Q1. What 3 categories are the Best Practices organized into?
A: 1. Procurement
2. Contracting
3. Execution
Rationale: DBIA organizes its Best Practices around the major phases of a design-build project,
ensuring integration from selection to completion.
Q2. If these Best Practices are NOT implemented, there is an increased _____ that the project's
performance will be _____ and that some or all of the stakeholders will be _____.
A: Probability / Compromised / Disappointed
Rationale: Poor adherence to Best Practices increases the chance of performance failure and
dissatisfaction among project stakeholders.
Q3. _____ and _____ contracts are fundamental to any delivery process.
A: Fair / Clear
Rationale: Fair and clear contracts establish trust, reduce disputes, and ensure mutual
understanding.
Q4. Contracting principles apply to contracts of those working within the _____ _____.
A: DB Team
Rationale: Design-build success depends on well-structured internal agreements among all team
members.
Q5. This chapter has ___ Best Practices and ___ Implementing Techniques.
A:
Rationale: The DBIA Contracting Best Practices chapter outlines 3 main practices supported by
18 detailed implementation steps.
Q6. Contracts used on DB projects should be _____, _____, and _____ and should promote the
_____ aspects inherent in the DB process.
,A: Fair / Balanced / Clear / Collaborative
Rationale: Good DB contracts reflect shared risk, clarity, and teamwork — the foundation of
design-build delivery.
Q7. The contract between the _____ and the ______ _____ should address the _____ aspects of
the DB process, including expected standards of care for design services.
A: Owner / Design-Builder / Unique
Rationale: The Owner–Design-Builder contract must reflect the integrated and unique nature of
design-build roles and responsibilities.
Q8. The contracts between the _____ _____ and _____ _____ should address the _____ aspects
of the DB process.
A: Design-Builder / Team Members / Unique
Rationale: Internal DB contracts must align with the design-build philosophy to ensure
collaboration and consistency throughout the team.
Q9. Design-Build Done Right is the _____ of every DBIA certification course!
A: Core
Rationale: “Design-Build Done Right” is DBIA’s guiding principle and the foundation of all
certification and training content.
Q10. What are the 4 types of law?
A:
1. Contract Law
2. Tort Law
3. Statutes and Regulations
4. Common Law
Rationale: These legal categories define how obligations, liabilities, and professional
standards are created and enforced in construction.
Q11. _____ Law is based on the use of precedent.
A: Common
Rationale: Common law relies on judicial decisions and prior case rulings as legal precedent.
, Q12. Arbitration and mediation results don't provide direct _____.
A: Precedent
Rationale: These dispute resolution methods are private and not published, so they don’t create
binding legal precedent.
Q13. _____: a party offers to contract with one another.
A: Offer
Rationale: An offer expresses intent to enter into a binding agreement on defined terms.
Q14. _____: a party accepts the other party's offer.
A: Acceptance
Rationale: Acceptance creates mutual agreement, forming the basis of a valid contract.
Q15. _____: value exchanged for performance.
A: Consideration
Rationale: Consideration is what each party gives up or gains, making the contract legally
enforceable.
Q16. _____: the party making the contract must be legally able to do so.
A: Capacity
Rationale: A person or entity must have the legal competence to enter into binding agreements.
Q17. _____: the individual forming the contract must have authority to do so.
A: Authority
Rationale: The person signing must have proper authorization to legally bind their organization.
Q18. What are the 5 requirements for a valid contract?
A:
1. Offer
2. Acceptance
3. Consideration
4. Capacity
CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+ |
WITH A STUDY GUIDE
Q1. What 3 categories are the Best Practices organized into?
A: 1. Procurement
2. Contracting
3. Execution
Rationale: DBIA organizes its Best Practices around the major phases of a design-build project,
ensuring integration from selection to completion.
Q2. If these Best Practices are NOT implemented, there is an increased _____ that the project's
performance will be _____ and that some or all of the stakeholders will be _____.
A: Probability / Compromised / Disappointed
Rationale: Poor adherence to Best Practices increases the chance of performance failure and
dissatisfaction among project stakeholders.
Q3. _____ and _____ contracts are fundamental to any delivery process.
A: Fair / Clear
Rationale: Fair and clear contracts establish trust, reduce disputes, and ensure mutual
understanding.
Q4. Contracting principles apply to contracts of those working within the _____ _____.
A: DB Team
Rationale: Design-build success depends on well-structured internal agreements among all team
members.
Q5. This chapter has ___ Best Practices and ___ Implementing Techniques.
A:
Rationale: The DBIA Contracting Best Practices chapter outlines 3 main practices supported by
18 detailed implementation steps.
Q6. Contracts used on DB projects should be _____, _____, and _____ and should promote the
_____ aspects inherent in the DB process.
,A: Fair / Balanced / Clear / Collaborative
Rationale: Good DB contracts reflect shared risk, clarity, and teamwork — the foundation of
design-build delivery.
Q7. The contract between the _____ and the ______ _____ should address the _____ aspects of
the DB process, including expected standards of care for design services.
A: Owner / Design-Builder / Unique
Rationale: The Owner–Design-Builder contract must reflect the integrated and unique nature of
design-build roles and responsibilities.
Q8. The contracts between the _____ _____ and _____ _____ should address the _____ aspects
of the DB process.
A: Design-Builder / Team Members / Unique
Rationale: Internal DB contracts must align with the design-build philosophy to ensure
collaboration and consistency throughout the team.
Q9. Design-Build Done Right is the _____ of every DBIA certification course!
A: Core
Rationale: “Design-Build Done Right” is DBIA’s guiding principle and the foundation of all
certification and training content.
Q10. What are the 4 types of law?
A:
1. Contract Law
2. Tort Law
3. Statutes and Regulations
4. Common Law
Rationale: These legal categories define how obligations, liabilities, and professional
standards are created and enforced in construction.
Q11. _____ Law is based on the use of precedent.
A: Common
Rationale: Common law relies on judicial decisions and prior case rulings as legal precedent.
, Q12. Arbitration and mediation results don't provide direct _____.
A: Precedent
Rationale: These dispute resolution methods are private and not published, so they don’t create
binding legal precedent.
Q13. _____: a party offers to contract with one another.
A: Offer
Rationale: An offer expresses intent to enter into a binding agreement on defined terms.
Q14. _____: a party accepts the other party's offer.
A: Acceptance
Rationale: Acceptance creates mutual agreement, forming the basis of a valid contract.
Q15. _____: value exchanged for performance.
A: Consideration
Rationale: Consideration is what each party gives up or gains, making the contract legally
enforceable.
Q16. _____: the party making the contract must be legally able to do so.
A: Capacity
Rationale: A person or entity must have the legal competence to enter into binding agreements.
Q17. _____: the individual forming the contract must have authority to do so.
A: Authority
Rationale: The person signing must have proper authorization to legally bind their organization.
Q18. What are the 5 requirements for a valid contract?
A:
1. Offer
2. Acceptance
3. Consideration
4. Capacity