100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

BICSI-TECHNICIAN EXAM UPDATED THIS YEAR WITH 200 QUESTIONS AND CORRECT ANSWERS WITH JUST RELEASED

Rating
-
Sold
-
Pages
33
Grade
A+
Uploaded on
03-11-2025
Written in
2025/2026

BICSI-TECHNICIAN EXAM UPDATED THIS YEAR WITH 200 QUESTIONS AND CORRECT ANSWERS WITH JUST RELEASED

Institution
BICSI-TECHNICIAN
Course
BICSI-TECHNICIAN











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
BICSI-TECHNICIAN
Course
BICSI-TECHNICIAN

Document information

Uploaded on
November 3, 2025
Number of pages
33
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

Page 1 of 33



BICSI-TECHNICIAN EXAM UPDATED THIS YEAR WITH 200
QUESTIONS AND CORRECT ANSWERS WITH JUST
RELEASED

Which of the following is submitted to request clarification, supplemental information, or
approval of material substitutions?

RFI Form

M drawings indicate the size and route of:

Air Handler Units, Chilled Water Piping, Refrigerant Piping, HVAC System Ducts

Which of the following testers should be used for optical fiber identification?

Visual Fault Locator (VFL)

Project schedules should be updated at least ______________ once the project has started,

Weekly

The size and route of sanitary sewer lines are indicated in the
________ drawings.

P Drawing

Which of the following documents is used to track daily activities at the work site?

Project Log

What is the first step that you should take to verify the existing infrastructure before you
begin a retrofit?

Review the existing documentation with the customer.

1
SUCCESS!

,Page 2 of 33


A graphical representation of a building space, or object prepared with adequate detail to
convey design information in a manner to serve as a guide for construction.

A Drawing

A graphical representation of the electrical components of a construction project (e.g., power
distribution, lighting).

E Drawing

Abbreviation for fire protection drawings

FP Drawing

Abbreviation for mechanical drawings.

M Drawing

Abbreviation for plumbing drawings

P Drawing

Abbreviation for structural drawings

S Drawing

This document covers the requirements for the ICT systems team and lists all of the elements
of the installation.

Scope of Work (SOW)

Abbreviation for telecommunications, security, and audiovisual drawings

T Drawing

Layer of a telecommunication drawing that contains campus or site information such as
exterior pathways and interbuilding systems

2
SUCCESS!

,Page 3 of 33


T0 Layer

Layer of a telecommunication drawing that contains building information.

T1 Layer

Layer of a telecommunication drawing that contains serving zone information

T2 Layer

Layer of a telecommunication drawing that contains information about telecommunications
rooms.

T3 Layer

Layer of a telecommunication drawing that contains the detail drawings.

T4 Layer

Layer of a telecommunication drawing that contains schedules and spreadsheets.

T5 Layer

A list of the quantity and specific types of materials to be used on a project. This list also
should consider miscellaneous hardware.

BOM

Abbreviation for operations and maintenance

O&M

Any number of safety apparatuses worn or used by an individual (e.g., hard hat, protective
eyewear, gloves, clothing) that shield against possible injury while performing tasks.

PPE



3
SUCCESS!

, Page 4 of 33


A document that provides detailed statements and descriptions of the work content for the
project requirements.

SOW

What are the three basic locations for storing materials?

Company-controlled location, At the work site, With the distributor

True or False: After completing the site survey and formulating a project implementation plan,
the designated ICT systems installation PM should hold an initial meeting with the entire ICT
systems installation team.

True

Which meeting should be held after the initial meeting and should include the cabling
installation team and appropriate contractors?

Pre-Installation Meeting

The progress meeting should only occur once a month

False

What describes the manpower and mobilization in terms of responsibility, skill level,
certification level and head count?

Project Plan

The building official, electrical inspector, fire marshal, or other individuals or entities
responsible for interpretation and enforcement of local building and electrical codes.

Authority Having Jurisdiction (AHJ)

A private, nonprofit membership organization focused on meeting the standards and
conformity assessment requirements of its diverse constituency.

4
SUCCESS!

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Ressy JOHN HOPKINS
View profile
Follow You need to be logged in order to follow users or courses
Sold
142
Member since
2 year
Number of followers
30
Documents
2408
Last sold
1 week ago

3.5

30 reviews

5
11
4
7
3
5
2
0
1
7

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions