A fill line in an oil burner system is a line used to: - (ANSWER)Fill the storage tank with oil.
The aquastat is located - (ANSWER)Below the water line.
All heating, combustion, and cooking equipment shall be installed with adequate clearances from
_______ construction. - (ANSWER)Combustible
The equipment must be provided with ______ or the building construction shall be _____ _____. -
(ANSWER)Insulation.
Fire Protected
During operation the surface of combustible construction materials will not be raised to a temp higher
than _____ degrees F. - (ANSWER)170 degrees
Equipment shall be so that the means of access for ordinary operation and maintenance will not be
_______. - (ANSWER)Hazardous
Acceptance Tests:
Boilers shall not be placed in operation until they have been _____ and ____ and an equipment ____
_____ has been issued by the ______. - (ANSWER)Inspected and tested.
Use permit, commissioner
Periodic Inspections: All boilers must be inspected at least _____ a _____ including chimney
connections. - (ANSWER)Once a year
Owners Annual Statement: The owner of each boiler shall file an _____ written statement with the
________, specifying the _____of each boiler and ______ for inspection. - (ANSWER)Annual,
commissioner, location, arrangement.
Field Tests: all piping and oil storage tanks shall be _______ tested for tightness by the ______ before
the system is operated. - (ANSWER)Hydrostatically, contractor
, P-99 Low Pressure Boiler COF FDNY Newest 2025/2026 Complete Questions And Correct Detailed
Answers (Verified Answers) |Brand New Version!!
The piping shall be tested at _____ times the max working pressure applicable to that part of the piping
system but at a pressure ____ than the test pressure required for the storage tank. - (ANSWER)1/2, less
The min pressure for testing tanks shall be ____ times the max working pressure but in no case less than
____ psi. - (ANSWER)1 1/2, 25 psi
The hydrostatic pressure must be maintained until all ____ and _____ have been visually inspected for
___, but in no case less than _____ hour. - (ANSWER)Joints, connections, leaks, 1/2 hour.
A record must be kept of the pressure test showing the name of the _____ and the _____ at which the
piping and tank were tested. - (ANSWER)Contractor, pressure
Gas piping must be tested by the _____ before operation. - (ANSWER)Contractor
For oil burning systems, ____ ____ giving instructions for the care and operation of the system shall be
permanently located in an easily _____ and _____ location near the equipment. - (ANSWER)Instruction
Cards, visible, accessible
No oil burning equipment shall be operated until an equipment ____ _____ has been issued by the
commissioner, the requirements of the ____ ____ control code have been met and until the approval
for the storage of ____ ____ has been given by the fire commissioner. - (ANSWER)Use permit, air
pollution, fuel oil
Every oil burning installation that is not fully automatic or requires preheating shall be operated under
the direct supervision of a person holding a ____ ___ ______ issued by the FD. - (ANSWER)COF
Such person must be in the building at ____ ____ while in operation and present in the _____ _____
during startup. - (ANSWER)All times, boiler room
After any repairs to the boiler are made, ______ shall check the repairs and the functioning of all ____
_____ and the positioning of the ______. - (ANSWER)Operators, control devices, valves
Answers (Verified Answers) |Brand New Version!!
A fill line in an oil burner system is a line used to: - (ANSWER)Fill the storage tank with oil.
The aquastat is located - (ANSWER)Below the water line.
All heating, combustion, and cooking equipment shall be installed with adequate clearances from
_______ construction. - (ANSWER)Combustible
The equipment must be provided with ______ or the building construction shall be _____ _____. -
(ANSWER)Insulation.
Fire Protected
During operation the surface of combustible construction materials will not be raised to a temp higher
than _____ degrees F. - (ANSWER)170 degrees
Equipment shall be so that the means of access for ordinary operation and maintenance will not be
_______. - (ANSWER)Hazardous
Acceptance Tests:
Boilers shall not be placed in operation until they have been _____ and ____ and an equipment ____
_____ has been issued by the ______. - (ANSWER)Inspected and tested.
Use permit, commissioner
Periodic Inspections: All boilers must be inspected at least _____ a _____ including chimney
connections. - (ANSWER)Once a year
Owners Annual Statement: The owner of each boiler shall file an _____ written statement with the
________, specifying the _____of each boiler and ______ for inspection. - (ANSWER)Annual,
commissioner, location, arrangement.
Field Tests: all piping and oil storage tanks shall be _______ tested for tightness by the ______ before
the system is operated. - (ANSWER)Hydrostatically, contractor
, P-99 Low Pressure Boiler COF FDNY Newest 2025/2026 Complete Questions And Correct Detailed
Answers (Verified Answers) |Brand New Version!!
The piping shall be tested at _____ times the max working pressure applicable to that part of the piping
system but at a pressure ____ than the test pressure required for the storage tank. - (ANSWER)1/2, less
The min pressure for testing tanks shall be ____ times the max working pressure but in no case less than
____ psi. - (ANSWER)1 1/2, 25 psi
The hydrostatic pressure must be maintained until all ____ and _____ have been visually inspected for
___, but in no case less than _____ hour. - (ANSWER)Joints, connections, leaks, 1/2 hour.
A record must be kept of the pressure test showing the name of the _____ and the _____ at which the
piping and tank were tested. - (ANSWER)Contractor, pressure
Gas piping must be tested by the _____ before operation. - (ANSWER)Contractor
For oil burning systems, ____ ____ giving instructions for the care and operation of the system shall be
permanently located in an easily _____ and _____ location near the equipment. - (ANSWER)Instruction
Cards, visible, accessible
No oil burning equipment shall be operated until an equipment ____ _____ has been issued by the
commissioner, the requirements of the ____ ____ control code have been met and until the approval
for the storage of ____ ____ has been given by the fire commissioner. - (ANSWER)Use permit, air
pollution, fuel oil
Every oil burning installation that is not fully automatic or requires preheating shall be operated under
the direct supervision of a person holding a ____ ___ ______ issued by the FD. - (ANSWER)COF
Such person must be in the building at ____ ____ while in operation and present in the _____ _____
during startup. - (ANSWER)All times, boiler room
After any repairs to the boiler are made, ______ shall check the repairs and the functioning of all ____
_____ and the positioning of the ______. - (ANSWER)Operators, control devices, valves