• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 21 pages
Exam (elaborations)

AHIT Module 1 Questions with Detailed Verified Answers

Document preview thumbnail
Preview 3 out of 21 pages

AHIT Module 1 Questions with Detailed Verified AnswersAHIT Module 1 Questions with Detailed Verified AnswersAHIT Module 1 Questions with Detailed Verified AnswersAHIT Module 1 Questions with Detailed Verified AnswersAHIT Module 1 Questions with Detailed Verified AnswersAHIT Module 1 Questions with Detailed Verified Answers

Content preview

1|Page




AHIT Module 1 Questions with
Detailed Verified Answers
Which of the following is not part of the structural inspection? Ans: fascia
boards


What part of a home's structure is least likely to be visible to the home
inspector? Ans: footings


What is the overall purpose of the structural inspection? Ans: to identify major
structural deficiencies


How does compression act on structural members? Ans: It pushes at the
members and makes them shorter.


Which action is a best practice to identify deterioration? Ans: probe structural
components where damage is suspected


Which force would exert the least amount of stress on a foundation? Ans:
wind


If you note an active 1/4" step crack with no apparent movement, you should
_____. Ans: recommend a structural engineer be consulted to assess the crack


For which type of foundation cracking should a structural engineer be
recommended? Ans: horizontal cracks with movement


What sign indicates that a foundation crack is still active? Ans: sharp edges to
the crack

,2|Page




For which condition should the customer be advised to monitor the
foundation wall? Ans: cracks less than 1/4" wide showing little or no
movement


At which communication step should the home inspector be particularly
careful about not making any uneducated guesses? Ans: telling how to repair
something


In a solid brick house, what is a sign of corner settlement? Ans: step cracks at
an exterior corner going down to the foundation


Vertical cracks in the foundation wall extending down to the footings can be
caused by _____. Ans: settlement of the structure


Water stains along the junction of the basement wall and floor most likely
indicate _____. Ans: a drain tile problem


What is a sign that an underground oil tank may be present? Ans: two holes
in the wall with disconnected copper tubing


When inspecting ledger strips in the basement ceiling structure, the home
inspector should _____. Ans: watch out for nails pulling out and for sagging
and cracking


Which of the following is a sign of water penetration through the foundation
wall? Ans: efflorescence on the wall


Water penetration in a single corner of the basement is most likely caused by
_____. Ans: a faulty downspout or splash block


A hole cut into a girder or joist can be located _____. Ans: at least 2" in from
top or bottom

, 3|Page




What is the weakest of the following girder/joist connections? Ans: ledger
strips


The source of most of the water leaking into basements can be attributed to
_____. Ans: surface water


What purpose does a palmer valve serve? Ans: It allows water to flow from
the drain tile system into the sewer.


Ceiling insulation in a crawl space, in most cases, should be installed _____.
Ans: with the moisture deterrent layer up


What can be a sign of slab detachment? Ans: cracks along the slab edge


What is not a likely cause of slab settlement? Ans: shrinkage of the concrete
slab


Which of the following is true about perimeter vents in a crawl space? Ans:
There is little agreement about when to keep vents open or closed based on
different climate issues.


Perimeter venting is required in a crawl space to prevent _____. Ans: moisture
from soil rising into the house


Which of the conditions can be caused by poor ventilation in a crawl space?
Ans: deterioration of framing members


Why should a dirt floor in a crawl space be covered? Ans: to prevent moisture
from the soil being released into the crawl space


In balloon framing construction, the wall studs rest directly on the _____. Ans:
sill

Document information

Uploaded on
October 27, 2025
Number of pages
21
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Ivie
3.4
(7)
Sold
34
Followers
1
Items
8525
Last sold
2 weeks ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions