OSIC Study guide 1 questions with
complete solutions
what document establishes AIT requirements and procedures for the accomplishment of
modernization - correct answer ✔✔ TS9090-310
what is required for an AIT to be authorized to install Alts/SCs? - correct answer ✔✔ -RMMCO
check-in
-NSA check-in
-Must have accepted QMS
who is the single Naval Activity responsible for the integration, oversight, and verification of all
work accomplished by all activities? - correct answer ✔✔ NSA
which areas are to be monitored by the osic? - correct answer ✔✔ -production schedule
-quality of work
-compliance with requirements
T/F: AIT OSIC must be a government or military employee - correct answer ✔✔ True
what QA documents are developed by the AIT for each alt and are required to be on-site during
install? - correct answer ✔✔ QAWB
Scenario: a design flaw was ID'd after approval of SIDs which necessitates a drawing change.
what doc shall be submitted to obtain approval of this SID change? - correct answer ✔✔ Liaison
Action Record
, QAWB Section 1 - correct answer ✔✔ Alteration/SC description
QAWB Section 2 - correct answer ✔✔ Personnel Records
QAWB Section 3 - correct answer ✔✔ OQE- SIs, processes, approval letters, etc.
QAWB Section 4 - correct answer ✔✔ Installation POA&M
QAWB Section 5 - correct answer ✔✔ SC/ SIDs or Install Procedures
QAWB Section 6 - correct answer ✔✔ Test and Inspection plan
QAWB Section 7 - correct answer ✔✔ Test and inspection record
when should the OSIC meet with RMMCO - correct answer ✔✔ Both before and after install
what document is used by the OSIC to schedule and accomplish process surveillance inspections
on their AIT IAW the AMQAP? - correct answer ✔✔ AIT's QMS
what are the responsibilities of the AITM? - correct answer ✔✔ -manage AIT funding
-Review QAWB
-Monitor AIT execution
AIT OSIC shall be available where in what time-frame? - correct answer ✔✔ Onboard the ship
within 2 hours' notice
complete solutions
what document establishes AIT requirements and procedures for the accomplishment of
modernization - correct answer ✔✔ TS9090-310
what is required for an AIT to be authorized to install Alts/SCs? - correct answer ✔✔ -RMMCO
check-in
-NSA check-in
-Must have accepted QMS
who is the single Naval Activity responsible for the integration, oversight, and verification of all
work accomplished by all activities? - correct answer ✔✔ NSA
which areas are to be monitored by the osic? - correct answer ✔✔ -production schedule
-quality of work
-compliance with requirements
T/F: AIT OSIC must be a government or military employee - correct answer ✔✔ True
what QA documents are developed by the AIT for each alt and are required to be on-site during
install? - correct answer ✔✔ QAWB
Scenario: a design flaw was ID'd after approval of SIDs which necessitates a drawing change.
what doc shall be submitted to obtain approval of this SID change? - correct answer ✔✔ Liaison
Action Record
, QAWB Section 1 - correct answer ✔✔ Alteration/SC description
QAWB Section 2 - correct answer ✔✔ Personnel Records
QAWB Section 3 - correct answer ✔✔ OQE- SIs, processes, approval letters, etc.
QAWB Section 4 - correct answer ✔✔ Installation POA&M
QAWB Section 5 - correct answer ✔✔ SC/ SIDs or Install Procedures
QAWB Section 6 - correct answer ✔✔ Test and Inspection plan
QAWB Section 7 - correct answer ✔✔ Test and inspection record
when should the OSIC meet with RMMCO - correct answer ✔✔ Both before and after install
what document is used by the OSIC to schedule and accomplish process surveillance inspections
on their AIT IAW the AMQAP? - correct answer ✔✔ AIT's QMS
what are the responsibilities of the AITM? - correct answer ✔✔ -manage AIT funding
-Review QAWB
-Monitor AIT execution
AIT OSIC shall be available where in what time-frame? - correct answer ✔✔ Onboard the ship
within 2 hours' notice