• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 9 pages
Other

Byu Cm 415 Project Management Study Guide

Document preview thumbnail
Preview 2 out of 9 pages

BYU CM 415 PROJECT MANAGEMENT STUDY GUIDE

Content preview

BYU CM 415 PROJECT MANAGEMENT STUDY GUIDE

Definition of Project Management - Answer -A system that provides for the Planning,
Organizing, Directing Controlling (PODC) of a unique one time activity. So as to
complete on time, on budget, safely, to a specific quality with no claims.

Define Project - Answer -A unique one time activity with tasks and a fixed duration

DBB - Answer -Design-Bid-Build

DB - Answer -Design - Build

GMP - Answer -Cost+Guaranteed Max Price

CM @ Risk - Answer -CM is involved early like in DB, but they are not one entity

IPD - Answer -Integrated Project Delivery

PPP - Answer -Public Private Partnership

CM Agency - Answer -CM (owner's rep) is the buffer between the Arch and General
Cont.

LMESO - Answer -Labor, Materials, Equipment, Subs, Other

Project Manager Acts as the... - Answer -Coach

Why is Scope important? - Answer -Because it is basically relevance.

Why is Schedule important? - Answer -It pushes workers to complete work on time, but
rarely works

Why is Resources important? - Answer -If the owner isn't worried about cost, then
scope and schedule can be made less important.

Why is Quality important? - Answer -The quality of work is as important as the owner
wishes.

What is the Most important meeting? - Answer -Pre-Construction. Because you set the
expectations.

Meeting Minutes? - Answer -Assignments and Decisions
Attendance
Date, Time, Place
Old items, new business

, RFI's
Schedule, progress

What % of Projects meet the Project Management Definition? - Answer -20%

Project Team Members and responsibilites - Answer -Owner - Pays the $
Architect - designs the projects (referee)
Contractor - Provides the LMESO
Inspectors - 4 way, concrete, rebar, etc
Project Manager - (Coach) - PODC / Manage Risk
Superintendent - face of project onsite / responsible for physical building production
Project Engineer - RFIs, COs, Document Project, Know everything about project.
Field Engineer - Out of field doing quality check

Goals of Staffing - Answer -• Right number of people
• Assign each player to position he fits best
• Select each person on the basis of his/her combined skills, abilities, and attitude
• Design the team so that each person's weakness is balanced by another's strengths
• Create a real team where - people think and work well together. Avoid a group where
one superstar dominates and everyone else is secondary

Construction Documents - Answer -Document Log - Track changes / Back up company
against allegations
Subcontracts - written agreement between cont. and sub
Contract docs -
Project docs-
In house docs -
Daily Logs -
As Built Drawings -
Labor Agreement -
Letter of Intent -
Purchase Orders -
RFI -
Submittals -
Change Orders -
Detail Report -
Job Cost Projection Report -

As-Built Drawings - Answer -Convey the correct information as the project is being
constructed.

The Superintendant is in charge
**MEP as-builts
**Underground (Utility) As-builts

What is an Addenda? - Answer -A change to the contract BEFORE the bid.

Document information

Uploaded on
November 12, 2025
Number of pages
9
Written in
2025/2026
Type
Other
Person
Unknown
$14.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GEEKA
3.8
(376)
Sold
2223
Followers
1451
Items
62835
Last sold
1 hour ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions