Certified Construction Manager EXAM
Most Recent exam COMPLETE (2025)
EXAM Questions and Answers (Verified
Answers) (Latest Update 2025) UPDATE!!
Questions and Correct Answers/ Latest
Update / Already Graded
Construction Management
Ans: The practice of professional management applied to the
planing, design, and construction of projects, from inception to
completion, for the purpose of controlling time, cost, and
quality
Construction Contract Administration Objectives
Ans: To control: time, cost, quality, information flow and to
satisfy the Owner's goals and objectives for the project
Design Bid Build Advantages
Ans: Widely applicable, understandable, owner retains control,
owner "knows" the cost prior to the start of Construction
Design Bid Build Disadvantages
All rights reserved © 2025/ 2026 |
, Page |2
Ans: Relatively slow, owner is liable for the design,
constructability issues, adversarial relationships fostered
Multiple Prime Advantages
Ans: Increased Owner control, work easily fast-tracked, save
general contractor markups, some states require it
Multiple Prime Disadvantages
Ans: Owner has risk of controlling time and coo rdination,
multiple accountability for performance, unknown "final" cost
at construction start, same owner risks as traditional approach
CM at Risk Advantags
Ans: Well-suited for fast-tracking, contractor (and
subcontractor) input on design alternatives, better cost info,
permits "picking" of the builder
CM at Risk Disadvantages
Ans: Change of CM's accountability after, GMP (guaranteed
maximum price) is signed, tempted to sign GMP "too soon",
variations in procurement methods
All rights reserved © 2025/ 2026 |
, Page |3
Design-Build Advantages
Ans: Accountability for project delivery, reduced disputes, can
cut time and cost, builder can have input to
design/constructabibility, budget established early on
Design-Build Disadvantages
Ans: Early definition of the program required, owner's loss of
control during design, potential for quality to be compromised
What is True concerning delivery methods?
Ans: delivery methods are the forms of organizing the
construction project, all delivery methods have dis similar risks
What delivery method can reduce and cut time the most when
compared to other methods?
Ans: Design-Build
What delivery method allows the contractor(s) to provide input on
design alternatives?
Ans: CM at Risk and Design-Build
All rights reserved © 2025/ 2026 |
Certified Construction Manager EXAM
Most Recent exam COMPLETE (2025)
EXAM Questions and Answers (Verified
Answers) (Latest Update 2025) UPDATE!!
Questions and Correct Answers/ Latest
Update / Already Graded
Construction Management
Ans: The practice of professional management applied to the
planing, design, and construction of projects, from inception to
completion, for the purpose of controlling time, cost, and
quality
Construction Contract Administration Objectives
Ans: To control: time, cost, quality, information flow and to
satisfy the Owner's goals and objectives for the project
Design Bid Build Advantages
Ans: Widely applicable, understandable, owner retains control,
owner "knows" the cost prior to the start of Construction
Design Bid Build Disadvantages
All rights reserved © 2025/ 2026 |
, Page |2
Ans: Relatively slow, owner is liable for the design,
constructability issues, adversarial relationships fostered
Multiple Prime Advantages
Ans: Increased Owner control, work easily fast-tracked, save
general contractor markups, some states require it
Multiple Prime Disadvantages
Ans: Owner has risk of controlling time and coo rdination,
multiple accountability for performance, unknown "final" cost
at construction start, same owner risks as traditional approach
CM at Risk Advantags
Ans: Well-suited for fast-tracking, contractor (and
subcontractor) input on design alternatives, better cost info,
permits "picking" of the builder
CM at Risk Disadvantages
Ans: Change of CM's accountability after, GMP (guaranteed
maximum price) is signed, tempted to sign GMP "too soon",
variations in procurement methods
All rights reserved © 2025/ 2026 |
, Page |3
Design-Build Advantages
Ans: Accountability for project delivery, reduced disputes, can
cut time and cost, builder can have input to
design/constructabibility, budget established early on
Design-Build Disadvantages
Ans: Early definition of the program required, owner's loss of
control during design, potential for quality to be compromised
What is True concerning delivery methods?
Ans: delivery methods are the forms of organizing the
construction project, all delivery methods have dis similar risks
What delivery method can reduce and cut time the most when
compared to other methods?
Ans: Design-Build
What delivery method allows the contractor(s) to provide input on
design alternatives?
Ans: CM at Risk and Design-Build