Cost Plus Contract - Answer -Contractor is paid for all of the allowed expenses to a set
limit, plus any additional payment to allow for a profit. (BEST type of contract in the
contractor's point of view). All Risk is on the owner

Guaranteed Max Price Contract - Answer -Contractor is compensated for the actual
costs incurred on the project, plus a fixed fee that is subject to a ceiling price. Owner
and contractor share risk, it is important to include a change order risk in the contract

Design - Bid - Build - Answer -Most traditional contract, The Owner contracts with
separate entities for the design (architect) and the construction (contractor) for a project.
Remember the triangle of hate. (ALL risk is on the contractor)

Design - Build - Answer -This method is usually cheaper for the owner, design of
building and construction are produced by the same company. Owner's don't go for this
method because they can't see the bottom dollar, they
like to know at the beginning how much they will be spending.

CM at Risk (CMAR) - Answer -This type of contract almost always improves the quality
of a project. CM is required to deliver project within a guaranteed max price which is
based on the construction documents and the specs.

CM works with the owners best interest in mind -- acting as the main point of
communication.

NOTE: Low bidders are often dismissed (looking for good quality only).

Integrated Project Design (IPD) - Answer -Utopian Style Contract. Everyone shares the
risk. No litigation, everyone is on the same team -- same job site trailer.

Public/Private Partnership - Answer -Public will contract with a construction company to
build something. The contractor will pay for it initially, and the public owner will pay it off
over time, like a mortgage.

What should meeting minutes include? - Answer -Attendees, Date/Time, Submittals,
RFI statuses, a good summary of what happened in a meeting (in a narrative, "story"
format)

What is the most important meeting? - Answer -Pre-Construction

What happens in a Descoping meeting? - Answer -Find inclusins/exclusions, make
sure that the bid matches the specs, look for "orphans", and it is acceptable to negotiate
over the bid, HOWEVER it is unethical to Bid Shop.

, CSI Specification - Answer -Construction Specifications Institute

What CSI Divisions should we memorize in this class? - Answer -Divisions 1-10, 21,
22, 23, 26, & 31

CSI Division 1 - Answer -General Requirements

CSI Division 2 - Answer -Existing Condistions

CSI Division 3 - Answer -Concrete

CSI Division 4 - Answer -Masonry

CSI Division 5 - Answer -Metals

CSI Division 6 - Answer -Wood, Plastic, Compositions

CSI Division 7 - Answer -Thermal & Moisture Protection

CSI Division 8 - Answer -Openings

CSI Division 9 - Answer -Finishes

CSI Division 10 - Answer -Specialties

CSI Division 21 - Answer -Fire Suppression

CSI Division 22 - Answer -Plumbing

CSI Division 23 - Answer -HVAC

CSI Division 26 - Answer -Electrical

CSI Division 31 - Answer -Earthwork

Number of Old/Current CSI Divisions - Answer -16/50

CSI Tech Specs are Divisions... - Answer -2-50

Definition of Project - Answer -"A unique one-time activity with tasks & a fixed duration"

NOTE: projects are temporary.
EXAMPLE: even track houses have a unique location with a fixed time therefore making
them a project.

Written for

Institution
CFM 415
Course
CFM 415

Document information

Uploaded on
November 12, 2025
Number of pages
Unknown
Written in
2025/2026
Type
OTHER
Person
Unknown
$13.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GEEKA YALA UNIVERSITY
View profile
Follow You need to be logged in order to follow users or courses
Sold
2066
Member since
4 year
Number of followers
1446
Documents
51825
Last sold
1 day ago

3.8

355 reviews

5
177
4
61
3
47
2
17
1
53

Trending documents

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions