• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 11 pages
Exam (elaborations)

SWM DEQ Questions and Answers (100% Correct Answers) Already Graded A+

Document preview thumbnail
Preview 2 out of 11 pages

SWM DEQ Questions and Answers (100% Correct Answers) Already Graded A+

Content preview

1
For Expert help and assignment solutions, +254707240657


SWM DEQ Questions and Answers (100%
Correct Answers) Already Graded A+
The Virginia Stormwater Management Program is authorized by
the ______ and administered through the ______ [ ANS: ] Virginia
Stormwater Management Act, Virginia Stormwater Management
Program Regulation

VPDES Permit/Construction GP authorizes discharge of stormwater
from construction activities that are [ ANS: ] greater than or equal
to an acre
© 2025 Assignment Expert




The Stormwater Management Act requires the State Water
Control Board to [ ANS: ] permit, regulate, and control stormwater
runoff
Guru01 - Stuvia




DEQ has ___ days to complete review of real or potential inter-
jurisdictional impacts upon request [ ANS: ] 90

The Stormwater Management Act requires the following
individuals to obtain and maintain a certificate of competency [
ANS: ] staff of a stormwater program, anyone contracted by a
VSMP authority, standard and specification holders

The dual certificate will expire three years from [ ANS: ] the latest
date of the certificates

SWM plan must be approved by ___ before land disturbance [
ANS: ] VSMP program authority

The water quality criteria sets a site-based load limit of ____ of total
phosphorus for new development [ ANS: ] 0.41 lbs/acre/year

The phosphorus load limit uses the [ ANS: ] 10% impervious cover

Part II B and II C water quantity criteria addresses [ ANS: ] channel
protection and flood protection

, 2
For Expert help and assignment solutions, +254707240657

Which two plans in the SWPPP must be approved? [ ANS: ] SWM
plan, ESC plan

Does the SWM plan address runoff during or after construction? [
ANS: ] post-construction

What is the lower limit of the range of imperviousness that can
result in stream degradation? [ ANS: ] 10%

What do land disturbing activities consist of? [ ANS: ] excavating,
clearing, grading

LDA threshold for the SWM Act and Regulation [ ANS: ] 1 acre or
© 2025 Assignment Expert




2500 square feet for Chesapeake Bay Preservation Act

In situations where an initial exemption was applicable because
LDAs were related to emergency work, VSMP authority shall be
Guru01 - Stuvia




advised of the disturbance within [ ANS: ] 7 days of commencing
the LDA and shall submit a permit application within 30 days of
starting the land-disturbing activity

Localities with MS4 [ ANS: ] must adopt and administer a
stormwater program

Localities without MS4 [ ANS: ] may choose to administer a VSMP
or have DEQ administer the program

DEQ is responsible for enforcing the ____ while locality ____ are
responsible for enforcing local ordinances [ ANS: ] Construction
GP, VSMP

A locality VSMP authority must include enforcement authority and
a schedule of civil penalties for enforcement actions in its local
ordinance. The maximum penalty the authority may issue is [ ANS:
] $32,500 per violation per day

Any civil penalty assessed by a court as a result of a summons
issued by a locality VSMP authority must be paid [ ANS: ] into the
locality's treasury

Document information

Uploaded on
November 7, 2025
Number of pages
11
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ScholarsAscend
3.7
(80)
Sold
491
Followers
39
Items
30002
Last sold
12 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions