actual questions and correct answers
The code official - CORRECT ANSWER When requirements necessary for proper
operation of a proposed mechanical system are not specifically covered by the code, such
requirements shall be determined by____________________.
State the reason for disapproval in writing to the applicant - CORRECT
ANSWER Where the code official finds that a proposed alternative material does not
comply with the intent of the code provisions, the code official shall _________________.
Interpret - CORRECT ANSWER The code official has the authority
to______________the provisions of the code.
At the job site - CORRECT ANSWER One set of construction documents shall be
kept_______________until completion of the project.
Holder of the permit - CORRECT ANSWER The______________shall be responsible
for the scheduling of inspections.
Ground source heat pump loop systems - CORRECT ANSWER Which of the
following installations is permitted to be backfilled prior to an underground inspection?
Code official - CORRECT ANSWER Mechanical systems shall be tested, with such
test made by the permit holder and observed by the________________.
10 - CORRECT ANSWER A permit is not required for a self-contained refrigeration
system that contains a maximum of_______________pound(s) of refrigerant.
International energy conservation code - CORRECT ANSWER Heating, Ventilating
and air-conditioning systems shall be designed and installed for efficient use of energy in
accordance with the________________.