Terms in this set (54)
Under Dispenser c. standards of an independent testing organization
Containment is required to with industry code
be designed and
constructed in
accordance with ____.
a. the appropriate
Executive Order
b. generally accepted
secondary containment
practices
c. standards of an
independent testing
organization with industry
code
d. an engineering
specification approved by
a state registered
professional engineer or
engineering standard
https://quizlet.com/1097854957/icc-vapor-recovery-1-pt-2-exam-comprehensive-questions-frequently-most-tested-questions-and-verified-solutionsget… 1/20
,10/24/25, 8:16 AM ICC Vapor Recovery 1 Pt. 2 Exam comprehensive questions | FREQUENTLY MOST TESTED QUESTIONS AND VERIFIED SOL…
With a Gilbarco Vapor- b. 75%
Vac, the OPW 12VW
nozzle has a hole or tear
in the vapor escape guard,
it is a defect if ____% of the
circumference is missing.
a. 25%
b. 75%
c. 50%
d. 65%
Gasoline thread sealant a. threaded portion of rotatable adapters
can be used on all except
_____.
a. threaded portion of
rotatable adapters
b. p/v valve
c. ball float
d. riser adapter
when installing copper d. copper stretching tool
tubing use all except _____.
a. copper tubing cutter
b. copper bending tool
c. copper flaring tool
d. copper stretching tool
The Husky P/V valve has a b. 20-50 lbs
torque range of...
a. 50-75 lbs
b. 20-50 lbs
c. 30-50 lbs
d. 40-50 lbs
https://quizlet.com/1097854957/icc-vapor-recovery-1-pt-2-exam-comprehensive-questions-frequently-most-tested-questions-and-verified-solutionsget… 2/20
, 10/24/25, 8:16 AM ICC Vapor Recovery 1 Pt. 2 Exam comprehensive questions | FREQUENTLY MOST TESTED QUESTIONS AND VERIFIED SOL…
When installing the d. oil or grease
hanging hardware
together use...
a. pipe dope
b. non-hardening sealant
c. teflon tape
d. oil or grease
When installing in the EO d. all the above
VR-101-E you should have
on site _____.
a. the executive order
b. Phil-tite installation
manual
c. the equipment checklist
d. all the above
There are four ball valves c. top valve open, the rest are closed
on the clean air separator,
what position are they to
be in?
a. top and bottom valve
open, the rest are closed
b. top and bottom valve
closed, the rest are open
c. top valve open, the rest
are closed
d. bottom valve open, the
rest are closed
https://quizlet.com/1097854957/icc-vapor-recovery-1-pt-2-exam-comprehensive-questions-frequently-most-tested-questions-and-verified-solutionsget… 3/20
ICC Vapor Recovery 1 Pt. 2 Exam comprehensive
questions | FREQUENTLY MOST TESTED
QUESTIONS AND VERIFIED SOLUTIONS/GET IT
100% ACCURATE!! 2025!!
Save
Terms in this set (54)
Under Dispenser c. standards of an independent testing organization
Containment is required to with industry code
be designed and
constructed in
accordance with ____.
a. the appropriate
Executive Order
b. generally accepted
secondary containment
practices
c. standards of an
independent testing
organization with industry
code
d. an engineering
specification approved by
a state registered
professional engineer or
engineering standard
https://quizlet.com/1097854957/icc-vapor-recovery-1-pt-2-exam-comprehensive-questions-frequently-most-tested-questions-and-verified-solutionsget… 1/20
,10/24/25, 8:16 AM ICC Vapor Recovery 1 Pt. 2 Exam comprehensive questions | FREQUENTLY MOST TESTED QUESTIONS AND VERIFIED SOL…
With a Gilbarco Vapor- b. 75%
Vac, the OPW 12VW
nozzle has a hole or tear
in the vapor escape guard,
it is a defect if ____% of the
circumference is missing.
a. 25%
b. 75%
c. 50%
d. 65%
Gasoline thread sealant a. threaded portion of rotatable adapters
can be used on all except
_____.
a. threaded portion of
rotatable adapters
b. p/v valve
c. ball float
d. riser adapter
when installing copper d. copper stretching tool
tubing use all except _____.
a. copper tubing cutter
b. copper bending tool
c. copper flaring tool
d. copper stretching tool
The Husky P/V valve has a b. 20-50 lbs
torque range of...
a. 50-75 lbs
b. 20-50 lbs
c. 30-50 lbs
d. 40-50 lbs
https://quizlet.com/1097854957/icc-vapor-recovery-1-pt-2-exam-comprehensive-questions-frequently-most-tested-questions-and-verified-solutionsget… 2/20
, 10/24/25, 8:16 AM ICC Vapor Recovery 1 Pt. 2 Exam comprehensive questions | FREQUENTLY MOST TESTED QUESTIONS AND VERIFIED SOL…
When installing the d. oil or grease
hanging hardware
together use...
a. pipe dope
b. non-hardening sealant
c. teflon tape
d. oil or grease
When installing in the EO d. all the above
VR-101-E you should have
on site _____.
a. the executive order
b. Phil-tite installation
manual
c. the equipment checklist
d. all the above
There are four ball valves c. top valve open, the rest are closed
on the clean air separator,
what position are they to
be in?
a. top and bottom valve
open, the rest are closed
b. top and bottom valve
closed, the rest are open
c. top valve open, the rest
are closed
d. bottom valve open, the
rest are closed