Exam (elaborations)

[NHIE Exam Practice Test (2025 Edition)] – [National Home Inspector Examination] | Complete [100 Questions & Verified Answers + Explanations] | Updated [2025–2026 Home Inspection Certification Prep Guide]

Document preview thumbnail
Preview 3 out of 26 pages

[NHIE Exam Practice Test (2025 Edition)] – [National Home Inspector Examination] | Complete [100 Questions & Verified Answers + Explanations] | Updated [2025–2026 Home Inspection Certification Prep Guide]

Content preview

NHIE EXAM WITH 100 QUESTIONS AND ANSWERS


1. Buckling in horizontal vinyl siding is generally caused by

A. reflected sunlight.

B. improper fastening.

C. condensation in walls.

D. improper house wrap. - ANSWER improper fastening

2. At what level would water pressure within a single-family dwelling begin to be considered
excessive and require correction?

A. 60 psi

B. 80 psi

C. 100 psi

D. 120 psi - ANSWER 80 psi

3. A newer home with electric heat is being inspected. It has a below grade finished basement
containing a bedroom. The inspector should look for a smoke alarm and

A. an escape and rescue opening.

B. a carbon monoxide alarm.

C. a fire extinguisher.

D. a safety ladder. - ANSWER an escape and rescue opening

4. A swimming pool fence must prevent passage of a sphere that is larger than

A. 2 inches.

B. 3 inches.

C. 4 inches.

D. 5 inches. - ANSWER 4 inches

5. Refer to the photograph to answer this question. What should an inspector recommend to

,the client regarding the conditions shown in relation to the downspout/rain leader?

A. Nothing, the downspout is properly installed.

B. Gravel should be installed under the downspout.

C. The downspout should be moved away from the siding.

D. A contractor should evaluate the downspout and recommend repairs.A contractor should
evaluate the downspout and recommend repairs - ANSWER

6. If water infiltration is suspected behind a finished surface. What tool would be the best
choice to verify dampness?

A. an infrared thermometer

B. a pin-type moisture meter

C. a non-contact moisture meter

D. a digital camera - ANSWER a non-contact moisture meter

7. Gas-fired furnace heat exchangers most often fail from

A. low temperatures.

B. lack of use.

C. improper gas pressure.

D. rust and metal fatigue. - ANSWER rust and metal fatigue.

8. Relative Humidity (RH) is expressed as

A. volume.

B. percentage.

C. capacity.

D. temperature. - ANSWER percentage.

9. Connections of dissimilar metal in a plumbing system, such as galvanized steel pipe and
copper pipe, will usually cause

A. reduced water pressure.

B. decreased water quality.

, C. glazed pipes.

D. electrolysis. - ANSWER electrolysis.

10. A Ground fault circuit interrupter (GFCI) is a safety device that

A. disconnects power when the grounding to the outlet is faulty.

B. detects moisture and disconnects power in wet locations.

C. disconnects the power when sensing current leakage to ground.

D. protects against electrical surges and voltage spikes. - ANSWER disconnects the power
when sensing current leakage to ground

11. An electrical system with a fuse on the neutral conductor and on the energized (hot)
conductors

A. is twice as safe as a system where only the energized (hot) conductors are fused.

B. should have the neutral conductor fuse sized to one half the normal ampacity for the
circuit.

C. is overfused up to 50% if used only for lighting.

D. is hazardous and should be corrected. - ANSWER is hazardous and should be corrected

12. To operate a central air conditioner, an electric clothes dryer, and an electric range, the
ampacity

of the service to the house should be AT LEAST

A. 100 amps at 120 volts.

B. 125 amps at 120 volts.

C. 60 amps at 240 volts.

D. 100 amps at 240 volts. - ANSWER D

13. A floor joist in a crawl space has been cut where the toilet drain passes through the floor.
The joists are 2x6 spaced at 16" on center. The inspector should recommend that

A. the buyer monitor the floor. Floor systems such as this have redundant framing and

removal of one joist is insignificant.

B. a contractor should support the cut joist with new piers and posts from below.

Document information

Uploaded on
October 24, 2025
Number of pages
26
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$21.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
completeguide
3.0
(4)
Sold
1042
Followers
1
Items
387
Last sold
4 days ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions