Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 8 pages
Exam (elaborations)

Fado Pumping Questions with 100% Correct Answers

Document preview thumbnail
Preview 2 out of 8 pages

Fado Pumping Questions with 100% Correct Answers

Content preview

Fado Pumping Questions with 100%
Correct Answers
Nozzle pressure ( NP) Correct Answer: Pressure needed at the nozzle to create
and adequate fire stream. Fog = 100, smooth bore 50 and mast stream smooth
bore 80


Engine pressure ( EP) Correct Answer: Total engine pressure is on the master
discharge gauge, discharge for the individual discharges


Gallons per minute ( GPM) Correct Answer: Amount of water per minute that's
coming out the end of the hose


Head pressure ( HP) Correct Answer: Pressure positive or negative for Up hill or
down hill, up floors or down floors


Appliance ( APPL) Correct Answer: Water passes through these and creates
friction


Friction loss ( FL) Correct Answer: Friction loss through a given line


Standpipe (SP) Correct Answer: Creates friction, similar to an appliance


Base Correct Answer: Pre completed pressure calculations for elevated streams


Relay Correct Answer: Pumping from a hydrant to another apparatus or from an
apparatus to apparatus in a long relay operation


3 things needed to determine the basic EP of a given line Correct Answer: NP,
size of the hose, and amount of hose in use. Other factors that affect EP include
elevation and appliances


In cab operations for pumping Correct Answer: 1. Spot apparatus

, 2. Set air brakes


3. Shift to neutral( slight RPM increase, verify transmission indicator).


4. Engage pump ( listen for engagement, light on dash to illuminate


5.shift into drive ONLY ON NON SALISBURY


6. Verify radio frequency


7. Switch radio to remote


8. Deactivate jake brake


9. Light area


10. Activate four way flashers. ( not listed in FADO, scan gauges )


Outside operations for pumping Correct Answer: 1. Ensure green pump light is
on


2.open tank to pump valve


3. Clear hose bed


4. Connect hose


5. Set chocks BEFORE INCREASING RPM


6. Wait for water to be called ( verbally or by hand, not listed but acknowledge
call for water)


7. Open discharge

Document information

Uploaded on
October 30, 2025
Number of pages
8
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
7
Followers
0
Items
4111
Last sold
1 week ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions