100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

P-99 Low Pressure Boiler COF FDNY Questions and Answers (100% Correct Answers) Already Graded A+

Rating
-
Sold
-
Pages
11
Grade
A+
Uploaded on
06-11-2025
Written in
2025/2026

P-99 Low Pressure Boiler COF FDNY Questions and Answers (100% Correct Answers) Already Graded A+

Institution
P-99 Low Pressure Boiler COF FDNY
Course
P-99 Low Pressure Boiler COF FDNY









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
P-99 Low Pressure Boiler COF FDNY
Course
P-99 Low Pressure Boiler COF FDNY

Document information

Uploaded on
November 6, 2025
Number of pages
11
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

1
For Expert help and assignment solutions, +254707240657


P-99 Low Pressure Boiler COF FDNY
Questions and Answers (100% Correct
Answers) Already Graded A+
A fill line in an oil burner system is a line used to: [ ANS: ] Fill the
storage tank with oil.

The aquastat is located [ ANS: ] Below the water line.

All heating, combustion, and cooking equipment shall be installed
with adequate clearances from _______ construction. [ ANS: ]
© 2025 Assignment Expert




Combustible

The equipment must be provided with ______ or the building
construction shall be _____ _____. [ ANS: ] Insulation.
Guru01 - Stuvia




Fire Protected

During operation the surface of combustible construction
materials will not be raised to a temp higher than _____ degrees F.
[ ANS: ] 170 degrees

Equipment shall be so that the means of access for ordinary
operation and maintenance will not be _______. [ ANS: ]
Hazardous

Acceptance Tests:

Boilers shall not be placed in operation until they have been _____
and ____ and an equipment ____ _____ has been issued by the
______. [ ANS: ] Inspected and tested.

Use permit, commissioner

Periodic Inspections: All boilers must be inspected at least _____ a
_____ including chimney connections. [ ANS: ] Once a year

, 2
For Expert help and assignment solutions, +254707240657

Owners Annual Statement: The owner of each boiler shall file an
_____ written statement with the ________, specifying the _____of
each boiler and ______ for inspection. [ ANS: ] Annual,
commissioner, location, arrangement.

Field Tests: all piping and oil storage tanks shall be _______ tested
for tightness by the ______ before the system is operated. [ ANS: ]
Hydrostatically, contractor

The piping shall be tested at _____ times the max working pressure
applicable to that part of the piping system but at a pressure ____
than the test pressure required for the storage tank. [ ANS: ] 1/2,
© 2025 Assignment Expert




less

The min pressure for testing tanks shall be ____ times the max
working pressure but in no case less than ____ psi. [ ANS: ] 1 1/2, 25
psi
Guru01 - Stuvia




The hydrostatic pressure must be maintained until all ____ and
_____ have been visually inspected for ___, but in no case less than
_____ hour. [ ANS: ] Joints, connections, leaks, 1/2 hour.

A record must be kept of the pressure test showing the name of
the _____ and the _____ at which the piping and tank were tested.
[ ANS: ] Contractor, pressure

Gas piping must be tested by the _____ before operation. [ ANS: ]
Contractor

For oil burning systems, ____ ____ giving instructions for the care
and operation of the system shall be permanently located in an
easily _____ and _____ location near the equipment. [ ANS: ]
Instruction Cards, visible, accessible

No oil burning equipment shall be operated until an equipment
____ _____ has been issued by the commissioner, the requirements
of the ____ ____ control code have been met and until the

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Guru01 Chamberlain College Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
212
Member since
1 year
Number of followers
32
Documents
20352
Last sold
5 days ago

3.8

36 reviews

5
15
4
8
3
7
2
1
1
5

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions