• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 15 pages
Exam (elaborations)

Dbia Practice Test Exam Newest 2025 Actual Exam Complete Questions And Correct Detailed Answers (Verified Answers) |Already Graded A+

Document preview thumbnail
Preview 2 out of 15 pages

DBIA PRACTICE TEST EXAM NEWEST 2025 ACTUAL EXAM COMPLETE QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+

Content preview

DBIA PRACTICE TEST EXAM NEWEST 2025 ACTUAL EXAM COMPLETE
QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS)
|ALREADY GRADED A+




Project Delivery System - ANSWER-How team members are organized, establishes
when parties engage, determines roles of parties, and determines sequence of
design, procurement, and construction (db, cmar, dbb)



Procurement Method - ANSWER-how team members are selected (QBS, best value,
low price, sole source)



contracting approach - ANSWER-how team members are paid (fp, gmp, cost
reimbursement, target price, unit price)



Design-Bid-Build (DBB) - ANSWER-linear, sequential process, A/E selected on
qualifications, GC selected on low price, design is fully completed without input from
GC, A/E acting in owner's interests, with a historically strong bond, process is well-
established and understood



construction manager at risk - ANSWER-similar org structure to DBB, construction
manager selected by QBS or best value, contractor provides precon services,
negotiated gmp contracting approach, open book estimating process, potential to
fast track project, construction cost determined before design completed, potential
issues over what is reasonably inferable from gmp design documents

, Design-Build - ANSWER-The owner contracts with one entity (a person or firm) to
provide both design and construction services, designer and contractor have a direct
contractual relationship, selected by QBS or best value, wide spectrum of
contracting approaches and organizational structures, single point responsibility,
owner does not manage designer, owner exposure to claims is significantly reduced



engineer procure construct (epc) - ANSWER-similar to design build, in industrial and
power generation sectors, systems and performance testing are central to scope,
contractor will typically perform engineering with its in-house staff, owner has need
for single point responsibility, contracts include plant and process performance
guarantees, contract items include performance and schedule liquidated damages
and limitations of liability



Multiple Prime Contracting - ANSWER-owner contracts with multiple trade
contractors, attributes are typically similar to dbb, owner's ability to schedule and
coordinate the work



Integrated Project Delivery (IPD) - ANSWER-multi-party agreement - all parties equal,
QBS procurement and target pricing contract approach, private sector use (limited
at this time), key: owner's ability to accept risk



public-private partnership (p3) - ANSWER-Instead of government building and
maintaining major infrastructure (such as highway, water treatment plant), build and
maintenance is outsourced to a private company. Opposed by public sector unions.
this is not considered a delivery system but its underlying approaches are delivery
systems and typically use DB. multiple procurement and contracting approaches



shift left - ANSWER-intense efforts to establish scope early in the process; drives
early team formation to include key trade subcontractors; can enable big decisions
to be made early, affect project outcomes at lowest cost, establish a need for co-
location and collaboration, and compress time during concurrent design and
construction

Document information

Uploaded on
October 19, 2025
Number of pages
15
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$17.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
DoctorDee
3.5
(6)
Sold
43
Followers
7
Items
6155
Last sold
3 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions