contract" is the definition of - Answer
-Project Administration

Verifying conformance to specifications, attesting to quantity of work-in-place, reviewing
change orders and serving as communication link to owner are all duties of construction
contract administration. (T/F) - Answer -False

A pre-construction conference to establish ground rules for operations and the
successful completion of the project should be held: - Answer -During the bid phase

The ____ is a plan for temporary facilities, material movement, material storage, and
material handling equipment on the job site. - Answer -job site layout plan

Which of the following parties to the construction process is typically responsible for
scheduling and paying for necessary inspections? - Answer -Contractor

The process of awarding subcontracts & procuring materials being furnished by the GC
is called: - Answer -Buyout

The Owner and or the A/E may request to inspect materials delivered off-site (T/F) -
Answer -True

In prolog, what module would I open in order to complete an RFI? - Answer -Doc
Control

After an RFI response is received, the general contractor and its subcontractors should
review the change to see if there is a change in scope of work and possible cost or
schedule impacts. (T/F) - Answer -True

Only the owner, not the A/E, has the authority to accept non-conforming work. (T/F) -
Answer -True

A letter of transmittal is: - Answer -A dated record of when a document was sent to
another party

Which of the following parties to the construction process is responsible for inspecting
each portion of the work to ensure compliance before beginning the next phase of the
work? - Answer -Contractor

In which sector of the construction industry is mobilization referred to as the ongoing
process of moving project material and equipment from one work area to another? -
Answer -Heavy highway

, Thirty days is a standard time period for meeting minutes to be open for
review/amendment. (T/F) - Answer -False

Most RFI's are: - Answer -Brief questions requesting clarification

While conversations are usually the "quickest" way to get things accomplished, letters
are the most "powerful" way to accomplish things. (T/F) - Answer -True

The 4-hour house was built in San Francisco, California (T/F) - Answer -False

AHJ stands for: - Answer -Authority having Jurisdiction

Which one of the following parties is responsible for: a) observing the work and being
generally familiar with its progress; b) certifying/recommending the validity or contract
compliance of an item or work; c) interpreting contract documents; d) resolving
disputes? - Answer -A/E

Project administration software should NOT include the following features - Answer -
Anonymous commenting

When handling job site material, a good rule of thumb is always to move material with
the least expensive labor possible. (T/F) - Answer -True

NTP stands for no time penalty. (T/F) - Answer -False

Temporary facilities that need to be considered when planning a job site layout include
all but which of the following? - Answer -d. all of the above

All submittals must be approved by the project architect/engineer (T/F) - Answer -False

Which of the following is an appropriate use of a RFI by a general contractor? - Answer
-to provide a mechanism to field and resolve legitimate contractor questions

A common method to transport large equipment from one location to another is to use a
lowboy (T/F) - Answer -True

When writing a scope of work for a subcontractor, the term "furnish" refers to the
requirement that a person will provide and install a particular item of work (T/F) -
Answer -False

Stamped permit documents need to be available on the project site for review by
inspectors (T/F) - Answer -True

Which of the following is NOT an activity performed during the preconstruction phase of
the project? - Answer -Punch list generation

Document information

Uploaded on
November 12, 2025
Number of pages
5
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GEEKA
3.8
(365)
Sold
2154
Followers
1449
Items
60016
Last sold
1 day ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions