Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

CON 367 Exam 1 with all Correct & 100% Verified Answers |Latest Version| Already Graded A+ (Just Released)

Rating
-
Sold
-
Pages
5
Grade
A+
Uploaded on
10-11-2025
Written in
2025/2026

CON 367 Exam 1 with all Correct & 100% Verified Answers |Latest Version| Already Graded A+ (Just Released)

Institution
Contracts
Course
Contracts

Content preview

CON 367 Exam 1 with all Correct & 100% Verified
Answers |Latest Version| Already Graded A+ (Just
Released)

Professional CM (Agency CM) ✔Correct Answer-Which one of the following is not a Project
Delivery System?

In lump-sum contracts, the Owner assumes the risk of cost. ✔Correct Answer-False

Typically, the Design Reviewer has the ultimate responsibility and authority to make executive
decisions related to matters affecting time and money in a construction project. ✔Correct Answer-
False

In the Design-Build project delivery system, the Owner has separate contracts with the Designer and
the Contractor. ✔Correct Answer-False

The Resident Project Representative should stop the work of the Contractor when the work is not
performed according to the drawings and specifications. ✔Correct Answer-False

Which of the following should not be performed by the Resident Project Representative for
inspections? ✔Correct Answer-Providing instructions directly to subcontractors

Which of the following is not true for the construction diary? ✔Correct Answer-Entries should be
made on a weekly basis (i.e., at the end of each week)

Ambiguous language in a contract is interpreted against the party who selected the language or
supplied the contract. ✔Correct Answer-True

According to Spearin Doctrine, when the contractor exactly follows the detail specifications and
drawings, she/he will not be responsible for unsatisfactory results in the end product. ✔Correct
Answer-True

Shop drawings can be used as change orders. ✔Correct Answer-False

Which one of the following is not an element of the Contract as we discussed in class? ✔Correct
Answer-(Promise)
Offer
Acceptance
Consideration

Which of the following is not a condition where a contract will not be enforced by courts?
✔Correct Answer-Seniority

Fill in the blank in the following statement: Some contracts must be in writing under the
____________ as adopted by each state. ✔Correct Answer-Statute of Frauds

, RFI (Request for Information) is the document that is transmitted to the General Contractor from the
Designer to get clarifications with respect to design drawings and specifications. ✔Correct Answer-
False

The resident project representative should not supervise, direct, or control the contractor's means
and methods of performing work. ✔Correct Answer-True

In fast-track projects with multiple contractors, the services of a professional construction
management firm (Agency CM) are essential. ✔Correct Answer-True

A professional construction management firm (Agency CM) can participate in the following phases of
a project: ✔Correct Answer-Conception, Program Planning, Design, Construction, and Closeout

The design-build process may face some legal barriers when tried to be implemented in the public
sector. ✔Correct Answer-True

On a multiple-prime project, the owner is responsible for coordinating the various trade contractors
with whom it has contracted. ✔Correct Answer-True

According to the brief article (in the supplemental reading for Week 3) about the use of Web-based
project management system used in Illinois Tollway, such system resulted in reduced turnaround
time on communications and improved access to project paperwork. ✔Correct Answer-True

The Resident Project Representative does not need to make any measurement for the progress
payments in the lump-sum projects. ✔Correct Answer-False

Use of Building Information Modeling (BIM) in construction projects may result in a reduction in
Requests for Information (RFIs) and change orders. ✔Correct Answer-True

The specifications should contain absolute dimensions and avoid tolerances in those dimensions.
✔Correct Answer-False

Fair subcontracting laws are in effect to protect subcontractors and the public against bid shopping
and bid peddling practices. ✔Correct Answer-True

The Americans with Disabilities Act (ADA) of 1990 is enforced by: ✔Correct Answer-Equal
Employment Opportunity Commission (EEOC)

Put in chronological order (from 1 to 5) the following 5 steps of the process of initiating a
construction project. ✔Correct Answer-1. Advertise for bids
2. Open bids
3. Award contract
4. Sign the contract
5. Issue Notice to Proceed

In the Contractor Quality Control (CQC) inspection process implemented by some federal agencies,
the Contractor must organize and maintain an inspection system. ✔Correct Answer-TRUE

The Resident Project Representative should not direct the Contractor's work. ✔Correct Answer-
True

Written for

Institution
Contracts
Course
Contracts

Document information

Uploaded on
November 10, 2025
Number of pages
5
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$12.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Studyclub Yale School Of Medicine
View profile
Follow You need to be logged in order to follow users or courses
Sold
57
Member since
1 year
Number of followers
1
Documents
11799
Last sold
10 hours ago
"The Club for Top Academic Performance."

Welcome to StudyClub—the ultimate destination for students who want to make studying not only effective but also enjoyable! Whether you’re preparing for an exam, looking to improve your grades, or mastering new subjects, StudyClub is your go-to space to find the tools and resources you need to succeed. At StudyClub, I believe in the power of community. That’s why I’ve created a collection of high-quality study materials designed to simplify complex concepts and help you achieve your academic goals. Whether you’re an individual looking to study independently or a student seeking the support of a virtual study group, you’ll find everything you need to succeed. Join the StudyClub today, where learning is made easier, more organized, and—most importantly—more collaborative. Let’s grow together, learn smarter, and unlock your academic potential. Thank you for being part of the StudyClub community. I can’t wait to see you succeed!

Read more Read less
3.6

14 reviews

5
6
4
1
3
4
2
1
1
2

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions