1. Time error correction: 60 +/- .02 Hz
2. ACE calculation frequency: Every 6 seconds
3. CPS1 measures how well a BA controls its generation and load management
programs to support interconnection frequency over a ___ period.: Rolling 1 year
4. A BA's BAAL cannot be exceeded for more than: 30 minutes
5. CPS1 minimum compliance level: CPS1 >= 100% , which is calculated and evaluated monthly
6. Contingency reserve requirements: Contingency reserves must be greater than or equal to the
most severe single contingency (MSSC).
7. Balancing contingency event can include a series of events separated by ___
or less: 1 minute
8. BAL-002: Reportable balancing contingency event: Results in MW loss described as:
80% of MSSC <= MW Loss <= MSSC
OR
>= 900 MW for East, 500 for West
9. contingency event recovery period: 15 minutes
Must be returned to ACE value prior to event. Responsible entity is not subject to compliance if it experiences multiple
contingencies defined as a single balancing contingency event, and the magnitude exceeds the MSSC
10. contingency reserve restoration period: 90 minutes
11. 1% change in frequency results in: 3% change in motor load (2% change in total load)
12. Typical tripping point for generators: 57 to 57.5 Hz
13. BAL-005: BA that is unable to calculate ACE for more than 30 min shall notify
the RC within ____ of the beginning of the inability to calculate ACE.: 45 minutes
14. BA's ACE calculation software must be available a minimum of ______ each
year.: 99.5%
15. BA's metering equipment used to calculate ACE must be available a mini-
mum of _____ each year and be accurate within _______.: 99.95% , .001Hz
16. Reliability assessment period: 1 hour or less before ramp: 10 minutes to complete assessment
1 - 4 hours before ramp: 20 minutes to complete assessment
1/6
, NERC Exam Preparation
Study online at https://quizlet.com/_hpryb7
4 hours or more: 2 hours to complete assessment
17. VAR-002: the GOP shall notify the TOP of any status changes to AVR, power
system stabilizer, or alternative voltage controlling device within ____.: 30 minutes
If capability is restored within 30 minutes, the GOP is not required to notify.
18. VAR-002: The GOP shall notify the TOP of any change to reactive capability
of a unit within _____.: 30 minutes
If capability is restored within 30 minutes, the GOP is not required to notify.
19. When communications capability failure with required entities occurs and
lasts more than _____, COM-001 requires RCs, TOPs, and BAs to notify those
entities within ______ of failure detection.: 30 minutes, 60 minutes
20. COM-001 requires each RC, TOP, and BA to test its alternative communication
capability at least ___________: Once each calendar month
Unsuccessful test required that the responsible entity initiate action to repair or designate a replacement within 2 hours.
21. COM-002: Each BA, TOP, and RC to assess its operation personnel's adher-
ence to the documented communication protocols and provide feedback to its
operating personnel on their performance at least once every_______.: 12 months
22. IRO-002: Each RC shall test its primary control center data exchange capabil-
ities for redundant functionality at least once every ______.: 90 days
If unsuccessful, the RC shall initiate action within 2 hours to restore redundant functionality.
23. EOP-004: Each responsible entity must report events according to their op-
erating plan by the later of ___________ after recognizing they met an event type
threshold.: 24 hours or the end of the next business day
24. Each IROL T_v shall be less than or equal to ________.: 30 minutes
25. TOP-001 requires that TOPs ensure that a real-time assessment is performed
at least once every ______.: 30 minutes
26. TOP-001: Each BA and TOP shall notify its RC and known impacted entities of
all planned outages, and unplanned outages of ______ or more, for telemetering