• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 14 pages
Exam (elaborations)

EBOLC Project Management LATEST UPDATED exam WITH COMPLETE questions and VERIFIED answers 100% GUARANTEED PASS!!

Document preview thumbnail
Preview 2 out of 14 pages

1. When taping a blasting cap to a line or ring main, how much of the cap needs to be exposed on each side? - ANSWER 1/8 and 1/4 Inch 2. When priming a Bangalore with M456 Det Cord, how many wraps do you need on the bottom? - ANSWER 8 3. Where are the boosters located on the Bangalore Torpedo? How long are they? - ANSWER On each end of the Bangalore. They are 4 Inches long. 4. Explosives that are considered block in form are: - ANSWER C4 and TNT 5. The explosive that is considered cylindrical in form is: - ANSWER M1 Dynamite 6. The correct term for "the shattering effect of explosives in relation to that of TNT" is known as what? - ANSWER The Relative Effectiveness (RE) Factor 7. The part of the Basic Demo System that is responsible for carrying the pressure wave from the Initiation System to the Primary Charge is the _______. - ANSWER Firing System 8. Your line main or ring main must be made of what? - ANSWER Det Cord 9. List the types of high-strength blasting caps. - ANSWER M11, M14, M18, M19, M21, M23 10. List the types of low-strength blasting caps. - ANSWER M12, M13 11. Never attach M456 Det Cord, an M151, or an M152 to this component. - ANSWER M81 12. An _________ can accommodate and ensure proper proximity for initiating up to 5 shock tubes, 5 M151/152's OR 1 strand of M456 Det Cord. - ANSWER M9 Holder 13. This component has a high-strength blasting cap, factory-crimped to a 30-ft length of shock tube. It also has a small J-hook for easy attachment to M456 Let Cord, a yellow flag 2 meters from the blasting cap and a red flag 1 meter from the blasting cap. - ANSWER M11 14. An _____ has a high-strength blasting cap, factory-crimped to about 7.5 ft length of time fuse that has a 5 minute burn time. - ANSWER M14 15. When priming a block of C4 (M112), using M456 Det Cord, what knot is used below freezing? - ANSWER Uli Knot 16. When priming a block of C4 (M112), using M456 Det Cord, what knot is used above freezing? - ANSWER Double Overhand Knot

Content preview

EBOLC Project Management LATEST UPDATED exam
WITH COMPLETE questions and VERIFIED answers
100% GUARANTEED PASS!!


1. When taping a blasting cap to a line or ring main, how much of the
cap needs to be exposed on each side? - ANSWER 1/8 and 1/4 Inch


2. When priming a Bangalore with M456 Det Cord, how many wraps
do you need on the bottom? - ANSWER 8


3. Where are the boosters located on the Bangalore Torpedo? How
long are they? - ANSWER On each end of the Bangalore. They are
4 Inches long.


4. Explosives that are considered block in form are: - ANSWER C4
and TNT


5. The explosive that is considered cylindrical in form is: - ANSWER
M1 Dynamite


6. The correct term for "the shattering effect of explosives in relation
to that of TNT" is known as what? - ANSWER The Relative
Effectiveness (RE) Factor


7. The part of the Basic Demo System that is responsible for carrying
the pressure wave from the Initiation System to the Primary Charge
is the _______. - ANSWER Firing System

, 8. Your line main or ring main must be made of what? - ANSWER
Det Cord


9. List the types of high-strength blasting caps. - ANSWER M11,
M14, M18, M19, M21, M23


10.List the types of low-strength blasting caps. - ANSWER M12, M13


11.Never attach M456 Det Cord, an M151, or an M152 to this
component. - ANSWER M81


12.An _________ can accommodate and ensure proper proximity for
initiating up to 5 shock tubes, 5 M151/152's OR 1 strand of M456
Det Cord. - ANSWER M9 Holder


13.This component has a high-strength blasting cap, factory-crimped
to a 30-ft length of shock tube. It also has a small J-hook for easy
attachment to M456 Let Cord, a yellow flag 2 meters from the
blasting cap and a red flag 1 meter from the blasting cap. -
ANSWER M11


14.An _____ has a high-strength blasting cap, factory-crimped to
about 7.5 ft length of time fuse that has a 5 minute burn time. -
ANSWER M14


15.When priming a block of C4 (M112), using M456 Det Cord, what
knot is used below freezing? - ANSWER Uli Knot

Document information

Uploaded on
November 3, 2025
Number of pages
14
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$12.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Vintage
3.5
(4)
Sold
10
Followers
0
Items
531
Last sold
1 month ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions