SWM DEQ Questions and Answers (100%
Correct Answers) Already Graded A+
The Virginia Stormwater Management Program is authorized by
the ______ and administered through the ______ [ ANS: ] Virginia
Stormwater Management Act, Virginia Stormwater Management
Program Regulation
VPDES Permit/Construction GP authorizes discharge of stormwater
from construction activities that are [ ANS: ] greater than or equal
to an acre
© 2025 Assignment Expert
The Stormwater Management Act requires the State Water
Control Board to [ ANS: ] permit, regulate, and control stormwater
runoff
Guru01 - Stuvia
DEQ has ___ days to complete review of real or potential inter-
jurisdictional impacts upon request [ ANS: ] 90
The Stormwater Management Act requires the following
individuals to obtain and maintain a certificate of competency [
ANS: ] staff of a stormwater program, anyone contracted by a
VSMP authority, standard and specification holders
The dual certificate will expire three years from [ ANS: ] the latest
date of the certificates
SWM plan must be approved by ___ before land disturbance [
ANS: ] VSMP program authority
The water quality criteria sets a site-based load limit of ____ of total
phosphorus for new development [ ANS: ] 0.41 lbs/acre/year
The phosphorus load limit uses the [ ANS: ] 10% impervious cover
Part II B and II C water quantity criteria addresses [ ANS: ] channel
protection and flood protection
, 2
For Expert help and assignment solutions, +254707240657
Which two plans in the SWPPP must be approved? [ ANS: ] SWM
plan, ESC plan
Does the SWM plan address runoff during or after construction? [
ANS: ] post-construction
What is the lower limit of the range of imperviousness that can
result in stream degradation? [ ANS: ] 10%
What do land disturbing activities consist of? [ ANS: ] excavating,
clearing, grading
LDA threshold for the SWM Act and Regulation [ ANS: ] 1 acre or
© 2025 Assignment Expert
2500 square feet for Chesapeake Bay Preservation Act
In situations where an initial exemption was applicable because
LDAs were related to emergency work, VSMP authority shall be
Guru01 - Stuvia
advised of the disturbance within [ ANS: ] 7 days of commencing
the LDA and shall submit a permit application within 30 days of
starting the land-disturbing activity
Localities with MS4 [ ANS: ] must adopt and administer a
stormwater program
Localities without MS4 [ ANS: ] may choose to administer a VSMP
or have DEQ administer the program
DEQ is responsible for enforcing the ____ while locality ____ are
responsible for enforcing local ordinances [ ANS: ] Construction
GP, VSMP
A locality VSMP authority must include enforcement authority and
a schedule of civil penalties for enforcement actions in its local
ordinance. The maximum penalty the authority may issue is [ ANS:
] $32,500 per violation per day
Any civil penalty assessed by a court as a result of a summons
issued by a locality VSMP authority must be paid [ ANS: ] into the
locality's treasury
For Expert help and assignment solutions, +254707240657
SWM DEQ Questions and Answers (100%
Correct Answers) Already Graded A+
The Virginia Stormwater Management Program is authorized by
the ______ and administered through the ______ [ ANS: ] Virginia
Stormwater Management Act, Virginia Stormwater Management
Program Regulation
VPDES Permit/Construction GP authorizes discharge of stormwater
from construction activities that are [ ANS: ] greater than or equal
to an acre
© 2025 Assignment Expert
The Stormwater Management Act requires the State Water
Control Board to [ ANS: ] permit, regulate, and control stormwater
runoff
Guru01 - Stuvia
DEQ has ___ days to complete review of real or potential inter-
jurisdictional impacts upon request [ ANS: ] 90
The Stormwater Management Act requires the following
individuals to obtain and maintain a certificate of competency [
ANS: ] staff of a stormwater program, anyone contracted by a
VSMP authority, standard and specification holders
The dual certificate will expire three years from [ ANS: ] the latest
date of the certificates
SWM plan must be approved by ___ before land disturbance [
ANS: ] VSMP program authority
The water quality criteria sets a site-based load limit of ____ of total
phosphorus for new development [ ANS: ] 0.41 lbs/acre/year
The phosphorus load limit uses the [ ANS: ] 10% impervious cover
Part II B and II C water quantity criteria addresses [ ANS: ] channel
protection and flood protection
, 2
For Expert help and assignment solutions, +254707240657
Which two plans in the SWPPP must be approved? [ ANS: ] SWM
plan, ESC plan
Does the SWM plan address runoff during or after construction? [
ANS: ] post-construction
What is the lower limit of the range of imperviousness that can
result in stream degradation? [ ANS: ] 10%
What do land disturbing activities consist of? [ ANS: ] excavating,
clearing, grading
LDA threshold for the SWM Act and Regulation [ ANS: ] 1 acre or
© 2025 Assignment Expert
2500 square feet for Chesapeake Bay Preservation Act
In situations where an initial exemption was applicable because
LDAs were related to emergency work, VSMP authority shall be
Guru01 - Stuvia
advised of the disturbance within [ ANS: ] 7 days of commencing
the LDA and shall submit a permit application within 30 days of
starting the land-disturbing activity
Localities with MS4 [ ANS: ] must adopt and administer a
stormwater program
Localities without MS4 [ ANS: ] may choose to administer a VSMP
or have DEQ administer the program
DEQ is responsible for enforcing the ____ while locality ____ are
responsible for enforcing local ordinances [ ANS: ] Construction
GP, VSMP
A locality VSMP authority must include enforcement authority and
a schedule of civil penalties for enforcement actions in its local
ordinance. The maximum penalty the authority may issue is [ ANS:
] $32,500 per violation per day
Any civil penalty assessed by a court as a result of a summons
issued by a locality VSMP authority must be paid [ ANS: ] into the
locality's treasury