AMPP C3 EXAM
What type of filter is required when spraying paint? - ANSWERS-
Organic Vapor with pre filter
What respirator would you pick for above 50,000 - ANSWERS-Blast
Helmet w/ APF of 1000
What does PPE training include - ANSWERS-Limitation of PPE
How to inspect the PPE
What type of fit test is required for full face negative pressure
respirator to have a APF of 50 - ANSWERS-Quantitative fit test
Hand tool cleaning is generally above the PEL - ANSWERS-TRUE
Purpose of monitoring - ANSWERS-What are the potential risk?
Workers, public, environment, and world
6 quality criteria pollutants - ANSWERS-Carbon Monoxide, Sulfur
Oxides, Nitrogen Oxides, Ozone, Lead, and Particulate size below 10
microns (PM-10)
Monitoring NAAQS - ANSWERS-No federal requirement for
monitoring hazardous coating for NAAQS
, Emission Method - ANSWERS-Method 9 - Record opacity every 20
secs up to 15 mins
Emission Method - ANSWERS-Method 22 - Record accumulated
time of all visible emission (Random)
NAAQS for Lead - ANSWERS-0.15 as 3 month rolling average
Ambient Air Monitoring - ANSWERS-Pre and Post
Full time during the project
Start ups
Calibration requirements for ambient air monitor - ANSWERS-Every
3 months
When the monitor is moved
Following monitor maintenance and repair
Containment and Job Site - ANSWERS-Label with warning signs and
barriers in the work area
Soil Samples Duration - ANSWERS-Pre and Post
Visual during the job
Documenting the Soil Sample - ANSWERS-Name, Date, and Job site
What type of filter is required when spraying paint? - ANSWERS-
Organic Vapor with pre filter
What respirator would you pick for above 50,000 - ANSWERS-Blast
Helmet w/ APF of 1000
What does PPE training include - ANSWERS-Limitation of PPE
How to inspect the PPE
What type of fit test is required for full face negative pressure
respirator to have a APF of 50 - ANSWERS-Quantitative fit test
Hand tool cleaning is generally above the PEL - ANSWERS-TRUE
Purpose of monitoring - ANSWERS-What are the potential risk?
Workers, public, environment, and world
6 quality criteria pollutants - ANSWERS-Carbon Monoxide, Sulfur
Oxides, Nitrogen Oxides, Ozone, Lead, and Particulate size below 10
microns (PM-10)
Monitoring NAAQS - ANSWERS-No federal requirement for
monitoring hazardous coating for NAAQS
, Emission Method - ANSWERS-Method 9 - Record opacity every 20
secs up to 15 mins
Emission Method - ANSWERS-Method 22 - Record accumulated
time of all visible emission (Random)
NAAQS for Lead - ANSWERS-0.15 as 3 month rolling average
Ambient Air Monitoring - ANSWERS-Pre and Post
Full time during the project
Start ups
Calibration requirements for ambient air monitor - ANSWERS-Every
3 months
When the monitor is moved
Following monitor maintenance and repair
Containment and Job Site - ANSWERS-Label with warning signs and
barriers in the work area
Soil Samples Duration - ANSWERS-Pre and Post
Visual during the job
Documenting the Soil Sample - ANSWERS-Name, Date, and Job site