PJM6135 Project Quality Management; Week 4_Test Your Knowledge (TYK): Different versions (4) answered latest 2025.

Rating
-
Sold
-
Pages
28
Grade
A+
Uploaded on
29-10-2025
Written in
2025/2026

PJM6135 Project Quality Management; Week 4_Test Your Knowledge (TYK): Different versions (4) answered latest 2025.











Whoops! We can’t load your doc right now. Try again or contact support.

Document information

Uploaded on
October 29, 2025
Number of pages
28
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

2024/12/3 22:06 Week 4_Test Your Knowledge (TYK): PJM6135 71779 Project Quality Management SEC 14 Fall 2024 CPS [BOS-B-HY]



Week 4_Test Your Knowledge (TYK)
Due No due date
Points 100
Questions 10
Time Limit None
Allowed Attempts Unlimited


Instructions
This practice test covers weeks 1-4 course materials, which include an introduction to project quality
management, quality planning, quality plan implementation, and quality control. Each answer contains
detailed explanations to help you master the course materials. Take notes as you learn as the final exam
will cover week 1-week 6 course materials.
Test Parameters
Logistics: Online
Number of Questions: 10
Duration: 60 minutes
Possible points: 100 points
Questions Type: Fill in the blank, multiple choice, multiple answer, and matching
Question Delivery: One question at a time
Multiple Attempts: Unlimited
Force Completion: Once started, this Test must be completed in one sitting.
Due date: Sunday of the FOURTH week of the course

Take the Quiz Again

Attempt History
Attempt Time Score

LATEST Attempt 1 3 minutes 100 out of 100

Submitted Dec 3 at 10:05pm


Question 1
10/ 10 pts

At an electronic manufacturing company, the quality manager of a process improvement project
measures the weight of TV screens by weighing a sample of five randomly picked TV screens daily. The
manufacturing process is currently considered to be in control, with the standard deviation of sample
means equaling 0.45 inches. The results of the last four days are presented in the attached table.
PJM6135_ Weeks 4-5_ Screens' Weights in Inches.jpg

https://northeastern.instructure.com/courses/196393/quizzes/642880 117

,2024/12/3 22:06 Week 4_Test Your Knowledge (TYK): PJM6135 71779 Project Quality Management SEC 14 Fall 2024 CPS [BOS-B-HY]
(https://northeastern.instructure.com/assessment_questions/328999/files/532275/download?
verifier=XW7zXrWghWJUei6zhMnAUwltdUnnab5gm8D5pgnn&wrap=1) Calculate the upper control limit
(UCL) and the lower control limit (LCL) for the mean chart assuming that the company is using a 3-sigma
process model. Round to the nearest hundredth.




Correct!
(26.58, 29.28)
(27.62, 29.28)
(26.64, 28.91)
(24.85, 29.45)

UCL = 29.28; LCL = 26.58. Find the mean for each day. For example, the mean for Day 1 mean = (28.91
+ 26.64 + 27.64 + 28.90 + 28.46)/5 = 28.11. The means for Day 1 to Day 4 28.11, 28.34, 27.66, and
27.62, respectively. To find the center line, average the sample means: X-double-bar = 27.93.
For a 3-sigma model, UCL = X-double-bar + 3*s = 27.93 + (3 x 0.45) = 29.28.
LCL = X-double-bar -(3 x s) = 27.93 -(3 x 0.45) = 26.58.




Question 2
10/ 10 pts

According to Garvin's definition of quality, quality is found in the components and attributes of
a product.




Transcendent

Manufacturing-based
Correct!
Product-based

Value-based

Garvin found that most definitions of quality were transcendent, product-based, user-based,
manufacturing-based, or value-based. According to the product-based definition, differences in quality
amount to differences in the quantity of some desired ingredient in or attribute of the product.




https://northeastern.instructure.com/courses/196393/quizzes/642880 2/7

, 2024/12/3 22:06 Week 4 _Test Your Knowledge (TYK): PUM6135 71779 Project Quality Management SEC 14 Fall 2024 CPS [BOS-B-HY]

Question 3
10/ 10 pts

At an electronic manufacturing company, the quality manager of a process improvement project
measures the weight of TV screens by weighing a sample of five randomly picked TV screens daily. The
manufacturing process is currently considered to be in control, with the standard deviation of sample
means equaling 0.45 inches. The results of the last four days are presented in the attached table.
PJM6135-Daily Samples From Machine A_weeks4-5.jpg
(https://northeastern.instructure.com/assessment_questions/329000/files/532277/download?
verifier=VEAdrilJvwRnIQQKOvaOtcX7KvM7djNzN8ofXAZT&wrap=1)

What are the upper control limit (UCL) and lower control limit (LCL) of the range chart? Round to the
nearest hundredth.




(1.53, 2.99)
(0, 3.69)
(2.13, 27.93)
Correct!

(0, 4.49)
UCL(R) = 4.49; LCL(R) = 0. Find the range for each day. The range is the maximum value minus the
minimum value. For example, the range for Day 1 is 28.91 -26.64 = 2.27. The ranges for Day 1 to Day 4
are 2.27, 1.72, 1.53, and 2.99, respectively. The average of the ranges R-bar = 2.13 inches. UCL(R) =
R-bar x D4, LCL(R) = R-bar x D3.

For a sample size of five, D4 = 2.11 and D3 = 0.
UCL(R) =2.13 x 2.11 =4 .49.
LCL(R)=2.13x0=0.




Question 4
10 /10 pts
A


Success in project quality management requires the participation of all members of the project team. --
-------- responsibility is to provide suitable resources at adequate capacities.




https://northeastern.instructure.com/courses/196393/quizzes/642880 3/7

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
melleystuvia Nightingale College
View profile
Follow You need to be logged in order to follow users or courses
Sold
86
Member since
8 months
Number of followers
4
Documents
1247
Last sold
15 hours ago
Edusolutionguides.

We learn all subject preparation for the final exam. We give the online assignment and homework for all the subjects. That's why you prepare well for all the paperwork.

3.0

18 reviews

5
5
4
4
3
2
2
0
1
7

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions