ENCE 325 Midterm 1 Exam Questions with Correct Answers Graded A+ Primary + Secondary players - Answers Owner: Designer: General Contractor: Consulting eng. Supplier Spec writer sub contractors Contractors Team - Answers Principal in Charge Project Manager Superintendent Estimator Accounting Foreman field eng. PROJECT PROCESS - Answers 1.) Feasibility (owner) 2a.) Programming (owner) 2b.) Design (architect) 3.) Bidding + Award (architect) 4.) Pre-construction + Mobilization (gc) 5.) Construction (gc) 6.) Close-out + Occupancy (gc/owner) 1. Feasibility - Answers Owners responsibility: - asses risks / needs / demand / site / finance at end of assessment: continue, adjust, or abandon project 2a. Programming - Answers A program is a written statement which identifies the needs and requirements for a project. The program provides guidance to the architect.Owners responsibility: - Needs + requirements for a project 2b. Design - Answers Architects responsibility: - drawings made that allows cost estimate 3. Bidding + Award - Answers Architects responsibility: - bid docs completed - bids are solicited from several contractors - bid is chosen / job is awarded 4. Pre-construction + Mobilization - Answers General Contractor (gc) responsibility: - how and who will do work - detailed budget - permits/subcontracts - move onto site 5. Construction - Answers General Contractor (gc) responsibility: - ensuring time + cost + quality goals are met 6. Close out + Occupancy - Answers Contractor / Owner responsibility: - warranty period / final payment Types of Contracts - Answers - Lump Sum Contracts - Unit Price Contracts - Cost plus Fee Contracts - Cost Plus with a Guaranteed Maximum Price (GMP) Contract Lump Sum Contract (fixed price contract) - Answers Work done for a set price - least risky for owner - riskiest for contractor - requires good design information - inflexible / changes are expensive - typically the architect administers the contract for the owner Types of projects for Lump sum - Answers - Competitively bid projects - Projects with a fixed/tight budget

Content preview

ENCE 325 Midterm 1 Exam Questions with Correct Answers Graded A+

Primary + Secondary players - Answers Owner:

Designer: General Contractor:

Consulting eng. Supplier

Spec writer sub contractors

Contractors Team - Answers Principal in Charge

Project Manager

Superintendent Estimator Accounting

Foreman field eng.

PROJECT PROCESS - Answers 1.) Feasibility (owner)

2a.) Programming (owner)

2b.) Design (architect)

3.) Bidding + Award (architect)

4.) Pre-construction + Mobilization (gc)

5.) Construction (gc)

6.) Close-out + Occupancy (gc/owner)

1. Feasibility - Answers Owners responsibility:

- asses risks / needs / demand / site / finance



at end of assessment: continue, adjust, or abandon project

2a. Programming - Answers A program is a written statement which identifies the needs and

requirements for a project. The program provides guidance to the

architect.Owners responsibility:

- Needs + requirements for a project

2b. Design - Answers Architects responsibility:

, - drawings made that allows cost estimate

3. Bidding + Award - Answers Architects responsibility:

- bid docs completed

- bids are solicited from several contractors

- bid is chosen / job is awarded

4. Pre-construction + Mobilization - Answers General Contractor (gc) responsibility:

- how and who will do work

- detailed budget

- permits/subcontracts

- move onto site

5. Construction - Answers General Contractor (gc) responsibility:

- ensuring time + cost + quality goals are met

6. Close out + Occupancy - Answers Contractor / Owner responsibility:

- warranty period / final payment

Types of Contracts - Answers - Lump Sum Contracts

- Unit Price Contracts

- Cost plus Fee Contracts

- Cost Plus with a Guaranteed Maximum Price (GMP) Contract

Lump Sum Contract (fixed price contract) - Answers Work done for a set price

- least risky for owner

- riskiest for contractor

- requires good design information

- inflexible / changes are expensive

- typically the architect administers the contract for the owner

Types of projects for Lump sum - Answers - Competitively bid projects

Document information

Uploaded on
October 29, 2025
Number of pages
9
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$10.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
joshuawesonga22
3.5
(14)
Sold
124
Followers
2
Items
15252
Last sold
3 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions