100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

PCM PRACTICE QUESTIONS ACTUAL EXAM QUESTIONS WITH VERIFIED SOLUTIONS GUARANTEED PASS ALREADY GRADED A+

Rating
-
Sold
-
Pages
16
Grade
A+
Uploaded on
07-11-2025
Written in
2025/2026

"What additional construction contract administration responsibilities does the owner assume in the design-build process? - CORRECT ANSWER=> -Reviewing and approving submittals -Approving changes -Visiting the site -Rejecting nonconforming work (3-10)" "What kind of architecture firm would a corporation seeking a signature building turn to? What kind of budget would this require? - CORRECT ANSWER=> They would turn to a design orientated firm with a generous budget." "What kind of project delivery system might be preferred by a real estate developer? - CORRECT ANSWER=> This kind of client might use a design-build project delivery system." "What are the three points that define an independent contractor according to the IRS? - CORRECT ANSWER=> -Behavioral control -Financial control -The relationship between employer and worker" "What tools are required for a successful integrated project delivery system? - CORRECT ANSWER=> -Technology -Communication -BIM for all members" "Why would a client hire a construction manager as an adviser (CMa)? - CORRECT ANSWER=> -Determine the construct ability of the design -Provide early cost estimating -Provide value analysis -Determine scheduling -Assist with contract negotiations -Manage multiple construction contracts -Make early material purchases -In some cases, provide guaranteed price and completion date"

Show more Read less
Institution
PCM
Course
PCM










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
PCM
Course
PCM

Document information

Uploaded on
November 7, 2025
Number of pages
16
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

PCM PRACTICE QUESTIONS
ACTUAL EXAM QUESTIONS WITH
VERIFIED SOLUTIONS
GUARANTEED PASS ALREADY
GRADED A+
"What additional construction contract administration responsibilities does the owner assume
in the design-build process? - CORRECT ANSWER=> -Reviewing and approving submittals
-Approving changes
-Visiting the site
-Rejecting nonconforming work (3-10)"

"What kind of architecture firm would a corporation seeking a signature building turn to? What
kind of budget would this require? - CORRECT ANSWER=> They would turn to a design orientated
firm with a generous budget."

"What kind of project delivery system might be preferred by a real estate developer? - CORRECT
ANSWER=> This kind of client might use a design-build project delivery system."


"What are the three points that define an independent contractor according to the IRS? -
CORRECT ANSWER=> -Behavioral control
-Financial control
-The relationship between employer and worker"

"What tools are required for a successful integrated project delivery system? - CORRECT
ANSWER=> -Technology
-Communication
-BIM for all members"




1|Page

,"Why would a client hire a construction manager as an adviser (CMa)? - CORRECT ANSWER=> -
Determine the construct ability of the design
-Provide early cost estimating
-Provide value analysis
-Determine scheduling
-Assist with contract negotiations
-Manage multiple construction contracts
-Make early material purchases
-In some cases, provide guaranteed price and completion date"

"What are the advantages of fast-tracking? - CORRECT ANSWER=> -Reduced time
-Lower budget"

"What factor most often determines the design method used to produce a project? - CORRECT
ANSWER=> Cost is the most frequent factor"


"What are the owner's obligations if the owner chooses to contract directly with the
consultants? - CORRECT ANSWER=> If the owner chooses to do this, the owner must be directly
involved with the work of the consultant."

"What are the elements that define "Standard of Care" - CORRECT ANSWER=> -Same community
-Same time frame
-Same or similar facts and circumstances"

"What is the principal advantage to using a corporation as the business model for an architect's
office? - CORRECT ANSWER=> This type of business structure does not put the personal assets of
the stockholders at risk."

"What are two common reasons for two architecture firms to create a joint venture? - CORRECT
ANSWER=> -A project is too large or complex to be completed by one firm
-One firm lacks the expertise the second firm has in a particular building type"

"What is the term for the concept of combining the design-build process and the design-build
process? - CORRECT ANSWER=> Bridging combines these two process"

"Why would an architecture firm choose to be party to a multi-party agreement? - CORRECT
ANSWER=> This kind of agreement is used in integrated delivery system projects."



2|Page

, "During an employee job review, what are the two topics that should not dominate the
conversation? - CORRECT ANSWER=> -Single high point
-Rare poor performance"

"What type of assurance is represented in a cost estimate prepared by the architect? - CORRECT
ANSWER=> This document represents the architect's best professional judgment, but it is not
considered to be a guarantee to the owner of actual construction costs."

"During the pre-design phase, the architect should be involved with what team-building
activity? - CORRECT ANSWER=> The architect needs to assemble and coordinate a team of
professional consultant during this phase of the project."

"What financial stake does an architect have in a typical design-bid-build project? - CORRECT
ANSWER=> As the agent for the owner, an architect has no financial stake in this type of project"


"What is the smallest possible size of a sole proprietorship? - CORRECT ANSWER=> One architect
should complete this kind of firm."

"What options are available to an architect if the owner's budget is lower than the architect's
estimated cost but the project would be a good addition to the firm's portfolio? - CORRECT
ANSWER=> - Reducing the profit margin
- limiting the scope of the work or the project might be responses to this situation."

"Outsourcing is commonly used to complete what portions of the architect's workload? -
CORRECT ANSWER=> -Production of documents
-Model building
-Rendering
-Energy analysis"

"What should an architect do if asked to replace another architect on a project? - CORRECT
ANSWER=> Before an architect can begin this process, the first thing that the architect needs to
determine is whether a contractual relationship exists between the owner and the first
architect."

"How would an architecture firm planning to practice in a broad range of building types need to
be staffed? - CORRECT ANSWER=> This kind of architecture firm would require a staff with a wide
experience base and would need to be prepared to bring in consultants when an unusual
building type is proposed."

3|Page

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ExcelHub Chamberlain College Of Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
29
Member since
1 year
Number of followers
0
Documents
1048
Last sold
1 week ago
Excel-Hub YOUR TRUSTED HUB FOR EXCEPTIONAL STUDY RESOURCES!

Welcome to Excel-Hub your go-to source for high-quality test banks and study materials designed to help you excel academically. I offer a comprehensive range of resources including test banks, solution manuals, and other study materials, all meticulously curated to ensure accuracy and effectiveness. They are affordable, well discounted especially the package deals and instantly available, making your learning experience seamless and efficient. Trust Excel-Hub to be your partner in academic success, providing the tools you need to achieve your educational goals. I understand the importance of high-quality, dependable materials in your academic journey. That’s why every document in my store is thoughtfully created to meet your specific needs, ensuring you have the tools to succeed with confidence. Be sure to Excel! I’d love to hear about your experience! Please leave a review of your experience with the study documents.

Read more Read less
4.0

3 reviews

5
1
4
1
3
1
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions