VA DEQ SWM Inspector Exam
Answered Correctly!!
Erosion and sediment control plans and stormwater management plans CORRECT
ANSWERS SWPPP plans that must be approved
Post-construction CORRECT ANSWERS When the stormwater management plan
address runoff
Volume and velocity of stormwater runoff increases as natural vegetation is replaced
with these surfaces. The increase in stormwater runoff leads to an increase in
pollutants, such as sediment and phosphorus that are carried to waterways. CORRECT
ANSWERS Impervious cover
Target pollutant in the water quality criteria CORRECT ANSWERS Phosphorus
The lower limit of the range of imperviousness that can result in stream degradation%
CORRECT ANSWERS 10%
SWM regulation ensures water quantity is considered to protect against which two
destructive forces? CORRECT ANSWERS Channel erosion and flooding
This increases after development because of the replacement of vegetation with
impervious surfaces. A larger volume of water will travel more quickly through a stream
channel, potentially causing erosion and flooding. CORRECT ANSWERS The rate of
runoff
A what must be at least as stringent as the Construction GP (9VAC25-870-106)?
CORRECT ANSWERS Locality VSMP
ESC Plan and SWM Plan (9VAC25-870-148) CORRECT ANSWERS Plans a locality's
ordinance must require to be submitted and approved.
No state registration statement; no SWPPP; incomplete SWPPP; SWPPP not available
for review; no approved ESC plan; failure to install stormwater management BMPs or
ESCs; stormwater BMPs or erosion and sediment controls improperly installed or
maintained; operation deficiencies; failure to conduct required inspections; incomplete,
improper, or missed inspections CORRECT ANSWERS Violations for which a penalty
may be imposed
$32500 CORRECT ANSWERS Maximum penalty a locality can impose under the
stormwater act
Answered Correctly!!
Erosion and sediment control plans and stormwater management plans CORRECT
ANSWERS SWPPP plans that must be approved
Post-construction CORRECT ANSWERS When the stormwater management plan
address runoff
Volume and velocity of stormwater runoff increases as natural vegetation is replaced
with these surfaces. The increase in stormwater runoff leads to an increase in
pollutants, such as sediment and phosphorus that are carried to waterways. CORRECT
ANSWERS Impervious cover
Target pollutant in the water quality criteria CORRECT ANSWERS Phosphorus
The lower limit of the range of imperviousness that can result in stream degradation%
CORRECT ANSWERS 10%
SWM regulation ensures water quantity is considered to protect against which two
destructive forces? CORRECT ANSWERS Channel erosion and flooding
This increases after development because of the replacement of vegetation with
impervious surfaces. A larger volume of water will travel more quickly through a stream
channel, potentially causing erosion and flooding. CORRECT ANSWERS The rate of
runoff
A what must be at least as stringent as the Construction GP (9VAC25-870-106)?
CORRECT ANSWERS Locality VSMP
ESC Plan and SWM Plan (9VAC25-870-148) CORRECT ANSWERS Plans a locality's
ordinance must require to be submitted and approved.
No state registration statement; no SWPPP; incomplete SWPPP; SWPPP not available
for review; no approved ESC plan; failure to install stormwater management BMPs or
ESCs; stormwater BMPs or erosion and sediment controls improperly installed or
maintained; operation deficiencies; failure to conduct required inspections; incomplete,
improper, or missed inspections CORRECT ANSWERS Violations for which a penalty
may be imposed
$32500 CORRECT ANSWERS Maximum penalty a locality can impose under the
stormwater act